HomeMy WebLinkAboutRESOLUTION - 6-95 - 2/14/1995 - SECOND ADDENDUM TO AGRMT RESOLUTION NO. 6-95
A RESOLUTION AUTHORIZING THE VILLAGE PRESIDENT AND VILLAGE
CLERK TO EXECUTE A SECOND ADDENDUM TO THE AGREEMENT (4/14/92)
BETWEEN THE VILLAGE OF ELK GROVE VILLAGE AND TRITON CONSULTING
ENGINEERS, LTD. (BIESTERFIELD ROAD - 1-290 TO WELLINGTON AVENUE)
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees
of the Village of Elk Grove Village, Counties of Cook and DuPage, State of
Illinois as follows:
Section 1 : That the Village President be and is hereby authorized to
sign the attached documents marked:
ADDENDUM TO
CONSTRUCTION ENGINEERING
SERVICES AGREEMENT
a copy of which is attached hereto and made a part hereof as if fully set
forth and the Village Clerk is authorized to attest said documents upon the
signature of the Village President.
Section 2: That this Resolution shall be in full force and effect
from and after its passage and approval according to law.
PASSED this 14th day of February , 1995.
APPROVED this 14th day of February , 1995.
Mich III A- Tos L
VillaTe Fr—esLlent Pro tem
ATTEST:
Patricia S. Smith
Village Clerk
Addendum to
Construction Engineering
Services Agreement
Route: FAU Route 1339
Project : Biesterfield Road
County: Cook
Federal Aid Project No. : STPM-6003 (920)
State Section: 91-000035-00-WR
Job No. : C-91-166-91
This is an ADDENDUM to the CONSTRUCTION ENGINEERING SERVICES
AGREEMENT between the VILLAGE OF ELK GROVE VILLAGE, COON COUNTY,
acting through its President and/or Board of Trustees,
hereinafter referred to as the "VILLAGE" , and Triton Consulting
Engineers, Ltd. , 830 North Meacham Road, Schaumburg, Illinois
60173 , a firm of consulting engineers, hereinafter referred to as
the "CONSULTANT" .
WHEREAS, the construction operations necessary to complete
the project required additional construction services, and
WHEREAS, the circumstances which necessitate this supplement
were not reasonably foreseeable at the time the agreement was
signed.
Therefore, the VILLAGE proposes to expand the scope of
services ,for the Construction Engineering Services Agreement
dated June 25, 1993 , with TRITON CONSULTING ENGINEERS, LTD.
The Village proposes to revise the original upper limit of
compensation from $153 , 526 (Exhibit A-1) to $174, 134 (Exhibit A-2) .
In consideration of these premises, the parties hereto agree
as set forth in these following pages number 1 through 3
inclusive .
This ADDENDUM to the CONSTRUCTION ENGINEERING SERVICES
AGREEMENT executed this 14th day of February 1994�
ATTEST: VILLAGE OF ELK GROVE VILLAGE
BY: Patricia S. Smith BY: Michael A. Tosto
TITLE : Village Clerk TITLE: President Pro tem
ATTEST TRITON CONSULTING ENGINEERS, LTD .
BY BY Z6
Vice President V President
0) 0 N 0 a ko
m co IL * -1 0 m
c 0 0 m
0) m m 0
cr
C�j MU)
0 cc n
c)j
r
2 0)
M,
"1 0) CD
Co
'o . . I
m
m 00
0%
x a
Ul 0 (a CL m V 'I a I t 0
rL 2 2 05 x
CL = -0 LU
a m
U)
>
a. 0 a 054 �Q 00
-(OU SE 00 C�o C�o CNO Cc, col
U_Q v
m
:p�o 'm c"no N�- V�
B 41 CL kc
cn
LLI
m
LU
Mom C9
IL Cc=
x U$
u
E-4
z 0
w r ID co m c
cc
P3
E
co
LU r �4 r U'
0 a
a) 44 u r_ M:
m Q) 0 a) C) I I
III p ro
Lu Cc
Q) U) 0
c 0 �4
0) > 43 w Q�
m
m (1)
0 0
=1 �4 0
4 6 :4 r
C) 0
ra w c 4J tr
10 v u r
0 P� 0 .- 3 0 H
a 0 Q a)
a > w Q) m a'
(I m r a) �; r
(1) 0 5 H 2: a) H
C7.2 0 z
a r. r 0 Z X m
0 9 C 0
0 z 0 -- .. p
0 �4
Q) > E 4 'S 0 m m
-W 0 m w 5 �5 r r (a
Q
a P4 u E 73 U �4
(D U M W a)
cm c �: u 0 r
c 0 0 0 w m
.2 zo u Q u > x
ct 0 0
cn a.
