Loading...
HomeMy WebLinkAboutRESOLUTION - 55-91 - 11/12/1991 - DEED OF CONV/BILL OF SALE ACCEPTED RESOLUTION NO. 55-91 A RESOLUTION ACCEPTING A DEED OF CONVEYANCE/BILL OF SALE FROM GULLO INTERNATIONAL OFFICE AND INDUSTRIAL CENTER (STANLEY STREET) WHEREAS, the Developer, Gullo International Development Corporation has submitted a Deed of Conveyance/Bill of Sale to the Village of Elk Grove Village as required by the Subdivision Control Ordinance and fully complied with all provisions of any and all Ordinances pertaining; and WHEREAS, the Developer has satisfactorily submitted all necessary items as required by the Village and has submitted required As-Built Engineering Plans. NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, Illinois: Section 1: That the Village of Elk Grove Village does hereby accept a Deed of Conveyance/Bill of Sale and Maintenance Guarantee from Gullo Inter- national Development Corporation on the "Project" known as Gullo Inter- national Office and Industrial Center, Elk Grove Village, Illinois, 60007 and described on the "As-Built" engineering plans prepared by The Chia Company, 5732 Gardner Court, Hanover Park, Illinois 60103 dated January 22, 1986 which plans are incorporated by reference and made a part hereof. Section 2: That this Resolution shall be in full force and effect from and after its passage and approval according to law. PASSED this 12th day of November , 1991. APPROVED this 12th day of November , 1991. Charles J. Zettek Village President ATTEST: Patricia S. Smith Village Clerk DEED OF CONVEYANCE/BILL OF SALE KNOW ALL MEN BY THESE PRESENTS, that CU1W INrKUMCNAL DOVEUNK�2" (the "Developer") , located at 1260 IANEMEIM ISD, IIR CROM VIUAG+., ILLINDIS 60007 a COEWOPATICN (corporation, partnership, individual) authorized to do business in the State of Illinois, for and in consideration of the sum of One Dollar ($1.00) and other good and valuable consideration in hand paid, the receipt and sufficiency of which are hereby acknowledged, does hereby Grant, Sell, Transfer Over, Convey and Deliver unto the Village of Elk Grove Village (the "Village") , Cook and DuPage Counties, Illinois, a municipal corpor- ation, to and for its own use forever the following: UNDERGROUND IMPROVEMENTS 1X1 Watermain and Appurtenances QX Sanitary Sewer and Appurtenances QStorm Sewer and Appurtenances F7 Lift Station and Force Main Other SURFACE IMPROVEMENTS XO Roadways (Curb 6 Gutter/Pavement) (Street ?lames) 1-1 Sidewalks Q Parkway Trees Traffic Control/Street Signs Storm Water Retention/Detention Basins Other cont'd. . . IMPROVEMENT DESCRIPTION: (X ) Watermain and Appurtenances ( X) Sidewalk (X ) Sanitary Sewer and Appurtenances ( ) Street Lights (X ) Storm Sewer and Appurtenances ( X) Parkway Trees ( X) Roadway (Curb and Gutter) ( ) Ponds (Detention/Retention ( ) Roadway (Markings) ( ) Other (Lift Station. . .etc. ) CERTIFICATIONS: DESIGN ENGINEER'S CERTIFICATION To the best of my knowledge and belief, the construction of the above described improvement has been completed in accordance with the referenced approved plans and specifications. OCTOBER 10, 1991 S (DATE) (IL. P.E. NO.) (SI TURE) SEAL DEVELOPER/OWNER CERTIFICATION FIELD INSPECTORS CERTIFICATION I hereby certify that I (we) have regularly inspected the above described improvements during the progress of construction and that to the best of my/our knowledge and belief the work has been completed in conformance with the approved plans and specifications. OC10ffit 10, 1997 PAWNER JOHN (DATE) (SI ATURE) (TITLE) CERTIFICATE OF APPROVAL AND INITIAL ACCEPTANCE SUBDIVISION: GULW INTERNATIDNAL OFFICE AND INDUSTRIAL CENTER (Project Name/Phase. . . . . .etc. ) Request is hereby made by GULW INTEMMUNRL D VFlDEM1W CORPORATION to the Village of Elk Grove Village to approve the subdivision/project described above. The following information is submitted in support of this request: ( g) Deed of Conveyance/Bill of Sale ( g) "As-Built" Engineering Drawings (3-print sets/1 mylar set) 10300 Q0{ ( g) Maintenance Guarantee (Bond, Letter of Credit. . .etc. OWNER(S)IDEVELOPER(S) : JOHN LOUD & CSE GULW ADDRESS: 1260 IAM UMEIE 2 IZCAD ELK CAVE `/III", ILLINOIS 60007 TELEPHONE: (708) 439-6000 REFERENCE: Plan No. — Sheets 1 - 7 Dated JAN. 22,1986& specifications. Prepared by THE CM CEDR19W - DON CLIA and approved by the village of Elk Grove Village. Cont'd. . ..... -a- located in the Project known as ("T IN1110UOICUAL OFFICE AND I CE111'ER , (the "Project") as described on the "as-built" engineering plans prepared by THE CM COMPANY — DON CIAGMA located a t 5732 GA UUR ODUPT, BANOVER PARK, ILLUDIS 60103 and dated JAS 22. 