HomeMy WebLinkAboutRESOLUTION - 43-94 - 7/26/1994 - AGRMT/BARTON ASCHMAN/ENGINEER. SERVICESRESOLUTION NO. 43=94 A RESOLUTION AUTHORIZING THE VILLAGE PRESIDENT AND VILLAGE CLERK TO EXECUTE AN AGREEMENT BETWEEN THE VILLAGE OF ELK GROVE VILLAGE AND BARTON-ASCHMAN FOR TRAFFIC ENGINEERING SERVICES (DEVON AVENUE TO HIGGINS ROAD) NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois as follows: Section 1: That the Village President be and is hereby authorized to sign the attached documents marked: AGREEMENT TRAFFIC ENGINEERING SERVICES DEVON AVENUE TO HIGGINS ROAD a copy of which is attached hereto and made a part hereof as if fully set forth and the Village Clerk is authorized to attest said documents upon the signature of the Village President. Section 2: That this Resolution shall be in full force and effect from and after its passage and approval according to law. PASSED this 26th day of July 1994. APPROVED this 26th day of July 1994. Dennis J. Gallitano Village President ATTEST: Patricia S. Smith Vi age C er BARTON-ASCHMAN =F��sot�s 's arlsr oaT;.nnr: ,aour'cr; t,lan ruv Harlon-AecIman ASSOC] ate S. Inc - 570 Daws Streit - EvanSen. Illinois 60 01 LISA - ( 70°)191-10nr] . i- ix (706) 475-00^3 July 27, 1994 Ms. Mary Jo Pyre, P.E. Assistant Village Engineer 901 Wellington Avenue Elk Grove Village, Illinois 60007-3499 Re: Feasibility Study Traffic Signal Interconnect for Arlington Heights Road Devon Avenue to Higgins Road Dear Ms. Pye: Barton-Aschman Associates, Inc., is pleased to submit this contract proposal for professional engineering services in connection with above -referenced project. The scope of work and engineering fees contained herein are based on our response dated June 30, 1994 to the village's Request for Proposal for this project. It is our understanding that Barton-Aschman has been formally approved by the village board for this project and that upon execution of this contract proposal we will be authorized to proceed. Section I: Project Description The work covered by this scope of services will include the investigation and feasibility of a traffic signal interconnect along Arlington Heights Road from Devon Avenue to Higgins Road. Specific tasks are outlined in Section II. Section II: Scope of Services Task 1: Data Collection The project team will focus initially on collecting pertinent data as it relates to the existing traffic signal hardware, available existing traffic count information, and existing roadway plans. This information will be collected by soliciting available information from Elk Grove Village and the Cook County Highway Department (CCHD), supplemented with a comprehensive field reconnaissance of the project area. This information will be used to establish base -line conditions for the feasibility study and to augment local agency consensus building for the project. If recent traffic count information is not available at critical locations within the project area, Barton-Aschman may conduct 24-hour tube counts at these critical locations to identify primary traffic patterns within the study area. Intersection turning -movement counts will not be conducted as part of the feasibility study. LNJ ?AR5CNB Ms. Mary Jo Pye, P.E. July 27, 1994 Page 2 Task 2: Local Agency Coordination Barton-Aschman will arrange a meeting with Elk Grove Village, CCHD, and IDOT to discuss the feasibility study. The meeting(s) will serve to identify the goals of the project and to explore funding mechanisms for the interconnect, if it is deemed feasible. An initial coordination meeting will be held prior to completion of Task 1 to allow for early project notification to the various local agencies. Further meetings would be held, as warranted, to review the status of the project and the feasibility report. Task 3: Feasibility Report Barton-Aschman will prepare a technical memorandum outlining our findings and recommendations for the proposed traffic signal interconnect on Higgins Road. As part of this study, we will