HomeMy WebLinkAboutRESOLUTION - 9-87 - 2/10/1987 - MOTOR FUEL TAX FUNDS RESOLUTION NO. 9-87
STATS W lLUMS
RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY
MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
BE IT RESOLVED,by the president and Board of Trustees ^f the
(Cava a Fva)est r )tad d naw)
Village of Elk Grove Village , Mino% that theta is hereby
(M. Ls0 v Tmvw) orae
appropriated the sum of$ s o 0,0 0 0 Motor Feel Tax funds for the purpose of Maintaining
streets and highways under the applicable provisions of the Illinois Highway Code,from January 1, 19._8.[_
to December 81,29-LL—
BE
9 R 7 _BE IT FURTHER RESOLVED,that only those streets, hlghways,and operations as Meted and described
an the approved Municipal Estimate of Maintenance Casts, including supplemental or revised estimates &P-
prow e3 to ooimsetiaa with this resolution,are eligible for-maintenance with Motor Fuel Tax funds during the
paiod as sped8ed above,
BE IT FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period
as given above, submit to the Department of Transportation, on forms furnished by said Department,a certified
statement showing expenditures from and balances remaining in the account(s)for this period;and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation,at Schaumburg Illinois.
APPROVED 1,1L. xPatriciA S_ Smith Villaop
11120. Kai.!e,0 v va m)
Clark In sad to? the V T 1 1 a9P
lay.nM v Tarp)
of Elk Grove Vlg, qty Cook & DUPage
19__ hereby oartity the foreaaias to be a txao, perfect and complete
Dsportmsnt of Transportation copy of a recoluttoa adopW by the Pregidpnt F Rri. of Trustees
(Cvaa v avrmr vSi 0�ar t xvaeve)
at a merdns o� February 10 1987
IN TSSTIHONY VAi MOP,I have heremw Set ray bead
District Engineer and Seel of. dy. of February
A.D. 097
(8EAL1 Patricia S. Smith
Village (lot
tam.sr.0 w amw)
BLR 4123(Rev.3.64)
srAa OF ILEUMS
MUNICIPAL ESTIMATE OF MAINTENANCE COSTS
iShest I of 2V
Period from January 1, 19 87 to December 31, 19-L7— Municipality--Village of Elk Grove Village
ESTIMATED COST OF MAINTENANCE OPERATIONS
MAINTENANCE OPERATION
MATERIAL, EOUIPMENT. OR LABOR
OPERATION
1MD^ ackw EEVIOTAL OYANTRT) ITEM AND SPECIFICATION RV101104 S QUANTITY UNIT AMOUNT COST
AND UNIT COST
BitUni]JOUS PaVMmt Da thing
(Material Only)
Bituminous Concrete 19.00 L50,350.00 50.350.00
Bituminous Concrete Resurfacing
(Contract)
Ritnminrtt 42 Aff) S_V_
(Partial Width)
1.00 30 329.00
(Full Width)
Area Reflective Crack 80.901 S.Y. .75 60 675.75
Control Treatment
Bituminous Material - Prime Coat 3.959 Gal, 5 2,573.35
Aggregate - Prime Coat 30 Ton 18.00 540.00 _
Bituninous Concrete Furfaae 11 .215 Tnn 28.00 314,020.00
446.712.10
Engineering (Contract) 2.500.00
TOTAL�IMATED MAINTENANCE COST - 499,562.10
SubmittAd 19 Approved 19
ey
>t micu`I ommAl TWO District Engineer
Submit Four (4) Copies to District Engineer
Form BLR 591 (1 of 2)
(Rev.8-75)
EM = Edge Milling
STATE OF ILLINOIS FWM = Full Width Milling
MUNICIPAL MAINTENANCE OPERATIONS CRACK CIL = Crack Control
RSF - Resurface
LOCATION SURFACE MAINTENANCE OPERATION
E%19TIN0
ETREET FRDM TO TYPE LENGTH WIDTH NO. DESCNIITION QUANTITY
1. Colorado Ln. Arizona Pass Nevada Ln 1071' 25" FM, Crack CPL, 14" RSF 3,047
2. Schirra Cir. _ 266' 25' gyp, lW' RSF 990_
3., Maar 4TL Rd 124' 251 EM. 14" RSF — 344
