HomeMy WebLinkAboutRESOLUTION - 72-78 - 9/12/1978 - LETTER OF GUARANTEE CIRCLE BAY RESOLUTION NO. 72-78 A RESOLUTION ACCEPTING A LETTER OF GUARANTEE IN LIEU OF A PERFORMANCE BOND FROM NORTHWEST FEDERAL SAVINGS, GUARANTEEING THE CONSTRUCTION OF PUBLIC IMPROVEMENTS AND SURFACE COURSE REQUIREMENTS FOR THE CIRCLE BAY DEVELOPMENT LOCATED NORTH OF DEVON AVENUE AND WEST OF BERKENSHIRE LANE NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois: Section 1 . That the President and Board of Trustees do hereby authorize the acceptance of a Letter of Guarantee in lieu of a Performance Bond, from Northwest Federal Savings, guaranteeing the construction of public improvements at the Circle Bay Development, said improvements as shown on Exhibit "A" attached hereto and made a part hereof. Said property located north of Devon Avenue and west of Berkenshire Lane in Elk Grove Village. Section 2. The Letter of Guarantee also guarantees that if the surface course or one inch of asphalt is not made by August 30, 1980, at the demend of the Village of Elk Grove Village said funds will be released for the purpose of completing the surface course requirments of the Subdivision Control Ordinance of the Village. Section 3• That this resolution shall be in full force and effect from and after its passage and approval according to law. PASSED this 12th day of September 1978. APPROVED this 12th day of September 1978 Village Ves'd of 1 ATTEST: Deputy/ Village c rk NORTH WEST FEDERAL SAVINGS 2454 DEMPSTER STREET• DES PLAINES. ILLINOIS 60016• 296-0900• DAVID J. DENWOOD, President August 31, 1978 Mr. Charles A. Willis Village Manager Village of Elk Grove 901 Wellington Elk Grove Village, Ill. 60007 RE: Letter of Guarantee Circle Bay Dear Mr. Willis: We are construction lenders for the above development. We under- stand that you require a guarantee in the amount of $835,000.00 covering items contained on Exhibit "A", attached hereto. We hereby certify to you that we will set aside the above amount of the loan for payment of the above mentioned items. As work progresses, disbursements will be made on these items upon submission of proper waivers by the Contractors, approved by the Village's Engineer and inspected by North West Federal Savings and Loan Association. In the event the improvements with the exception of the one inch topping (second lift) are not made by August 31, 1980, we will, at your demand, release said funds to you for the purpose of complet- ing the aforementioned work. If the one inch topping (second lift) is not completed by March 1, 1981, we will release the balance of the funds required to finish the toppings to you at your demand. The amounts to be released, pursuant to the above provisions, are specified on the attached Exhibit "A". NORTH WEST FEDERAL SAVINGS AND LOAN ASSOCIATION OF CHICAGO Craig