HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 01/29/2021 - 2021 MFT ProgramCAPITAL IMPROVEMENT COMMITTEE
MEETING MINUTES
James P. Petri Public Works Facility
January 29, 2021
10:00 AM
Present: Trustee Czarnik, Chairperson
Trustee Franke
Trustee Schmidt
Staff: Matt Roan, Deputy Village Manager
Christine Tromp, Director of Finance
Colby Basham, Director of Public Works
Brian Lovering, P.E., Chief Engineer
Austin Pollack, Senior Management Analyst
Chairperson Czarnik called the meeting to order at 10:02 AM.
The Committee reviewed the proposed 2021 Street Maintenance Program, which includes the
resurfacing of 8.0 miles of streets and the rehabilitation of curb, sidewalk and ADA compliant
curb ramps. The proposed 2021 MFT program (3.9 miles) has an estimated construction cost of
$1,414,885. The Village has also reserved $85,000 of MFT funds for asphalt material purchase
for in-house roadway patching operations at various locations throughout the Village. The
proposed 2021 Business Park program (2.9 Miles), which has an estimated construction cost of
$1,531,349 will be funded utilizing funds from the Business Leaders Forum and the Busse/
Elmhurst TIF accounts.
In addition to the 2021 MFT program, Arlington Heights Road from Newport Avenue to
Brantwood Avenue is proposed to be rehabilitated with a letting later this fall. This project will
provide vital infrastructure improvements to a 1.4 mile stretch of roadway from Newport Avenue
to Brantwood Avenue as well as provide a new bi-directional turn lane. This new lane will create
safer traffic turning movements throughout the corridor. In addition, the project will include
pavement rehabilitation and curb removal and replacement, replacement and widening of the
existing sidewalk from 4-feet to 6-feet on both sides of Arlington Heights Road, ADA ramp and
pedestrian signal improvements, median landscape and retaining wall enhancements. Cook County
is providing $4.4 million in funding, which will cover approximately 80% of the total project cost.
The proposed Arlington Heights Road Rehabilitation project will be completed utilizing funds
from Capital Project Fund.
Staff is also proposing the continuation of the pavement rejuvenation program in the amount of
$230,000 which will include all 9.8 miles of streets resurfaced in 2020. This program will be
utilizing funds from the General Fund and Business Leader Forum accounts.
The Committee approved the proposed 2021 Street Maintenance Program, as presented by Staff.
Chairperson Czarnick adjourned the meeting at 11:08 AM.
C: Mayor and Board of Trustees
Village Manager
Deputy Village Manager
Village Clerk
Fire Chief
Chief of Police
Director of Public Works
Director of Finance
Director of Community Development
PROPOSED 2021 ROADWAY MAINTENANCE PROGRAM
RESIDENTIAL STREET RESURFACING (MFT & REBUILD ILLINOIS)
Street
_ Begin
End
Surface
Rank
Last
Resurfaced
length
ft
FY21-22
Anders Drive
South Glenn Trail
Nerge Road
60
2010
202
$ 13240
Brandywine Avenue
Arlington Heights Road
Somerset Lane
52
2004
1,210
$ 79,320
Cardinal Lane
Cutter;Lane
Galleon Lane
54
2008
1,437
$ 94,211
Cumberland Circle East
Somerset Lane
Somerset Lane
62
2003
1,279
$ 83,846
Cumberland Circle West
Somerset Lane
Somerset Lane
59
2003
1,654
$ 108,418
Galleon Lane
Long Boat Drive
Cutter Lane
41
2003
1,880
$ 123,239
Grissom Trail
Nerge Road
Biesterfield Road
54
2010
2,780
$ 216,216
Hawk Lane
Oriolel3rive
Galleon Lane
=�46
2003
1,275
$ 83,591
Oriole Drive
Gaileon°Lane
Plum Grove Road
48
2003
1,565
$ 102,589
Somerset Lane
Wellington Avenue
Devon Avenue
55
2004 .
