HomeMy WebLinkAboutRESOLUTION - 93-80 - 9/23/1980 - MFT/PRATT NICHOLAS ENGINEERING FEES R3TAYEI�F II.I.IIdOIB Construction
RESOLUTWN FOR IMPROVEMENT dY MUNICIPALITY
UNDER THE ILLINOIS HIGHWAY CODE
BE IT RESOLVED, bytha President and Board of Trustees
f the
ConoW m Preddent and sa.d atetatt T
Village of Elk Grove Village Illinois
City.Town,w Wliev
that the following described street(s) be improved under the Illinois Highway Code:
riiiimn ON 7La90t6hn Yoan Ftvm To
Nicholas Boulevard Landmeier Road Pratt Boulevard
BE IT FURTHER RESOLVED,
1. That the proposed improvement Consist of construction and preliminary Engineering Plans
and specifications for the reconstruction of
Nicholas Boulevard.
(approximately 7500 lineal feet in length)
construction feet wide
and shall be designated as .. 78-00018-00 SP C.S.
2. That there is hereby appropriated the stun of gTwpnty Thrac Thn++sand anti Tin Hnndreri Fl oven & 5111Q
llarg ($ 23,211.51 ) for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That said work shall be done by Warren & Van PraaR, Inc. And,
Lw,sBct y Contraany z1 ar)
BE IT FURTIiER RESOLVED, that tire Clerk is hereby directed to transmit two certified copies of this resolution to the
district/regional office of the Department of Transportation.Mr
-
I. M+* Fay Bishop Village
APPROVED Clerk
Mrs. cats.Tawa.«vm..�t>
in and for the Village Of Elk Grove Village
(aty.Town.a v111mq)
County of Cook & Du Page hereby certify the foregoing
19—. to be a true, perfect and complete copy of a resolution adopted by the
oepar+men+ ar T.aneyar+a+ian President and Board of Trustees
QQ (Cognca nreddent end Bard d Ttvten) 't a meeting on
?r
dc1�9 it rI « x (' 19 .
IN TES/TIMONY WHEREOF, I have hereunto set my hand and seal this
D is+rict/Reg lona I En � 'n',
Engineer day of >�8 F t A.D.
(SEAL)
Clerk.
Mtn'Town.W vulm)
Form SLR 414
RESOLUTION NO. 93-80 (Rev. 12-73)