R! Karas Vice President CRK/mb F MLI ry� r APPLIED 1886 HICKS ROAD ENGINEERING ROLLING MEADOWS,IL.,60009 COMPANY AREACODE(312)991.7668 C0HOULTING CAM RNOM91111e ENGINEER'S ESTZ`tATE OF COST FOR CIRCLE SAY SUBDIVISION ELK GROVE VILLAGE COOK COD?71T, ILLTiTOIS JUNE 26,1978 REVIS3D: JULY 12,1978 UNIT ITIN DESCRIPTIONQUANTITY UNIT PRICE TOTAL AMOUNT A. EARTHWORK 1. Detention Basin Topsoil Excavat- ion (2' Deep) 13,600 C.T. $ 1.20 $ 16,320.00 2. Building Pads in Lots Topsoil Excavation (1' Deep) 15,:00 C.Y. 1.20 18,600.00 3. Stroet Topsoil excavation (1' Deep x 32' Wide) 4,100 C.Y. 1.20 4,920.00 4. Detention Basin Topsoil Restoration (6" Deep m 2 Acres, 117.651 Compacted) 1,900 C.Y. 2.50 4,750.00 5. Lots 6 Parkway Topsoil Restora- tion (1' Deep) 22,400 C.Y. 2.50 56,000.00 6. Sod For Detention Basin 9,680 S.Y. 1.50 14,520.00 7. Seeding over C.H.P.A. .20 Acres 1,200.00 240.00 S. Detention Basin, Street b Building Pad Clay Excavation 64,500 C.Y. 1.20 77,400.00 9. Soil Testing LIMP SU`1 2,500.00 Sub-Total Earthwork - ------- $ 195,250.00 -1- MUNICIPAL UTILITIES TOPOGRAPHY LAND PLANNING FEASIBILITY STUDING APPLIED ENGINEERING COMPANY CONSULTING CIVIL ENGINEERS &IGLYEER'S ESTIMATE OF COST CIRCLE BAY SUBDIVISION ELY GROVE VILLAGE C00& COUPI'1"l, ILLINOIS B. SANITARY SEWR - 017-SITE UNIT ITTII DESCRIFTI03UQ ANTITY UNIT PRICE TOTAL A OUITT 1. 10" Diameter Trues Pipe (including T.V. inspection) 230 L.F. $ 18.00 $ 4,140.00 2. 10" Diameter Iron Pipe Ductile (including T.V. inspection) 165 L.F. 25.00 4,125.00 ?. 48" Diameter Precast Concrete — - Manholes, cGmplete 2 Ea. 650.00 1,300.00 4. Pavement Removal S Replacement at 3arkeneahire Lane and Devon (saw cut edges, compact suo- grade, provide expansion joints at new manhole E replace 61 S.Y. 8" P.C.C. Pavement) 60 S.Y. 40.00 2,400.00 5. Berkenshire Lane Parkway Restora- tion LUttP SU"* 300.00 6. Trench Backfill 265 L.F. 6.00 2,120.00 Sub--Total Sanitary Sever (Off-Sit_)-- — $ 14,$85.00 SANITARY SEWER - ON-SITE 1. 10" Diameter Truss Pipe (including T.V. inspection) 1,500 L.F. $ 13.00 $ _ 19,500.00 2. 8" Dizmeter Pipe Ductile (including T.V. inspection) 2,490 L.F. 11.00 57,190.00 3. 48" Diameter Precast Concrete :Manhole, complete 13 Ea. 650.00 8,450.00 -2- APPLIED ENGINEERING COMPANY CONSULTING CIVIL ENGINEERS ENGINEER'S ESTL14ATE OF COST CIRCLE BAY SUBDIVISION ELZ GROVE VILLAGE, COOK COMM, ILLINOIS B. SANITARY SEWER - CN-SITE (Continued) UNIT ITZ4 DESCRIPTION QUANTITY UNIT PRICE TOTAL AMOUNT 4. 48" Diameter Precast Concrete $ $ Manhole t12 with Shear Gate, complete 1 Ea. 750.00 750.00 5. 48" Diameter Precast Concrete Manhole 43 with Shear Gate b Flush Valve, complete 1 Ea. 850.00 850.00 6. 6" P.V.C. ?tear Service 54 Ea. 150.00 8,100.00 7. 