Loading...
HomeMy WebLinkAboutRESOLUTION - 115-80 - 12/16/1980 - COMPLETE SEWER SYSTEM REHABILITATIONRESOLUTION 1V0. 115-80 A RESOLUTION OF INTENT TO COMPLETE SEWER SYSTEM REHABILITATION PIO;i, T1MREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and Dupage, State of Illinois: Section 1. That the Village President be and is hereby authorized to .;iSn t: tach --d documc:ris marked, a Resolution of Intent to Complete Sewer System Rehabilitation,a copy of which is attached hereto and made a part hereof as if fully set forth and the Village Clerk is authorized to attest said documents upon the signature of the Village President. Section 2. That this resolution shall be in full force and effect I rom and after its passage and approval according to la,,.,. PASSED this 16th day of December , 1980. APPEOVED this 16th day of December , 1980• President Attest: Village Clerk Pr ect 7 Grove Village C17 231d-02 esigr_ Single Municipal PPA RESOLUTION OF INTEINT TO COMPLETE SEWER SYSTEM REHABILITATION Whereas, regulations of the U. S. Environmental Protection Agency r,:garding grants for construction of sewage treatment works, 40 CFR 35 E, require that the Village of Elk Grove Village must demonstrate that each sewer collection system discharging to the treatment works for which application for Step 2 and Step 3 grant assistance is made, is not or will not be subject to excessive or possible excessive infiltration/ inflow: Therefore, be it resolved by the Village of Elk Grove Village that, inasmuch as the sewer system evaluation survey(s) of the Village Of r,11, r ,, 77ilingp sewer system(s) has (have) been completed, and inasmuch as the results of the survey(s) define further rehabilitation work which must be completed, and inasmuch as some of the rehabilitation work may not be eligible for treatment works grant assistance, the Village of Elk Grove Villae herewith provides assurance that the (design and) construction of the rehab- ilitation work, including any grant ineligible rehabilitation work, shall be completed, in accordance with the following schedule: Item Schedule* design of rehabilitation work 12 months after project initiation construction of rehabili- tation work 12 months after construction start­.tp Resolved this 16th day of December 1.9 80 Name: /Z' �•�,,�!fr�•"- Title: Village President/ (Mayor, Village President, etc.) (SEAL) Name: Title: Village Clerk (Clerk, Secretary, etc.) In accordance with 40 CPR 35.935-16, not more than eightg percent (807,) of a Step 3 grant will he paid unless the schedule for completion of C-2 sewer system rehabilitation is being complied with. FRR/dkt 9/2/75