2,382
$ 156,161
South Glenn Trail
; West Tenn Trail
Grissom Trail
57
2010
974
$ 63,862
Tottenham Lane
Somerset Lane
Brandywine Avenue
53
2004
1,022
$ 79,492
West Glenn Trail
-' Biesterfield Road
South Glenn Trail
54
2010
2,709
$ 210,700
RESIDENTIAL PROGRAM ESTIMATE (3.9 Miles)
$ 1,414885
BUSINESS PARK STREET RESURFACING (BLF)
Street '` Begin
End
Surface
"Rank
Last
Resurfaced
Length
ft
FY20-21
Allan Drive ` North End
Mark Street
N/A
2008'
650
$ 69,384
so' naventure Drive Nerge Road
East End
34
2005
694
$ 76,440
Estes Avenue TouhyAvenue
Lively Boulevard
71
2011
2,000
$ 194,063
Katherine Way Kirk Street -
Mark Street
71
2008
791
;$ 76,747
Kirk Street: LnrelySoulevard
Katherine Way
70
2008
1,796
$ 174,262
Mark Street Altan?riye
Village Limits
54
2001
4,000
$ 398,077
Touhy Avenue Tonrii-Apad
Lively Boulevard
63
2011
2,511
$ 258,090
Touhy Avenue LnrelyBoulevard-
Busse Road
58
2011
2,930
$ 284,286
BUSINESS PARK PROGRAM'ESTIMATE 2.J 1Niles)
$ 1,531,349
TouhyAvenue (Lively Blvd to Busse Road) fo be paid by Busse/Elmhurst TIF
Project to be reimbursed by Cook County Departme t of Transportation Highway Department village shareof project is $687,000.
TOTAL ROADWAY.IMP,RONEMENTS (8.0 Miles) $ 7,891,235
loft
1/28/2021
PROPOSED 2021 ROADWAY MAINTENANCE PROGRAM
PAVEMENT REJUVENATION (Reclamite)
Street Begin
End
Length
ft FY20-21
Avon Road
Penrith Ave
Milbeck Ave
1,147
Brantwood Court
Brantwood Ave
End
292
Brantwood Place
Brantwood Ave
End
173
Creighton Avenue
Keswick Rd
John F. Kennedy Blvd
283
Grassmere Road
Penrith Ave
Brantwood Ave
978
Keswick Road
Penrith Ave
Brantwood Ave
1,500
Milbeck Avenue
Keswick Rd
Grassmere Rd
882
Milbeck Court
Grassmere Rd
End
428
Penrith Avenue
Keswick Rd
Brantwood Ave
1,651
Shelly Road,
Arlington Heights Rd
Brantwood Ave
443
Lindale Street
Wildwood Rd
End
225
Wildwood Road
Oakton Ave
E. Higgins Rd
1,975
Charing Cross Road
W. Elk Grove Blvd
Ridge Ave
3,343
Edgeware Road
Charing Cross Rd
Ridge Ave
1,385
Middlebury Lane
Tower Ln
Victoria Ln
1,820
Sussex Court
Tower Ln
Middlebury Ln
1,064
Beisner Road
Gloucester Dr
Winston Dr
1,124
Bradford Circle
Winston Dr
End
463
Lakeview Circle
Winston Dr
End
468
Parkview Circle
Winston Dr
End
465
Ruskin Circle
Winston Dr
End
489
Ruskin Drive
Winston Dr
Winston Dr
2,535
Chase Avenue
Tonne Rd
Toughy Ave
4,974
Morse Avenue
Tonne Rd
Busse Rd
5,248
Lunt Avenue
Tonne Rd
Busse Rd
5,267
Nerge Road
Rohlwing Rd
Devon Ave
4,382
Vermont Drive
Meacham Rd -
Gibson Dr.
3,915
Newberry Drive
Julie Dr
Vermont Dr (20' East)
2,188
Gibson Drive
Vermont Dr (20` East)
Biesterfield Rd
770
Gibson Drive
Vermont Dr
California St
670
Concord Lane
Vermont Dr
Hampshire Dr
595
Liberty Court
Gibson Dr
End
303
Stowe Circle `
Vermont Dr
End
184
Yale Court
Gibson Dr
End
243
TOTAL PAVEMENT REJUVENATION PROGRAM (9.82 Miles)
b 230,000
2of2
1/28/2021
W
iifA