6" P.V.C. Far Service, including Trench Backfill 40 Ea. 550.00 22,000.00 8. Concrete Flcaoement 20 L.P. 15.00 300.00 9. Trench Backfill 230 L.?. 7.50 1,725.00 Sub-Total Sanitary Saver (On-Site)-------- ------ $ 89,065.00 C. HATER MAIN - OYF-SITE 1. 12" D. I.W.M. 115 L.F. 17.00 $ 1,955.00 2. A" rate Valve 6 43" Diameter Vault, complete 1 Ea. 800.00 500.00 3. Restoration of R.O.W. LU1-1P SUM - 500.00 4. Trench Sac4i 4111 130 L.P. 6.50 84=.00 Sub-Total Water Mala (Off-5±te)------j 4,100.' 1) -3- APPLIED ENGINEERING COMPANY CONSULTING CIVIL ENGINEERS l'0 PlIGIVEER' .5 '.iSTL'LATF OF CUST C17CLL•' B.v_' SUEDIVISIGN ELK GROVE ,VTI U=E CC ,K COUN , ILLINO?S C. y4ATER !!.;kTN - GN-517Z UNIT TT DESC'.?IPTTON Q II.11r"TITS UNIT PRICE. TOTPJ, PKO�SIT I. 12" D.I.'d.a. 995 L.;, $ 17.00 $ 16,915.00 2. 3" D.I.S.H. 3,693 L.1r. 12.00 '*4,340.00 3. 12" Gate Valve 6 Valve Box, Complete 1 Ea. 650.00 630,00 5. 8" Gate Valve n Valve Aox, CoIaplete 9 Ea. 300.G0 2,730.00 5. ?fro. Iwirant with uxil.:ry .11ve, 19 ?a. 300.00 15,1;0.x0 6. 3/4" r_;pe K Covver Tear ger-Ice, 3-sox Corp. CDC--, complete 40 2s1. 175.00 OOC,JO 7. 3/4" T'Tpe K Copper ?ar Servlc•�, 3-13:... Corp. Cock, Trench 3.+.aki111, comolete 54 �a. 550.00 29, 700.00 c. 7rer.ch ackfiil 200 L.. . 6.50 1.300.00 :uh-Total Plater 'gain 'On-Sita)------ $ 117,305.00 1. 87" .. ;3"C.H.P.A. , 14 Gage, $ lrclud'_a; Trench backfill ^.o Top of Pipes 310 L.?. 95.00 19,41-0.00 2. 73" . 51)" I;.?!.P. \. 14 ;aye, i^ciidin,^, :':vncti CncF-fi11. to Tim Oki, Pi:„e 295 L.F. 80.U0 _. 66” C.J.P. 14 k1age, includinX T.eucii 3ackfill to Top of Pipe 75 L.2. 10.017 6,OCf .U0 -4- APPLIED ENGINMEPING COMPANY CONSULTING CIVIL ENGINEERS ENGINEER'S ESTIMATE OF COST CIRCLE BAY SUBDIVISION ELN- GROVE VILLAGE, COOK COMM, ILLINOIS D. STOPv tvVERS (Ccntinve d) UNIT ITEM DESCRIFTTON MANTh71 UNIT PRICE T,--TPJ, A;4OU2IT 4. 30" R.C.P. Claes III 625 L.F. $ 24.00 $ 15,OGO.00 5. 15" R.C.P. Class M 300 L.F. 11. 50 9,200.00 6. 12" R.C.P. Glass III 1,035 L.P. 10.00 10,350.00 7. 10" R.C.P. Class III 1,408 L.F. 9.50 13,376.00 8, 60" Diameter Precast Concrete Yznhol-.. 940 1 Ea. 750.00 750.CD 9. 60"' Diameter Precast Concrete catch Basin, Tyne "A" (0.3.:741) 1 Ea. 750.00 750.00 10. L8" Diameter Manhole 8 Fa. 500.:;0 4'Ra'�.00 11. 48" Diameter Catch 3asin, T7pe "A" 19 Ea. 6SO.00 22,350.10 12. 24" Diameter Catch :lysin , T17e "C" 7 Ea. 400.00 ",301.00 13. 24" Diameter Inlets 5 Ea. 150.00 1,750.00 14. 34" C.H.F. :'anisole 142 12 Cage, complete 1 En. 4,000.00 46,030.00 15. RetnlorcA Concrete r'ntle[ nhnle 94.3, complete I Ea. 4,500.00 4,500.00 16. Connection Detail ._t yxl.Lting 71" R.C.P. 6 'ropoxed 87" x 63" C.'i.P.A. sr. T?evon. See etaii "A" S;;eet `. 1 Fs. 2,0 ,0.00 2,^,„10.00 17. _.lp Rap l0 S.Y. ?15.06 10 17. :'retch ttacki 1.11 1,''00 L.F. :0 _-r -5 dub-Dotal Storm Severe --------- 5 _5_ APPLIEM ENGINEERING COMPANY CONSULTING CIVIL ENGINEERS ENSIRE.TB'S ESTI?4AT^ 0'r COST CIRCLE. MY SUMVI3101 ELK GROTT VILLAW C00R C•OII' _ - . '.LLI;70TS E. ROMMAf ISMSTRU:.IM _:_ST_.DWALR _ �~ tiiITT ITEM DESCRIPTION OUANTIT': U„iT Pr 1C,' T^-AL ANOM,'i 1. 