Laserfiche WebLink
Illinois Department Municipal Estimate of <br /> of Transportation Maintenance Costs <br /> Section Number 11 - 00000-01 - GM <br /> Period from 03/01/2011 to 12/31/2011 Municipality Village of Elk Grove Village <br /> Estimated Cost of Maintenance Operations <br /> Maintenance For Grou III or III Material E ui ment or Labor <br /> Operation Group Unit Operation <br /> (No.-Description) (I,Il,lli.ly) Item Unit Quaa!itL Price Cost Cost <br /> 2011 Hot-Mix Asphalt III Removal and Disposal of Cu Yd 355 $44.00 $ 15.620.00 <br /> Resurfacing Contract Unsuitable Material <br /> 100% MFT III Sub-Base Granular S Yd 3,180 $5.00 $ 15,900.00 <br /> Material,Type B 4" <br /> III Bituminous Materials Gallon 8,430 $0.50 $ 4,215.00 <br /> Prime Coat <br /> III Hot-Mix Asphalt Surface Ton 8,470 $66.00 $ 559,020.00 <br /> Course, Mix"C", N50 <br /> III Hot-Mix Asphalt Surface Scl Yd 84,130 $1.40 $ 117,782.00 <br /> Removal, 1-1/2" <br /> III Class D Patches, 6" Scl Yd 4,210 $35.00 $ 147,350.00 <br /> Total Day Labor Costs I <br /> Total Estimated Maintenance Operation Cost $ 859,887.00 <br /> Preliminary Engineering $ 0.00 <br /> Engineering Inspection $0.00 <br /> Material Testing $ 0.00 <br /> Total Estimated Engineering Cost N/A <br /> Total Estimated Maintenance Cost $ 859,887.00 <br /> Submitted: February 23, 2011 Approved: <br /> Date Date <br /> By: Vito P. Sammarco, P.E. Director of Public Works <br /> Municipal Official Title Regional Engineer <br /> Submit Four(4) Copies to Regional Engineer <br /> Page 1 of 1 8LR 14231 (Rev.2/23/06) <br /> Printed on 2(11(2011 3'.48'.44 PM <br />