Cindy T.n 21271 _ 75' _Qy, 1;" MF _x,908,
5. Arrrstr2341 25' EM. 1'z" RSF
6. Hare Av AnRstronci Ln Nercie Rd 114' 25' FM. 1' " RSF 317
7. Hodlmair Ln Armstranq Ln JaTesway 1845' 25' EM 1'" RSF 5,161
8. Hodlmair Ct Hodhair Ln End 82' 66' EM, 1'y" RSF _ 696
9. Jameswa Hodhrair Ln Haise Ln 884' 25' EM, 11.- RSF 2,528
10. Jameslav Ct Jaure_swav Erid 110' 561 FM, W' RSF 830
11, Haise Ln Cindy Ln Volkhamer Tr 16771 79, IN lk" RSF 4.694
Raise Ct Haisp Tn End 1341 ` S}1r IL" RSF 632
11- Evans Ct Aldrin Tr End 244' 25' EM, 1'"RSF 1,089
14. Bradley Ln Mi T Parker Pl 775' 25' EM 1N" RSF 21189
1 Parker P1 Mitchell Tr Nerge Rd 11_96'_ 251 EM, 1's" RSF 3,536
16_ Westview Dr Lleammat Ilr 1n6S1 24' Fm _ 1?t RSP 7-912
17. Ridge Ct Ridge Av End 2571 24' FM, Crack CPL, 1' " RSF 960
18, Carswell Ct Carswell Ave502' Var EM. Crack CPL. 1'N" RSF 1,757
19• Maple Cr C ar .n = 7661 241 }Z,7 _Crick CPL. 1?;" RSF 2.324
.X), T.oye St Victoria Ln 1793' 21'LL PM_ Crack CrL, lk" RSF 4.453
21 - yirtnria T.n. P. Elk Rrrma R 1127' ' 3.126
?_ DelPhia Ct Delphia Ln End 181' 24' EM, Crack CPL, 1' " RSF 759
23. Lilac Lane Crest Ay Verde Ln 7741 ')4'6" 34, Crack CSL, 11" RSF 2.179
n
mor ; ty hia Ct orrinthia� End 425' FM. Crack ML. hl" RSF 1.635
Tonne Road N Landmeier Rd Devon Av 7222' 24'6" VM, Crack CTL, 2" RSF 19,786
26. wildwood P1 Wildwood Rd End 225` 241 IM Crack CPL 1 " RSF 877
27. Gaylord St. _]1¢gins Rd Bennett Rd 1018' 32' PWM, Crack CPL, 2" RSF 3,820
28,_ Scott St Higgins Rd Lee St 1868' 2' EM, Crack CPL, 2" RSP 6,867
29` Perrie Dr Landneiar Rd ' N nf Groie 1871' Variec IX Crack CPL. 11s" RSF 6.054
1:rova Terrare Perrie Dr yprria Dr 1146' 251 EM Crank =, IIS" RSF 3.255
Touhv Av 2586' 37' EM, Crack CPL, 2" RSF 11,023
Mac Av Landneier Rd Touhv Av 1076' 36' EM. Crack CPL, 2" RSF 41627
33- Arthur Ay R issp Rd E ' FIS] Only
,A- Nir�hnla� Rlvd Arthur Av �1( _�b4' FYn. Crack M,- RSF 3.852
Totals: 40,799 113,377
(7.73 Mil )
Submit Four (4) copies to District Engineer SLR 7303(Rev.3-84)
WAU Of IL!< MN
MUNICIPAL ESTIMATE OF MAINTENANCE COSTS
Period from January 1, 19 87 to Decernber 31, 19—K- Mtadeipallty- Vilage of Elk Grove Village
ESTIMATED COST OF MAINTENANCE OmATIONS
MATMIAL., a+ouln UNI.On uaow
MAINTWANC6 OrtRAT10N OrOIATWM
h1O'.�CwlnO1MRAL OYMrIIIh rrUW AND SPECUMMIRCH IIOaIOQ � MN
AOyr coat
coirr
Bituminous PavanPnt Patching
(Material Only)
Bituminous Concrete Binder' Course 2,750 Ton 19.00 52 250.00
g], nnina IC onrrr P !l Y' =g Course 1 800 Ton 21.00 37-800.00
0 Tbn 9.00 4,500.00
98.262.50
P.C. Concrete Ranoval and
Replacenent (Contract)
Replacenent 5"
Ccrnbination Concrete Curb and 14 500 L.F. 13.50 195 750.0
Latter Removal and Replacement
242.750.00
P.C. Concrete Sidewalk
Raising (Contract)
Mud'acking 12,000 S.F. 1.30 15,600.00
15,600.00
Bituminous Concrete
Resurfacing (Contract)
(Partial Width
Bituminous Surface Removal 30.329 S.Y. 1.00 30 329.00
Full Width
Area Reflective
Control Treat�ent
Aggregate - Prime Coat 30 Tons 18.00 540.00
Bitunmous Concrete 4
,020.0
Surface Course, Class I 446.712-10
Engineering (Contract
Plant and Field Testing 2.500.00
TOTAL WrIM^T MAOfrKHAW=COPT 805,824.60
Submitter 19 Approved 19
By
Yaefelwl offiew T!W
District Engineer
Submit Four (4) Copies to District Engineer
BLR 7302(Rev.3-84)