7" Pnazo hnic Zane Course (including fine grsdiag of cub-grade) 10,675 S.Y. 4.13 2,W. 50 2. 2" cituminous Concrete Under Course, Class I 10,675 S.Y. 3.10 32,00 ,00 3. 1" 30L.Mia0113 ConcrzCe Surface Course, Class I 10,675 S.Y. 1.60 17 ,030.00 4. P.Qc. Curb 6 Sutter 7,550 L.F. 5.00 37,75 .`C 5. 4 root 'dice P.C.C.Sidemaiz, 5" rhick 33,618 S.F. 1.225 42,050.00 5. 3" ?.C.C. Entrance at Devon Avenue, including Mnoval of misting 3-6.24 COG, installation of 24" decreased C&C, TMe Y 6.12 CSC, P.C .C. Ravenent 5 4 '' Scone ?via Course in 3czoroan,Ze •Jltn tine ',00'k Coaury Righway Ccpt. .";tanward3. 1 Ea. 5,000.00 5,000.00 7. 2" 31tuminoc:I Concrete Surf ice Course, Qu3s 200 S.Y. i..;0 600.00 S. n' %rc ei Ecce, ,rade CA-6 201 S.Y. 2.50 530.03 SuD-Tonal Roadway Conscructier.--- 1 03,0; .53 !'. ..i . -l.Ry .IY_.Y?. MMIA TASK ] . Foraing V Rcdl-Ina Concrete $ for Q1.13 1^0 C.`r'. 250.00 l,,nMSC _. Concrete Floor Slab 1,350 S.F. 1.00 L ,!5q '1^ 3" Hollovcore Roof Slab Fmet aide c 32'- N'' long, complete 10 Ga 500.10 51000.00 4. Reinforcing Steei 21,000 lbs. 0.30 0,300.01: -6- APPLIT= D r=MGINrzSR1NG COMPAiVY ,, . Sg�} CONSULTING CIVIL ENGINEERS \ J / Li;CI27;:�R'S E`TI"1A'PE OF COST _ "I1'C:.2 -"•A'1 Sl1 llI''JI5:U2i F.Ll: I.R072 VILTLAG: C^OF. COC'_iTY, ILLINOIS SiLNL'.'PW.1 SE-WAG-: ::OT T;;G T:01C iContinued) . r„!(T t DE- 'T:TPTI- 0UA1TtI7Y UNT!T P4-iCE TOTAL A-XCIM: 5. Fxcavation F, Crrvel Backfill L-J.-P S',fM $ ? .000.•70 5. 7:L=-D Pump, llanhol ; ?ar-orated cv.tn Pipe LL1 n ;Ut: 2, X00.•10 7. Aerator LUQ SIPM 8. Access Frames 6 Lids, Misc. Piping, Steps, Chain IX"T SUM 6,000.",4) ?. ^CLrir_aL 'r.terials Z, Installation LUMP Slat 5,000.07 10. >.sT 'ng LL;tP dub-Thal Sanitary Sewage :'oldins Lank ------------------------ M1,IA:i -----M:,.IA:i Ev AVATIO'i A. (.a rt hvor is - --------------------- --- $ L7,TT'i:?G"f)L'17D ci -cr -------` ------------- Sanitar7 c ?ers On-;ity "--------------_------ 3?,065.00 C. 'Fahr "1;-T O F f-!,j t e ------------`-------------------' ^ev.,r --- ---- ---------------" --- :5 r,.`26• 10 PAv It7G E. iOac:way ConGtruction ----------------"---------------- 153.''^L. F. 3anit.ary uraa;:e Reding 'rank -------------- ----- 57,150.00 Total ------- 20: Engineering h Contingencies ---- 160 9A6. .70 TOTAL ESTIMATED COST ---- --- 972.88C.20 _7- - APPLIED ENGINEERING COMPANY CONSULTING CIVIL ENGINEERS 0, Tuclve ._--Tee! :'.;'pts, '-I$htiag Cable, by Cc:=ou'+ealc`= L11au:i ,.cr„par. ------------------------- a � �."^17.46 B. 2;c itiadreci ."_ ' l.:aet_r P,r.:kay Trees----- --------------- 7 <nn,ry :. 37. "!:: Gray-a n?c. irg nep'src.�ent Review TOT:iL 0? ADDITIONAL iT !`-------- .'. 51_.!•.'"' ,� PZ!'II aT c;i bv: 7m�istered 2Tnf'e4s;onal ;_nain 'eT' -8-