HomeMy WebLinkAboutORDINANCE - 1497 - 11/24/1981 - LAND USE & ZONING MAPORDINANCE N0. 1497
AN ORDINANCE APPROVING THE CONCEPTUAL LAND
USE AND ZONING MAP FOR CERTAIN PROPERTIES
ZONED A-3 COMBINED MULTI -FAMILY RECREATIONAL
DISTRICT (CENTEX HOMES MIDWEST, INC.)
WHEREAS, Centex Homes Midwest, Inc., has filed an applica-
tion with the Village Clerk of the Village of Elk Grove Village
for approval of a Conceptual Land Use and Zoning Map for
property legally described hereinafter, pursuant to Section
5.37-4 of the Zoning Ordinance of the Village of Elk Grove
Village; and
WHEREAS, the Plan Commission of the Village of Elk
Grove Village sitting as a Zoning Commission, at public
meetings duly called and held according to law considered
the application for approval of the Conceptual Land Use Map
and further considered special conditions which said Conceptual
Land Use and Zoning Map should be subject to pursuant to
Subparagraph B. of Section 5.37-4 of the Zoning Ordinance; and
WHEREAS, the President and Board of Trustees after
having considered the recommendations and findings of said
Zoning Commission find and believe it to be in the best
interest of the Village to approve the Conceptual Land Use
and Zoning Map hereinafter incorporated by reference subject
to the conditions hereinafter set forth;
NOW, THEREFORE, BE IT ORDAINED, by the President and Board
of Trustees of the Village of Elk Grove Village, Counties
of Cook and DuPage, Illinois as follows:
Section 1: That approval is hereby given the Conceptual
Land Use and Zoning Map prepared by Henderson and Bodwell dated
August 4 , 1981, three (3) copies of which are on file
in the Office of the Village Clerk, said Conceptual Land Use
and Zoning Map being for property legally described on Exhibit
A. attached hereto.
Section 2: That the approval of the Conceptual Land Use
and Zoning Map above described is subject to all of the conditions
set forth on Exhibit B. attached hereto and by this reference
incorporated herein.
Section 3: That this Ordinance shall be in full force
and effect from and after its passage and approval according
to law.
VOTES: AYES: 5
NAYS:
ABSENT: p
ATTEST:
Village Clerk
APPROV
i r
Village Presi nt�
PASSED
this
24th
day
of
November
1981.
APPROVED
this
24th
day
of
November
, 1981.
- 2 -
EXHIBIT B
CONDITIONS TO APPROVAL TO
CONCEPTUAL LAND USE AND ZONING MAP
Condition No. 1:
Those portions of the Subject Property designated for multi-
family use shall contain no less than a total of 5400 square feet of
one or more children's recreational areas at locations designated by
the developer and approved by the Village Board currently with the
approval of any Final Land Use and Zoning Plat. Such area or areas
aggregating a maximum requirement of 5400 square feet shall be areas
t
created for the use of children up to twelve years of age based on
anticipated need for such a facility or facilities at the time of the
approval of any Final Land Use Map. At the request of the Village
Board, developer shall equip any such general recreational area or
areas with play equipment designed to accommodate children up to
twelve years of age. The 5400 square feet is to be allocated to the
various phases, if any, of the development. Such maximum amount of
recreational areas may be reduced by action of the Board of Trustees
as it relates to the Subject Property designated for multi -family use
or any phase of development.
Condition No. 2:
The provisions of Section 3.9 et. seq, of the Zoning ordinance,
as may be amended from time to time concerning parking requirements and
standards, shall be applicable to establish off-street parking require-
ments for those portions of the Subject Property designated for multi-
family use, provided that (i) the Village Board may require greater or
lesser off-street parking at the time of the approval of the Final Land
Use and Zoning Map as to any phase or phases of the development, and
provided further that (ii) in no event shall the maximum number of
off-street parking spaces which the Board may require exceed 2.4 spaces
per actual dwelling unit within any phase or phases of the development.
Condition No. 3:
The provisions of Section 5.37-5(D).5 as they relate to the
Subject Property shall be one hundred (100) feet.
- 2 -
Condition No. 4:
That right-of-way designated "University Lane" IL its Inter-
section with Plum Grove Road, shall be a minimum of three lanes, with
a barrier -type median strip separating two westbound lanes from one
eastbound lane. The length of the three lanes shall be determined by
the Village Engineer. Deceleration lanes shall be provided on the
east side of Plum Grove Road, subject to final engineering and further
subject to County approval based upon County regulations and require-
ments in effect at the time of the construction of University Lane.
Condition No. 5:
That right-of-way designated "University Lane" shall intersect
Plum Grove Road no less than two hundred fifty (250) feet north of the
right-of-way commonly known as Weathersfield Way, Schaumburg, Illinois,
where the right-of-way for Weathersfield Way intersects with Plum Grove
Road.
Condition No. 6:
Except as otherwise provided in Condition No. 4, public
streets within the subject property which directly connect to state
and county roads ,hall be (i) twenty-eight (28) feet wide from back
of curb to back of curb and (ii) be located within a sixty (60) foot
right-of-way. All other public streets within the subject property
shall be (i) twenty-eight (28) feet wide from back of curb to back of
curb, (ii) be located within a fifty (50) foot right-of-way and (iii)
shall provide a ten (10) foot utility easement on each side of such
street if deemed necessary by the village Engineer. Public improvements
located within either a right-of-way or easement abutting a right-of-
way, not including gas, electric, telephone and cable TV, shall be the
property of the Village.
Condition No. 7:
Cul-de-sacs within the subject property shall not (i) exceed
900 feet in length; (ii) have less than a seventy (70) foot right-of-way
diameter with a sixty-eight (68) foot pavement diameter at the cul-de-sac
bulb; and, (iii) provide a fifteen (15) foot perimeter easement in which
- 3 -
Condition 11o. 7 (continued)
sidewalks may be located. The minimum right-of-way width at the
entrance to the turnaround of any cul-de-sac shall be fifty (50) feet.
All cul-de-sacs shall provide a looped water system if required by
the village Engineer. In the event any cul-de-sac exceeds 400 feet
in length, then the pavement width shall be thirty-five (35) feet
from back of curb to back of curb for the entire length of the cul-
de-sac. In the event any cul-de-sac is 400 feet, or less in length,
then the pavement width shall be twenty-eight (28) feet from back of
curb to back of curb.
Condition No. 8:
Private common driveways may be permitted within the subject
property at locations designated by the developer and approved by the
Village Board at the time of the approval of the Final Land Use and
Zoning Map.
Condition No. 9:
Buildings located with those portions of the subject property
designated for multi -family use shall be located no less than thirty-
five (35) feet from high water .sines of dry detention area; and wet
retention areas as those terms are used and defined in the Subdivision
Control Ordinance. However, in no event, shall the high water line
encroach upon the area designated for multi -family use.
Condition No. 10:
Developer shall convey those portions designated on the
Conceptual Land Use and Zoning Map as general recreational areas to
the Village under terms, conditions, and subject to such covenants
and restrictions as may be approved by the Village Attorney.
The A-3 zoning shall not be effective as to the Subject
Property unless and until such a conveyance is completed.