HomeMy WebLinkAboutRESOLUTION - 51-03 - 8/12/2003 - AGREEMENT, REIMBURSEMENTRESOLUTION NO. 51-03 A RESOLUTION AUTHORIZING THE MAYOR AND VILLAGE CLERK TO EXECUTE A REIMBURSEMENT AGREEMENT BETWEEN THE VILLAGE OF ELK GROVE VILLAGE AND THE COOK COUNTY HIGHWAY DEPARTMENT (DEVON AVENUE WIDENING) NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois as follows: Section 1: That the Mayor be and is hereby authorized to sign the attached documents marked: REIMBURSEMENT AGREEMENT DEVON AVENUE BUSSE ROAD TO ELMHURST ROAD a copy of which is attached hereto and made a part hereof as if fully set forth and the Village Clerk is authorized to attest said documents upon the signature of the Mayor. Section 2: That this Resolution shall be in full force and effect from and after its passage and approval according to law. VOTE: AYES: 6 NAYS: 0 ABSENT., 0 PASSED this le day of August 2003. APPROVED this 121' day of August 2003. APPROVED: Craig B. Johnson, Mayor ATTEST: Ann I. Walsh Village Clerk ResReimAgm(DevonAvewidening.doc THE COUNTY OF COOK VILLAGE OF ELK GROVE VILLAGE DEVON AVENUE BUSSE ROAD TO ELMHURST ROAD SECTION: 98-B 1117 -04 -RS REIMBURSEMENT AGREEMENT This REIMBURSEMENT AGREEMENT, made and entered into by and between the COUNTY OF COOK, a body politic and corporate of the State of Illinois, hereinafter called "COUNTY", and the VILLAGE OF ELK GROVE VILLAGE, a body politic and corporate of the State of Illinois, hereinafter called "VILLAGE". WITNESSETH WHEREAS, the COUNTY proposes to improve Devon Avenue from Busse Road to Elmhurst Road by widening said road, County Section: 98 -BI 117 -04 -RS; WHEREAS, the VILLAGE has an existing 300 mm water main adjacent to and crossing Devon Avenue in the area of a culvert extension; WHEREAS, encasement and relocation of the water main is a VILLAGE expense; WHEREAS, the VILLAGE has accepted COUNTY's offer to include the water main relocation in its improvement project; WHEREAS, VILLAGE prepared plans and estimates of quantities and award costs are available; and, WHEREAS, it is in the mutual best interest of the parties hereto to delineate said terms and responsibilities regarding the extent of VILLAGE work and the sharing of costs associated with said work. NOW, THEREFORE, in consideration of the mutual covenants contained herein, the above recitals and other good and valuable considerations, the parties hereto agree as follows: 1. The COUNTY shall relocate, to VILLAGE standards, 295 meters and encase 37 meters of 300 mm water main at VILLAGE expense, said work to include the costs of water main, sleeve, valves and valve boxes and appurtenant costs to install said water main as delineated in attached EXHIBIT A (estimated cost $97,715.00); 2. Upon notice from the COUNTY, the VILLAGE will pay to the COUNTY Fifty Thousand Dollars ($50,000.00) for watetmain items identified as VILLAGE responsibility herein and the remaining balance of the watermain costs following final inspection of the project and based upon actual quantities. Payment to the COUNTY shall be made by check, payable to the Treasurer of Cook County for deposit in COUNTY's Motor Fuel Tax Fund Account 600-600 and identified as Section: 98-B 1117 -04 -RS, mailed directly to the Superintendent of Highways; and, DEVON AVENUE SECTION: 98-B 1117 -04 -RS -2- 3. The VILLAGE shall own, operate and maintain the water main relocated as part of this project and this Agreement stands in lieu of a separate COUNTY Highway Permit for said facilities and the VILLAGE shall be bound to the general terms of COUNTY Highway Permits as they exist the date of execution of this Agreement by the COUNTY. This Agreement shall be binding and enure to the benefit of the parties hereto, their successors and assigns. IN WITNESS WHEREOF, the COUNTY and VILLAGE have caused this Agreement to be executed by their respective officials on the dates as shown. M EXECUTED BY COUNTY: M President, Its Board of County Commissioners This _ day of 2003 APPROVED AS TO FORM: Richard A. Devine, State's Attorney I Assistant State's Attorney EXECUTED BY VILLAGE OF ELK GROVE VILLAGE Craig B. Johnson Village President This 12thday of August —12003 ATTEST: ATTEST: Ann I. Walsh County Clerk Village Clerk (SEAL) (SEAL) Jul -09-03 09:34A EXHIBIT A ITEM # DESCRIPTION UNIT QUANTITY PRICE AMOUNT 7 FURNISHING AND PLACING TOPSOIL. 100MM C.M. 25.00 $35.99 $899.75 8 SODDING (SALT TOLERANT) &M. 300.00 $3.93 $1,179,00 29 P.C.C. DRIVEWAY PAVEMENT, 200MM S.M. 45.00 $40.60 $1,627.00 30 P.C.C. SIDEWALK, 125MM S.M. 58.00 $36.50 $2,117.00 32 DRIVEWAY PAVEMENT REMOVAL S.M. 45.00 $4.36 $196.20 35 COMBINATION CURB AND GUTTER REMOVAL METER 6.00 $9.27 $55.62 36 SIDEWALK REMOVAL S.M. 58.00 $7.63 $442.54 81 FIRE HYDRANTS TO BE MOVED EACH 1.00 $1,590.00 $1,590.00 82 FIRE HYDRANTS VERTICAL ADJUSTMENT (OVER 600MM) EACH 1.00 $643.00 $643.00 103 WATER MAIN, 150 MM (CL 52) METER 2.00 $100.00 $200.00 106 WATER MAIN, 300 MM METER 295.00 $140.00 $41,300.00 180 CUT AND CAP EXISTING WATER MAIN EACH 2.00 $2,000.00 $4,000.00 181 300MM GATE VALVE WITH VALVE BOX EACH 4.00 $2,200.00 $8,800.00 182 FITTINGS KG. 1,554.00 $3.98 $6,184.92 183 ABANDON EXISTING WATER MAIN AND FIRE HYDRANTS L.S. 1.00 $5,500.00 $5,500.00 164 CONNECTION TO EXISTING WATER MAIN EACH 3.00 $2,300.00 $6,900.00 185. SELECT GRANULAR TRENCH BACKFILL C.M. 113.00 $34.90 $3,943.70 186 FIR HYDRANT WITH AUXILIARY VALVE AND BOX EACH 1.00 $2,300.00 $2,300.00 187 POLYETHYLENE ENCASEMENT METER 295.00 $0.87 $256.65 188 600MM STEEL SLEEVE METER 37.00 $240.00 $8,880.00 195 REMOVE EXISTING BRICK SIGN PEDESTAL L.S. 1.00 $500.00 $500.00 $97,715.38