Loading...
HomeMy WebLinkAboutRESOLUTION - 23-79 - 4/24/1979 - ACCEPT MANAGEMENT RESPONSIBILITIESRESOLUTION NO. 23-79 A RESOLUTION ACCEPTING CERTAIN MANAGEMENT RESPONSIBILITIES AS A DESIGNATED MANAGEMENT AGENCY UNDER THE WATER QUALITY MANAGEMENT PLAN FOR NORTHEASTERN ILLINOIS WHEREAS, the Northeastern Illinois Planning Commission has prepared and adopted a water quality management plan for northeastern Illinois under the provisions of Section 208 of Public Law 92-500, and WHEREAS, the plan, upon its certification by the Governor and acceptance by USEPA, will be the official plan for northeastern Illinois and will be applicable to the jurisdiction of the Village of Elk Grove Village, and WHEREAS, the plan proposes that the Village of Elk Grove Village be designated as a management agency responsible for implementing portions of the plan and for cooperating and coordinating with other designated management agencies, and WHEREAS, the Village of Elk Grove Village has carefully reviewed its proposed responsibilities as set forth in the Statement of Management Responsibilities prepared by the Commission; NOW, THEREFORE, BE IT RESOLVED, that the Village of Elk Grove Village hereby agrees to accept its responsibilities as a designated management agency under the Water Quality Management Plan for northeastern Illinois as these responsibilities are identified in the Statement of Management Responsibilities, attached as Exhibit A, and made a part of this resolution; and be it further RESOLVED, that this acceptance of management responsibilities is made in recognition of the fact that water quality management planning will continue at the local, subregional, and areawide levels. This acceptance shall be subject to with- drawal or modification if the Village of Elk Grove Village finds on the basis of such planning that the commitments made by this resolution are no longer technically or financially feasible or if amendments to the 208 plan make such commitments no longer necessary. This acceptance shall remain in force unless and until withdrawn or modified by the Village of Elk Grove Village. PASSED this 24th day of April , 1979• APPROVED this 24th day of April , 1979• Charles J. Zettek Village President ATTEST: Fay Bishop Deputy Village Clerk EXHIBIT "A" ELK GROVE VILLAGE RESPONSIBILITIES AS A MANAGEMENT AGENCY Responsibilities for Controlling Point Sources of Water Pollution A. Implementation of Section 201 Facilities Plan To complete a required sewer system evaluation study for the separate sewer systems. The Village has applied for Federal grant monies to conduct sewer system evaluation studies to be completed within a five- year period if funds are available. B. Water Conservation 1. The Village has modified its building/plumbing codes in all new developments to require the installation of water conservation plumbing fixtures. 2. The Village requires metering of all new developments. 3. The Village revised its pricing policies in October, 1976. 4. The Village instituted public education programs to reduce water consumption. C. Phosphate Detergent Ban The Village shall consider the adoption of an ordinance banning the sale of high phosphate laundry detergents for domestic use. This would be in response to an area -wide action by all municipalities in Cook County. II. Non -Point Source Pollution from Storm Water Runoff A. Stormwater Detention The Village has already enacted stormwater detention requirements to limit runoff from newly developing areas. The Village agrees to cooperate with the local committee in developing consistency among local ordinances and determining standards. B. Soil Erosion and Sedimentation Control The Village will cooperate with the local committee in the development of consistent soil erosion and sedimentation control regulations. The Village will consider adoption of a soil erosion and sedimentation ordinance which will meet the 208 requirements. C. Implementation Programs The Village will work with other local agencies through the local committee management structure to develop and implement a program to reduce pollutants from stormwater runoff and develop plans and standards. D. Material Storage Controls The Village shall consider an ordinance to control surface runoff from open storage yards containing industrial stockpiles and materials which might go into solution or be carried away be stormwater runoffs. E. De-icing Practices Through the local committee, the Village will participate in programs designed to control the application of de-icing materials, to train personnel in proper application methods and to use proper equipment to minimize any negative water quality impacts. III. Responsibilities for Control of Non -Point Sources other than Stormwater Runoff A. Regulation of On -Site Disposal Systems The Village has already adopted the practice of prohibiting the installation of any new septic systems. IV. Responsibility to Participate in Local Water Quality Committee The Village will participate in the formation and operation of a county -wide water quality committee (as provided in Chapter 8 of the 208 Plan), and assist the committee in fulfilling its responsibilities includ- ing the following: A. Preparation and review of a three-year implementation program. B. Coordination of local water quality management efforts. C. Assistance in resolution of issues and conflicts. D. Participation in continuing water quality planning. - 2 -