1986 which are incorporated by reference and made a part hereof. WHEREAS, the Developer does hereby warrant to the Village, it is the lawful owner of and has good and marketable title to the aforedescribed improvements; that the same are free from all encumberances; that the Developer has the right to Sell the same; and that the Developer warrants and will defend and hold harmless the Village against the lawful claims and demands of all persons with respect to the title hereby conveyed; and that the execution of this Bill of Sale/Deed of Con- veyance is an authorized Act of Said Corporation, Individual or Partnership. IN WITNESS WHEREOF, the Developer has caused this instrument to be signed and del v e thi IOlTI day of OC10)3ER , 19 91 � � CORPORATE OCTOBER 10, 1991 SEAL JOER (NAME) (DATE) PRESIDENT (TITLE) ATTEST: sAW)RA iCE1PE21 �DTART PJEUC 5TATE or 1W11015 r MY fAMt155WN E:D. rj.. 16,1i:$2 NOTARY �✓ OCTOBER 10, 1991 SEPL SANERA L. (NAME (DATE) — GHFGE GMM X' UGORNMOWNER(S) OCTOBER 10, 1991 (NAME) GULIU (DATE) VILLAGE INSPECTORun `� ( AME) T (DATE) -3- ASSISTANT VILLLAGE ENGINEER: CERTIFICATION All work required for this development has been inspected and found to be completed in a satisfactory manner. All documentation for acceptance has been submitted and found to be acceptable. 2 (DATE) �r AME) (TITLE) APPROVAL AND ACCEPTANCE OF GOVERNING AUTHORITY The VILLAGE OF ELK GROVE VILLAGE does hereby approve and accept for maintenance and operation the above described improvement. It is understood that the guarantee period of 24 months shall commence as of the date of Village Board acceptance. It is also understood that this approval and acceptance covers only the specific work indicated above and is subject to a final punch list being made concerning adjustment, alignment and necessary repairs of all structures, boxes, hydrants, ect. Acceptance of maintenance by the Village does not relieve the developer from the responsibility of keeping all dirt and debris due to cons- truction operations out of both storm and sanitary sewer systems. Final accept- ance of the subdivision or other general development is conditional upon com- pleting all indicated items on the final punch list. It is the responsibility of the owner or developer to request the final punch list to be made. No re- fund of maintenance escrow monies will be made until all items in the final punch list have been corrected. VILLAGE OF ELK GROVE VILLAGE BY: (DATE) S15-05-92 "7 "d O&W CASUALTY CO 'ANY PUBLIC IMPRO MENT MAINTENANCE BOND HOMEOFFICE DES MOINES KNOW ALL MEN BY THESE PRESENTS: That Gullo International Development of 1260 Landmeier Road, Elk Grove Village, IL corporation as Principal, and the EMPLOYERS MUTUAL CASUALTY COMPANY of Des Moines, Iowa as Surety, are held and firmly bound unto the Village of Elk Grove Village, IL (hereinafter called the Obligee) in the Penal Sum of Ten Thousand Dollars ($ in, _nnn-00 ) Dollars lawful money of the United States of America, for the payment of which, well and truly to be made, the Principal and Surety bind themselves, their and each of their heirs, executors, administrators, successors and assigns,jointly and severally, firmly by these presents. Whereas, the said Principal has completed a certain contract, Gullo International Office & Industrial Center Subdivision - Driveway Entrances in conformity with certain specifications; and submits said contract for acceptance by the Obligee. Whereas, a further condition of said contract is that the said principal should furnish a bond of indemnity, guaranteeing to remedy any defects in workmanship or materials that may develop in said work within a period of 2 years from the date of acceptance of the work under said contract;and Whereas, the said EMPLOYERS MUTUAL CASUALTY COMPANY of Des Moines, Iowa for a valuable consideration, has agreed to join with said principal in such bond or guarantee, indemnifying said Obligee, as afore- said; Now, therefore, the Condition of This Obligation is such, that if the said Principal does and shall, at his own cost and expense, remedy any and all defects that may develop in said work, within the period of 2 years from the date of acceptance of the work under said contract, by reason of bad workmanship or poor material used in the construction of said work, then this obligation to be null and void; otherwise to be and remain in full force and virtue in law. Date of Formal Acceptance of Contract: Signed and delivered this 18th day of 19— October 19 91 Bond Approved: Gullo International Development Corporation 1 Pri ipal 19— By: By; EMPLOYERS TUAL CASUALTY COMPANY For the Obligee Surety (An executed copy hereof is) (to be returned to the Surety) By: Attorney in Fact Kenneth D. Cumpston, Jr. Form 7028 Rev.2-77 -N4 055837 KENNETH D. CUMPSTON, JR. , INDIVIDUALLY, OAK BROOK, ILLINOIS--------------------------- ANY AND ALL BONDS April. 1, 1992 a< ,w,.,.o�appcdet ,�J`ac Jo,oa e _,�,(:2ay+,�;w�Vie•<oe' a •��`ac p 14th Febru v 89 4pec , 14th February 89 February 14, 1989 Kenneth D. Cumpston, Jr. October 91 18th