prepare an Engineer's Opinion of Probable Construction Cost for the installation of a distributive closed-loop system. The technical memorandum will also outline the feasibility of such a system from both fiscal and physical perspectives. The feasibility report will be reviewed with the village for acceptance and concurrence. Upon approval of the feasibility report by the village, Barton-Aschman will provide ten (10) copies to the village for its use and distribution. Section III: Time of Performance Barton-Aschman is prepared to begin work on this assignment upon receipt of an executed copy of this contract proposal. We will complete the data collection, Task I, within three weeks from receipt of an executed copy of this proposal. Local agency coordination, Task II, will be done throughout the course of the project as needed. A draft feasibility report will be prepared upon completion of data collection and an initial coordination meeting with the local agencies. The draft feasibility report will be ready for review by the village eight weeks after receipt of a signed contract. The final feasibility report will be completed within two weeks after receipt of review comments by Elk Grove Village. Section IV: Fees Our fees for services will be computed and invoiced based on a cost -plus -fixed -fee format in accordance with the fee schedule shown in Attachment A. We will not accrue fees in excess of the project budget shown below without specific written authorization from Elk Grove Village. Direct expenses, which are itemized in Attachment A, will be billed at cost. Attachment A Engineering Hours and Cost Traffic Signal Interconnect Feasibility Study Elk Grove Village Fee Computation Summary 1. Direct Labor Cost Summary Task Classification Hours $1,474.00 Average Rate $100.00 Total A. Data Collection Principal 2 x 31 — $62.00 Senior Engineer 4 x 21 — $84.00 Engineer 8 x 19 — $152.00 Clerical 21 x 14 — $28.00 B. L. A. Coordination Principal 4 x 31 — $124.00 Engineer 16 x 19 — $304.00 Clerical 2 x 14 — $28.00 C. Feasibility Report Principal 4 x 31 1 $124.00 En ineer 24 x 19 = $456.00 Clerical 8 x 14 — $112.00 TOTAL PERSON HOURS = 74 Subtotal: Salary Costs + Overhead + Fixed Fee = $4,254.00 TOTAL RAW SALARY COSTS = $1,474.00 2. Direct General & Administrative Overhead $100.00 (Raw Salary x Overhead Rate) $200.00 $1,474.00 x 1.60 = $2,358.00 3. Subtotal: Sum of Items 1 & 2 $3,832.00 4. Fixed Fee (Profit): Salary & Overhead Costs x 11% $3,832.00 x 0.11 = $422.00 Subtotal: Expenses = $425.00 TOTAL PROJECT BUDGET $4,679.00 Subtotal: Salary Costs + Overhead + Fixed Fee = $4,254.00 5. Direct Expenses Mileage $75.00 Reproduction $100.00 Computer $200.00 Courier/Fax $50.00 Subtotal: Expenses = $425.00 TOTAL PROJECT BUDGET $4,679.00 Ms. Mary Jo Pye, P.E. July 27, 1994 Page 3 Section V: Method of Payment Our invoices for these services will be submitted every four weeks and will reflect charges incurred on the project the previous four weeks. Invoices will show staff time and expenses separately. Invoices are due and payable within 30 days of the invoice date. If payment is not received within 30 days, Barton-Aschman may stop work on this project until payment is received. Barton-Aschman would provide written notice to Elk Grove Village seven calendar days prior to stopping work. Thank you for this opportunity to serve Elk Grove Village. If you find this proposal satisfactory, please execute it, and return three copies to us for final signature. Upon receipt of the executed proposal, we will proceed with this assignment. If you have any questions, please call. Sincerely, BARTON-ASCHMAN ASSOCIATES, INC. G. Michael Ziegler, P. E: Principal Associate Glenn E. Schirmer, P.E. Vice -President and Contracting Officer GMZ/GES:pas ACCEPTED AND APPROVED BY: (Sig7dt� Dennis J. Gallitano, Village President (Typed Name) ATTEST: Patricia S. Smith, Village Cerk Authorized to Execute Agreements tor: Elk Grove Village July 26, 1994 Date (g=-5)py.M7.pro