Loading...
HomeMy WebLinkAboutRESOLUTION - 9-87 - 2/10/1987 - MOTOR FUEL TAX FUNDS RESOLUTION NO. 9-87 STATS W lLUMS RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE BE IT RESOLVED,by the president and Board of Trustees ^f the (Cava a Fva)est r )tad d naw) Village of Elk Grove Village , Mino% that theta is hereby (M. Ls0 v Tmvw) orae appropriated the sum of$ s o 0,0 0 0 Motor Feel Tax funds for the purpose of Maintaining streets and highways under the applicable provisions of the Illinois Highway Code,from January 1, 19._8.[_ to December 81,29-LL— BE 9 R 7 _BE IT FURTHER RESOLVED,that only those streets, hlghways,and operations as Meted and described an the approved Municipal Estimate of Maintenance Casts, including supplemental or revised estimates &P- prow e3 to ooimsetiaa with this resolution,are eligible for-maintenance with Motor Fuel Tax funds during the paiod as sped8ed above, BE IT FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department,a certified statement showing expenditures from and balances remaining in the account(s)for this period;and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation,at Schaumburg Illinois. APPROVED 1,1L. xPatriciA S_ Smith Villaop 11120. Kai.!e,0 v va m) Clark In sad to? the V T 1 1 a9P lay.nM v Tarp) of Elk Grove Vlg, qty Cook & DUPage 19__ hereby oartity the foreaaias to be a txao, perfect and complete Dsportmsnt of Transportation copy of a recoluttoa adopW by the Pregidpnt F Rri. of Trustees (Cvaa v avrmr vSi 0�ar t xvaeve) at a merdns o� February 10 1987 IN TSSTIHONY VAi MOP,I have heremw Set ray bead District Engineer and Seel of. dy. of February A.D. 097 (8EAL1 Patricia S. Smith Village (lot tam.sr.0 w amw) BLR 4123(Rev.3.64) srAa OF ILEUMS MUNICIPAL ESTIMATE OF MAINTENANCE COSTS iShest I of 2V Period from January 1, 19 87 to December 31, 19-L7— Municipality--Village of Elk Grove Village ESTIMATED COST OF MAINTENANCE OPERATIONS MAINTENANCE OPERATION MATERIAL, EOUIPMENT. OR LABOR OPERATION 1MD^ ackw EEVIOTAL OYANTRT) ITEM AND SPECIFICATION RV101104 S QUANTITY UNIT AMOUNT COST AND UNIT COST BitUni]JOUS PaVMmt Da thing (Material Only) Bituminous Concrete 19.00 L50,350.00 50.350.00 Bituminous Concrete Resurfacing (Contract) Ritnminrtt 42 Aff) S_V_ (Partial Width) 1.00 30 329.00 (Full Width) Area Reflective Crack 80.901 S.Y. .75 60 675.75 Control Treatment Bituminous Material - Prime Coat 3.959 Gal, 5 2,573.35 Aggregate - Prime Coat 30 Ton 18.00 540.00 _ Bituninous Concrete Furfaae 11 .215 Tnn 28.00 314,020.00 446.712.10 Engineering (Contract) 2.500.00 TOTAL�IMATED MAINTENANCE COST - 499,562.10 SubmittAd 19 Approved 19 ey >t micu`I ommAl TWO District Engineer Submit Four (4) Copies to District Engineer Form BLR 591 (1 of 2) (Rev.8-75) EM = Edge Milling STATE OF ILLINOIS FWM = Full Width Milling MUNICIPAL MAINTENANCE OPERATIONS CRACK CIL = Crack Control RSF - Resurface LOCATION SURFACE MAINTENANCE OPERATION E%19TIN0 ETREET FRDM TO TYPE LENGTH WIDTH NO. DESCNIITION QUANTITY 1. Colorado Ln. Arizona Pass Nevada Ln 1071' 25" FM, Crack CPL, 14" RSF 3,047 2. Schirra Cir. _ 266' 25' gyp, lW' RSF 990_ 3., Maar 4TL Rd 124' 251 EM. 14" RSF — 344 Cindy T.n 21271 _ 75' _Qy, 1;" MF _x,908, 5. Arrrstr2341 25' EM. 1'z" RSF 6. Hare Av AnRstronci Ln Nercie Rd 114' 25' FM. 1' " RSF 317 7. Hodlmair Ln Armstranq Ln JaTesway 1845' 25' EM 1'" RSF 5,161 8. Hodlmair Ct Hodhair Ln End 82' 66' EM, 1'y" RSF _ 696 9. Jameswa Hodhrair Ln Haise Ln 884' 25' EM, 11.