M 'D �o 0 cc
� 0 c c m H
HMMWVMV v
0
MCP
�J� m
r
co
0
0 CC CL
40 :3 4D
,e
to
a 03 co to m
SL x
CL LU m
m m
cc
CL 03,v) r-
cc P;O� r- co �00 N
CL
ko m m a%
ICDO 010
cu 00 ko
CL
V 0
LU (Y% " t ID V
a% I to co
7E C CL Crx
LU m 0 ca
(a tD
ID
tT �4 a �4
LU r (a r Q)
0.2 r4 a4 W t:r
u r
00 4J 44
9 0 a a 0
Q) p Q) :E I I
4.4
-H 0
>
�4
>
0
D4 X Z
0
r4 .1 1
ty 4J ty
c: U sz
0 0 CD -H :3 a)
0 k 0 0 41 a)
> m (L) w
(a r (D 9 9
r
H C: 41
10 a z c c x 0
r 0 0 0 W Q)
44 -�S M �O ra p
�4 > 0 z
a) 0 4) 4J M W
4J ul E 4J U U 4J (0 0
rA M (3) 15 0
KC —
LL, '0 U �4
�4 H Q)
CD r u 0 4
w 0 0 0 0 0) m
cu . . . . . . . .
0
-j cl) a.
STATE OF ILLINOIS
DRUG FREE WORKPLACE CERTIFICATION
This certification is required by the Drug Free Workplace Act (30ILCS 580/1 &
etseq). The Drug Free Workplace Act, effective January 1, 1992, requires that no grantee or
contractor shall receive a grant or be considered for the purposes of being awarded a contract
for the procurement of any property or services from the state unless that grantee or
contractor has certified to the State that the grantee or contractor will provide a drug free
workplace. False certification or violation of the certification may result in sanctions
including, but not limited to, suspension of contract or grant payments, termination of the
contract or grant and debarment of contracting or grant opportunities with the State for at
least one (1) year but not more than five (5) years.
For the purpose of this certification, "grantee" or "contractor" means a corporation,
partnership, or other entity with twenty-five (25) or more employees at the time of issuing
the grant, or a department, division, or other unit thereof, directly responsible for the
specific performance under a contract or grant of $5,000 or more from the State.
The contractor/grantee certifies and agrees that it will provide a drug free workplace
by:
(a) Publishing a statement:
(1) Notifying employees that the unlawful manufacture, distribution,
dispensing, possession or use of a controlled substance,
including cannabis, is prohibited in the grantee's or contractor's
workplace.
(2) Specifying the actions that will be taken against employees for
violations of such prohibition.
(3) Notifying the employee that, as a condition of employment on
such contract or grant, the employee will;
(A) abide by the terms of the statement; and
(B) notify the employer of any criminal drug statute
conviction for a violation occurring in the workplace no
later than five (5) days after such conviction.
(b) Establishing a drug free awareness program to inform employees about:
(1) The dangers of drug abuse in the workplace;
(2) The grantee's or contractor's policy of maintaining a drug free
workplace;
(3) Any available drug counseling, rehabilitation, and employee
assistance programs; and
(4) The penalties that may be imposed upon an employee for drug
violations.
(c) Providing a copy of the statement required by subparagraph (a) to each
employee engaged in the performance of the contract or grant and to
post the statement in a prominent place in the workplace.
(d) Notifying the contracting or granting agency within (10) days after
receiving notice under part (B) of paragraph (3) of subsection (a) above
from an employee or otherwise receiving actual notice of such
conviction.
(e) Imposing a sanction on, or requiring the satisfactory participation in a
drug abuse assistance or rehabilitation program by, any employee who
is so convicted, as required by Section 5 of the Drug Free Workplace
Act.
(f) Assisting employees in selecting a course of action in the event drug
counseling, treatment, and rehabilitation is required and indicating that
a trained referral team is in place.
(g) Making a good faith effort to continue to maintain a drug free
work-place through implementation of the Drug Free Workplace Act.
THE UNDERSIGNED AFFIRMS, UNDER PENALTIES OF PERJURY, THAT HE
OR SHE IS AUTHORIZED TO EXECUTE THIS CERTIFICATION ON BEHALF OF
THE DESIGNATED ORGANIZATION.
Triton Consulting Engineers
A Division of JBM Enpineers & Planners, Inc.
Printed Name of Organization
Signature tf Authorized Representative Requisition/Contract/Grant
ID Number
—George T. March - Vice President /7. 1995
Printed Name and Title Date