HomeMy WebLinkAboutRESOLUTION - 21-80 - 2/12/1980 - PERMIT FOR DRIVEWAY/COOK COUNTYRESOLUTION NO. 21-80
A RESOLUTION AUTHORIZING THE VILLAGE PRESIDENT TO SIGN A PERMIT
WITH THE COOK COUNTY HIGHWAY DEPARTMENT FOR THE CONSTRUCTION OF
A DRIVEWAY ENTRANCE, 15" CULVERT, AND SIDEWALK (GULLO, NORTHWEST
CORNER OF LIVELY BOULEVARD AND LANDMEIER ROAD)
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees
of the Village of Elk Grove Village, Counties of Cook and DuPage, Illinois:
Section l: That the Village President is hereby authorized to sign
a Permit with the Department of Highways of the County of Cook for the
construction of a driveway entrance, 15" culvert, and a sidewalk on
Landmeier Road, a copy of which is attached hereto and made a part hereof
as if fully set forth.
Section 2: That this Resolution shall be in full force and effect
from and after its passage and approval according to law.
PASSED
this
12th
day
of
February
ig80.
APPROVED
this
12th
day
of
February
1980.
Charles J. Zettek!
Village President
ATTEST:
Fay M. Bishop
Village Clerk
tac OF APPLICATION:
l0tb day of Jnnuallz 19 so
DEPARTMENT OF HIGHWAYS
OF
THE COUNTY OF COOK
Permit Number 79-12-916
PERMIT EXPIRES
r4 19_..
COOK COUNTY BUILDING
118 N. CLARK STREET, CHICAGO, ILLINOIS 60602
APPLICATION FOR A HIGHWAY ?ERMIT
WHEREAS , GULLO INTERMTIONAL� VIITAM GF ETR (TrA7E
of the County of_ -arc _; State . of Illinois-=-irisosc°adziress _
1201 Oakton St., Elk Grove Village, Illinois 60007
i3_901 Wellington Avenue, Elk Grove Village 60007
hereinafter termed the applicant , propose to construct,
install, maintain and operate the following described improvement on
County Highway known as Tar&reier Road,
State Aid Road No. 130 Section 1515
Cook County, Illinois, subject to the followiag conditions shown on Page
2 of this application, and request
perA13SiOn and authority to install, construct, operate and msi.ntai.n an 80'X1.5"
R.C.P. culvert with end sections and one (1) 48" diameter catch basin, along with a
20'X10" Pozz or 9' BAM base oommercial entrance return (15' radii) surfaced with 3V"
of bitLmdnous plant -mixed paving material on the north side of Landmeier Rd. at a
point 170 ft. west of the center line of Lively Blvd. (Drive shall be installed per-
pendicular
eripendicular to ianrhmier Rd.)
Also to construct andma.intain a 5'X5" P.C.C. sidewalk running in and along the north
parkway of ' ander W. on a line 1 ft. south of the north 50 ft. R.O.W. line, be-
ginning at the west R.O.W. line of Lively Blvd. and running west terminating at the
west property line, to service a proposed restaurant at Iandrreier Rd. and Lively Blvd.
The sidewalk called for herein shall be ramped for the handicapped in compliance with
the "State's Design Manual Co:nzdque - I-76-1" dated 3/3/76.
(Continued on reverse side of page)
A '�
Chief Engineer
(1)
Ir.s 4 President
plicaili,
\\
Address/a0/ 0.4A -7V&1
Approved and permit granted this
day of 19—_
County Superintendent of Highways
The contractor shall insure positive drainage under the supervision of a Cook County
Highway Deparbrent Permit Engineer.
The Village of Elk Grove hereby accepts full responsibility for the future maintenance,
replacement, removal and relocationof the sidewalk mentioned herein.
This permit does not call for the installation of any utilities in the R.O.W. of
Landmeier Pd.
The general contractor, before starting the job, will deposit with the Cook County
Highway Department, Permit Division, insurance as required on Foran "B."
A performance and R.O.W. restoration bond in the amount of $5,000.00 issued by
on bchalf of Gallo Interratiornl Develrp-
ment Co. has been deposited with the LPe mit Division of the Cook County F:ignway
Department.
THE PETITIONER AGREES TO TAKE ALL NECESSARY PRECAUTIONS TO PREVENT THE DEPOSIMr,
OF ANY MUD, CLAY OR OTHER DEBRIS ON THE HIG-TW BY HIS CONSTRUCTION OPERATIMIS/ANO
TO CAUSE THE DAILY REMOVAL OF SUCH MA'=S WHICH MAY BE DEPOSITED THEREON.
The signing of ranh-e er Rd. for the construction mentioned herein must be dcne
as shown on drawings 2299-7, 2300, 2302-21 2303-3, titled "Standard Design Typical
Application of Traffic Control Devices for Highway Construction and Maintenance."