- RSF 2,528 10. Jameslav Ct Jaure_swav Erid 110' 561 FM, W' RSF 830 11, Haise Ln Cindy Ln Volkhamer Tr 16771 79, IN lk" RSF 4.694 Raise Ct Haisp Tn End 1341 ` S}1r IL" RSF 632 11- Evans Ct Aldrin Tr End 244' 25' EM, 1'"RSF 1,089 14. Bradley Ln Mi T Parker Pl 775' 25' EM 1N" RSF 21189 1 Parker P1 Mitchell Tr Nerge Rd 11_96'_ 251 EM, 1's" RSF 3,536 16_ Westview Dr Lleammat Ilr 1n6S1 24' Fm _ 1?t RSP 7-912 17. Ridge Ct Ridge Av End 2571 24' FM, Crack CPL, 1' " RSF 960 18, Carswell Ct Carswell Ave502' Var EM. Crack CPL. 1'N" RSF 1,757 19• Maple Cr C ar .n = 7661 241 }Z,7 _Crick CPL. 1?;" RSF 2.324 .X), T.oye St Victoria Ln 1793' 21'LL PM_ Crack CrL, lk" RSF 4.453 21 - yirtnria T.n. P. Elk Rrrma R 1127' ' 3.126 ?_ DelPhia Ct Delphia Ln End 181' 24' EM, Crack CPL, 1' " RSF 759 23. Lilac Lane Crest Ay Verde Ln 7741 ')4'6" 34, Crack CSL, 11" RSF 2.179 n mor ; ty hia Ct orrinthia� End 425' FM. Crack ML. hl" RSF 1.635 Tonne Road N Landmeier Rd Devon Av 7222' 24'6" VM, Crack CTL, 2" RSF 19,786 26. wildwood P1 Wildwood Rd End 225` 241 IM Crack CPL 1 " RSF 877 27. Gaylord St. _]1¢gins Rd Bennett Rd 1018' 32' PWM, Crack CPL, 2" RSF 3,820 28,_ Scott St Higgins Rd Lee St 1868' 2' EM, Crack CPL, 2" RSP 6,867 29` Perrie Dr Landneiar Rd ' N nf Groie 1871' Variec IX Crack CPL. 11s" RSF 6.054 1:rova Terrare Perrie Dr yprria Dr 1146' 251 EM Crank =, IIS" RSF 3.255 Touhv Av 2586' 37' EM, Crack CPL, 2" RSF 11,023 Mac Av Landneier Rd Touhv Av 1076' 36' EM. Crack CPL, 2" RSF 41627 33- Arthur Ay R issp Rd E ' FIS] Only ,A- Nir�hnla� Rlvd Arthur Av �1( _�b4' FYn. Crack M,- RSF 3.852 Totals: 40,799 113,377 (7.73 Mil ) Submit Four (4) copies to District Engineer SLR 7303(Rev.3-84) WAU Of IL!< MN MUNICIPAL ESTIMATE OF MAINTENANCE COSTS Period from January 1, 19 87 to Decernber 31, 19—K- Mtadeipallty- Vilage of Elk Grove Village ESTIMATED COST OF MAINTENANCE OmATIONS MATMIAL., a+ouln UNI.On uaow MAINTWANC6 OrtRAT10N OrOIATWM h1O'.�CwlnO1MRAL OYMrIIIh rrUW AND SPECUMMIRCH IIOaIOQ � MN AOyr coat coirr Bituminous PavanPnt Patching (Material Only) Bituminous Concrete Binder' Course 2,750 Ton 19.00 52 250.00 g], nnina IC onrrr P !l Y' =g Course 1 800 Ton 21.00 37-800.00 0 Tbn 9.00 4,500.00 98.262.50 P.C. Concrete Ranoval and Replacenent (Contract) Replacenent 5" Ccrnbination Concrete Curb and 14 500 L.F. 13.50 195 750.0 Latter Removal and Replacement 242.750.00 P.C. Concrete Sidewalk Raising (Contract) Mud'acking 12,000 S.F. 1.30 15,600.00 15,600.00 Bituminous Concrete Resurfacing (Contract) (Partial Width Bituminous Surface Removal 30.329 S.Y. 1.00 30 329.00 Full Width Area Reflective Control Treat�ent Aggregate - Prime Coat 30 Tons 18.00 540.00 Bitunmous Concrete 4 ,020.0 Surface Course, Class I 446.712-10 Engineering (Contract Plant and Field Testing 2.500.00 TOTAL WrIM^T MAOfrKHAW=COPT 805,824.60 Submitter 19 Approved 19 By Yaefelwl offiew T!W District Engineer Submit Four (4) Copies to District Engineer BLR 7302(Rev.3-84)