Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 01/29/2021 - 2021 MFT ProgramCAPITAL IMPROVEMENT COMMITTEE MEETING MINUTES James P. Petri Public Works Facility January 29, 2021 10:00 AM Present: Trustee Czarnik, Chairperson Trustee Franke Trustee Schmidt Staff: Matt Roan, Deputy Village Manager Christine Tromp, Director of Finance Colby Basham, Director of Public Works Brian Lovering, P.E., Chief Engineer Austin Pollack, Senior Management Analyst Chairperson Czarnik called the meeting to order at 10:02 AM. The Committee reviewed the proposed 2021 Street Maintenance Program, which includes the resurfacing of 8.0 miles of streets and the rehabilitation of curb, sidewalk and ADA compliant curb ramps. The proposed 2021 MFT program (3.9 miles) has an estimated construction cost of $1,414,885. The Village has also reserved $85,000 of MFT funds for asphalt material purchase for in-house roadway patching operations at various locations throughout the Village. The proposed 2021 Business Park program (2.9 Miles), which has an estimated construction cost of $1,531,349 will be funded utilizing funds from the Business Leaders Forum and the Busse/ Elmhurst TIF accounts. In addition to the 2021 MFT program, Arlington Heights Road from Newport Avenue to Brantwood Avenue is proposed to be rehabilitated with a letting later this fall. This project will provide vital infrastructure improvements to a 1.4 mile stretch of roadway from Newport Avenue to Brantwood Avenue as well as provide a new bi-directional turn lane. This new lane will create safer traffic turning movements throughout the corridor. In addition, the project will include pavement rehabilitation and curb removal and replacement, replacement and widening of the existing sidewalk from 4-feet to 6-feet on both sides of Arlington Heights Road, ADA ramp and pedestrian signal improvements, median landscape and retaining wall enhancements. Cook County is providing $4.4 million in funding, which will cover approximately 80% of the total project cost. The proposed Arlington Heights Road Rehabilitation project will be completed utilizing funds from Capital Project Fund. Staff is also proposing the continuation of the pavement rejuvenation program in the amount of $230,000 which will include all 9.8 miles of streets resurfaced in 2020. This program will be utilizing funds from the General Fund and Business Leader Forum accounts. The Committee approved the proposed 2021 Street Maintenance Program, as presented by Staff. Chairperson Czarnick adjourned the meeting at 11:08 AM. C: Mayor and Board of Trustees Village Manager Deputy Village Manager Village Clerk Fire Chief Chief of Police Director of Public Works Director of Finance Director of Community Development PROPOSED 2021 ROADWAY MAINTENANCE PROGRAM RESIDENTIAL STREET RESURFACING (MFT & REBUILD ILLINOIS) Street _ Begin End Surface Rank Last Resurfaced length ft FY21-22 Anders Drive South Glenn Trail Nerge Road 60 2010 202 $ 13240 Brandywine Avenue Arlington Heights Road Somerset Lane 52 2004 1,210 $ 79,320 Cardinal Lane Cutter;Lane Galleon Lane 54 2008 1,437 $ 94,211 Cumberland Circle East Somerset Lane Somerset Lane 62 2003 1,279 $ 83,846 Cumberland Circle West Somerset Lane Somerset Lane 59 2003 1,654 $ 108,418 Galleon Lane Long Boat Drive Cutter Lane 41 2003 1,880 $ 123,239 Grissom Trail Nerge Road Biesterfield Road 54 2010 2,780 $ 216,216 Hawk Lane Oriolel3rive Galleon Lane =�46 2003 1,275 $ 83,591 Oriole Drive Gaileon°Lane Plum Grove Road 48 2003 1,565 $ 102,589 Somerset Lane Wellington Avenue Devon Avenue 55 2004 . 