TiE WORR CALLED FOR IN THIS PERMIT t ST BE PERFORMED AS STATED ABOVE AND ON FORM
NO. 1, ATTACHED MUM1O.
A COPY OF TEM PERMIT MST BE iln ON THE JOB SITE DURI G CONSTRUCTION OF THE WORK
DESCRIBED HEREIN.
PAGE 2 OF APPLICATION FOi A HIGHWAY PERMIT
MADE BY GULIA INlE14taTIONAL DEVELOPMENT 0D./VIZdAGE OF ELK G vw
1. That said applicant shall furnish all material to do all work
required, and pay all costs which may be incurred in connection
with such work, and shall prosecute the same diligently and with-
out delay to completion within the time hereinafter stated.
SEE STAND
2. That the construction work will be completed by the day of
, 19 , and shall be in accordance with the Standard
Specifications for Road and Bridge Construction of the Illinois
Department of Transportation adopted July 1, 1976 and
the Supplemental Specifications thereto of The County of Cook.
3. That upon completion of said work, said applicant shall, within
10 days, at its own cost, restore said highway substan-
tially to the same condition in which it was before said work was
commenced and shall remove all debris, rubbish, materials, apparatus,
tools and equipment, as well as all excess excavated materials, from
the right-of-way of said highway, all to the satisfaction_of t1le
County Superintendent of Highways for the County- o -f' Cook-
4. That should future construction and operation of said highway by
The County of Cook, require alteration or change of location of the
improvement referred to herein, such change shall be made by the
applicant upon the written request of The County of Cook, without
expense to the said County.
5. That the said applicant , � successor or assigns shall
assume all risk and liability for accidentsand damages that may accrue to
persons and property, during the prosecution of the work or any time
thereafter, by reason of the location, construction and work referred
to herein, and said applicant_agree .to indemnify and save harmless
the County of Cook, from any such claims for damages and from all costs
and expenses incurred on account thereof and in connection therewith.
6. All trenches and openings made in Cook County Highway Department
Right -of -Way shall be backfilled with sand or limestone screenings
adequately compacted in accordance with either Method 2 or Method 3
apecified in Article 603,08 of the State Standard Specifications,
and all pavement replaced under the supervision of the Cook County
Highway Department, Permit Engineer.
7. This opening must be inspected daily and additional bituminous
material must be placed, daily if necessary, to maintain the patched
area at the same elevation as the adjacent undisturbed pavement
surface, for a period of not less than _180 days.
No depressions or dips in the patched area will be permitted during
the above period of time.
All auger pits shall be a minimum of ten (10) feet from the edge of
pavement.
8. That all tunnels shall be securely braced and backfilled by pressure
Grouting.
9. That wool or steel sheeting shall be used to protect base course and
pavement if -deemed necessaryby th3 County Permit Engineer.
10. That if it is found during the progress of the work, that subterranean
conditions prohibit the construction of said improvement in and along
the alignment as outlined in the plans, it is expressly understood
that construction operations shall cease, if directed by the Permit
Engineer, until proposed revised alignment has been approved by the
Cook County Highway Department.
11. That without further action, The Cook County Highway Department
reserves the right to make connections to the proposed sewer for
the purpose of draining the highway.
12. That the Contractor or Applicant shall be responsible for providing
positive drainage.
(Continued on reverse side of page)
4
r
The contractor shall insure positive drainage under the supervision of a Cook County
Highway Department Permit Engineer.
The Village of Elk Grove hereby accepts full responsibility for the future maintenance,
replacement, removal and relocationof the sidewalk mentioned herein.
This permit does not call for the installation of any utilities in the R.O.W. of
Landmeier Rd.
The general contractor, before starting the job, will deposit with the Cook County
Highway Department, Permit Division, insurance as required on Form "B."
0.
A performance and R.O.W. restoration bond in the amount of $5,000.00 issued by
on behalf of Gallo International Develop-
ment Co. has been deposited with the ePermit Division of the Cook Cbuntyr Highway
Department.
THE PETITIONER AGREES TO TAKE ALL NECF.9SARY PRECAUTIONS TO PREVENT THE DMTOSITING
OF ANY MUD, CLAY OR OTHER DEBRIS ON THE HIMW BY HIS CONSTRUCTION OPERATIM S /Alia
TO CAUSE THE DAILY M1OVAL OF SUCH MATERIALS WHICH MAY BE DEPOSITED THEREON.
The signiaxJ of LarOmier Rd. for the construction mentioned herein mast be dr_ne
as shown on drawings 2299-7, 2300, 2302-21 2303-3, titled "Standard Design Typical
Application of Traffic Control Devices for Highway Construction and Maintenance."
THE WORK CALLED FOR IN THIS PENUT MST BE PERFORMED AS STATED ABOVE AND ON FORM
NO. 1, ATTACHED HERMiO.
A ODPY OF THIS PF1:M:T MSC BE KEPT ON THE JOB SITE DURIIVG CONSTRUCTION OF THE WORK
DESCRIBED HEREIN.
71,