2,382 $ 156,161 South Glenn Trail ; West Tenn Trail Grissom Trail 57 2010 974 $ 63,862 Tottenham Lane Somerset Lane Brandywine Avenue 53 2004 1,022 $ 79,492 West Glenn Trail -' Biesterfield Road South Glenn Trail 54 2010 2,709 $ 210,700 RESIDENTIAL PROGRAM ESTIMATE (3.9 Miles) $ 1,414885 BUSINESS PARK STREET RESURFACING (BLF) Street '` Begin End Surface "Rank Last Resurfaced Length ft FY20-21 Allan Drive ` North End Mark Street N/A 2008' 650 $ 69,384 so' naventure Drive Nerge Road East End 34 2005 694 $ 76,440 Estes Avenue TouhyAvenue Lively Boulevard 71 2011 2,000 $ 194,063 Katherine Way Kirk Street - Mark Street 71 2008 791 ;$ 76,747 Kirk Street: LnrelySoulevard Katherine Way 70 2008 1,796 $ 174,262 Mark Street Altan?riye Village Limits 54 2001 4,000 $ 398,077 Touhy Avenue Tonrii-Apad Lively Boulevard 63 2011 2,511 $ 258,090 Touhy Avenue LnrelyBoulevard- Busse Road 58 2011 2,930 $ 284,286 BUSINESS PARK PROGRAM'ESTIMATE 2.J 1Niles) $ 1,531,349 TouhyAvenue (Lively Blvd to Busse Road) fo be paid by Busse/Elmhurst TIF Project to be reimbursed by Cook County Departme t of Transportation Highway Department village shareof project is $687,000. TOTAL ROADWAY.IMP,RONEMENTS (8.0 Miles) $ 7,891,235 loft 1/28/2021 PROPOSED 2021 ROADWAY MAINTENANCE PROGRAM PAVEMENT REJUVENATION (Reclamite) Street Begin End Length ft FY20-21 Avon Road Penrith Ave Milbeck Ave 1,147 Brantwood Court Brantwood Ave End 292 Brantwood Place Brantwood Ave End 173 Creighton Avenue Keswick Rd John F. Kennedy Blvd 283 Grassmere Road Penrith Ave Brantwood Ave 978 Keswick Road Penrith Ave Brantwood Ave 1,500 Milbeck Avenue Keswick Rd Grassmere Rd 882 Milbeck Court Grassmere Rd End 428 Penrith Avenue Keswick Rd Brantwood Ave 1,651 Shelly Road, Arlington Heights Rd Brantwood Ave 443 Lindale Street Wildwood Rd End 225 Wildwood Road Oakton Ave E. Higgins Rd 1,975 Charing Cross Road W. Elk Grove Blvd Ridge Ave 3,343 Edgeware Road Charing Cross Rd Ridge Ave 1,385 Middlebury Lane Tower Ln Victoria Ln 1,820 Sussex Court Tower Ln Middlebury Ln 1,064 Beisner Road Gloucester Dr Winston Dr 1,124 Bradford Circle Winston Dr End 463 Lakeview Circle Winston Dr End 468 Parkview Circle Winston Dr End 465 Ruskin Circle Winston Dr End 489 Ruskin Drive Winston Dr Winston Dr 2,535 Chase Avenue Tonne Rd Toughy Ave 4,974 Morse Avenue Tonne Rd Busse Rd 5,248 Lunt Avenue Tonne Rd Busse Rd 5,267 Nerge Road Rohlwing Rd Devon Ave 4,382 Vermont Drive Meacham Rd - Gibson Dr. 3,915 Newberry Drive Julie Dr Vermont Dr (20' East) 2,188 Gibson Drive Vermont Dr (20` East) Biesterfield Rd 770 Gibson Drive Vermont Dr California St 670 Concord Lane Vermont Dr Hampshire Dr 595 Liberty Court Gibson Dr End 303 Stowe Circle ` Vermont Dr End 184 Yale Court Gibson Dr End 243 TOTAL PAVEMENT REJUVENATION PROGRAM (9.82 Miles) b 230,000 2of2 1/28/2021 W iifA