Loading...
HomeMy WebLinkAboutRESOLUTION - 81-78 - 10/10/1978 - WINDY CITY GARDEN SUB/LOC RESOLUTION NO. 81-78 A RESOLUTION ACCEPTING A LETTER OF CREDIT IN LIEU OF A PERFORMANCE BOND FROM THE BANK OF LINCOLNWOOD, GUARANTEEING THE CONSTRUCTION OF PUBLIC IMPROVEMENTS AND SURFACE COURSE REQUIREMENTS FOR WINDY CITY GARDENS SUBDIVISION, LOCATED ON THE WEST SIDE OF ARLINGTON HEIGHTS ROAD NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois: Section 1 . That the President and Board of Trustees do hereby authorize the acceptance of a Letter of Credit in the amount of $97,858.00 from the Bank of Lincolnwood, guaranteeing the construction of public improvements at Windy City Gardens Subdivision, said improvements as shown on Exhibit "A" attached hereto and made a part hereof. Said property located on the west side of Arlington Heights Road and north of Parkchester Road. Section 2. In the event the improvements are not completed by September 11 , 1979, said funds will be released for the purpose of completing the improvements specified in Exhibit "A". Section 3. That this resolution shall be in full force and effect from and after its passage and approval according to law.- PASSED aw.PASSED this loth day of October 1978. APPROVED this loth day of October 1978. Charles J. Zettek Village President ATTEST: Fay Bishop Deputy Village Clerk BANK OF LINCOLNWOOD ACROSS FROM THE HVATT HOUSE MINI BANK 4433 W. TOUHV AVE. Se 4320 W.TOUHV AVE. LINCOLNWOOD, ILL.60646 LINCOLNWOOD, ILL.60646 AREA CODE 312-675-2800 AREA CODE 312-675-2800 FRED M.MEYER Assistant Vice President October 5, 1978 LETTER OF CREDIT Mr. Charles Willis Village Manager Village of Elk Grove Village 901 West Wellington Avenue Elk Grove Village, Illinois 60007 Re: Windy City Gardens Subdivision Elk Grove Village, Illinois Dear Mr. Willis: As construction lenders for the above captioned development, we hereby agree to allocate and set aside the sum of $97,858.00 for payment of estimated costs of improvements specified in Exhibit A attached hereto exclusive of 15% engineering and contingency costs. In the event the improvements are not completed by May 11, 1979, we will, at your demand, release said funds to you for the purpose of completing the improvements specified in Exhibit A attached hereto, upon submission by you of appro- priate contractor's sworn statements and mechanic's lien waivers indicat- ing that the costs of improvements for which such statements and waivers have been submitted equal the amount of funds requested by you to be released. Drafts drawn under and in compliance with the aforementioned terms and provisions of this Letter of Credit will be duly honored if presented to the Bank of Lincolnwood before September 15, 1979. Very truly yours, BANK \OF LI'NCOLNWOOOD By Fred M.Meyer,Ass IV ce President ATT T: D Joseph T Puleo, Vice President/Cashier APPLIED 1885 HICKS ROAD ENGINEERING ROLLING MEADOWS,IL.,80008 COMPANY AREA CODE(312)991-7866 CONSULTING CIVIL ENGINEERS September 11,1978 Charles G. Matthies, Inc. 1404 South New Wilke Road Arlington Heights, Illinois, 60005 RE: WINDY CITY GARDENS SUBDIVISION ELK GROVE VILLAGE, ILLINOIS ENGINEER'S ESTIMATE OF COST ADDENDUM NO.IIl Gentlemen: Submitted for your use is an Addendum to the Estimate of Cost, dated April 27,1978. ENGINEER'S ESTIMATE OF COST UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL 1. Street Light, including pole, luminaire & wiring, complete 2 Ea. $ 2,000 $ 4,000.00 2. Landscaping Trees LUMP SUM 5,000.00 Addendum No.l Total ------------------- $ 9,000.00 Previous Total Estimate of Cost of Construction 88,858.00 GRAND TOTAL COST OF CONSTRUCTION ------ $ 97,858.00 Respectfully submitted, APPLIED ENGINEERING COMPANY Francis R. Lewis FRL:cah MUNICIPAL UTILITIES TOPOOPAPHY LAND PLANNING FEASIBILITY BTUDIEE APPLIED 1686 HICKS ROAD ENGINEERING ROLUNO MEADOWS,IL.,60006 COMPANY AREA CODE(312)a61.7666 CONOULTINO CIVIL ENek URPIS April 27,1978 Charles 0. Matthias, Inc. 1404 South New Wilke Road Arlington Heights, Illinois, 60005 RE: Windy City Gardeas Subdivision Elk Grove, Illinois "Eogineer's Estimate of Cost" Revised April 28,1978 Gentles": Submitted for your use is our Engineer's Estimate of Cost of Improvements for the above noted project, VIM CITY GARDENS SUBDIVISION. The cost and quantities are based upon the final engineering drawings entitled, "WINDY CITY GARDENS SUBDIVISIoH", dated December 3,1977 = prepared by this office, with the last revision dated April 24,1978. ZNQT=ER'S EST11un OF COST Unit Item Description Quantity Unit Price Total A. EARTHWORK 1. Topsoil Excavation (R.O.W.) 1,500 C.Y. $ 1.25 $ 1,875.00 2. Topsoil Placement (R.O.W.) 250 C.Y. 2.25 562.50 3. Clay Excavation (R.O.W.) 1,100 C.Y. 1.00 1,100.00 4. Clay Fill Compacted (R.O.W.) 4,000 C.Y. 0.85 3,400.00 Total Earthwork (LUMP SUM) $ 6,937.50 B. SANITARY SEWER SYSTEM 1. S" DL. P.V.C. (Gravity Pipe) 478 L.P. $ 9.00 $ 4,302.00 2. 8" Dia. P.V.C. (Pressure Pipe) 169 L.P. 12.00 2,028.00 3. 48" Dia. Standard Nanhole, complete 3 Ea. 575.00 1,725.00 4. 6" Dia. P.V.C. "Near Service" 9 Ea. 150.00 1,350.00 w/Wye, complete 5. 6" Dia. P.V.C. "Par Service" 5 Ea. 400.00 2,000.00 w/vye, incl. T.B.F.,complete - 1 - MUNICIPAL UTILITIES TOPOGRAPHY LAND PLANNING FEASIBILITY STUDIES a APPLIEO ENGINEERING COMPANY O CONSULTING CIVIL ENGINEERS Charles G. Mattbies.Im t Windy City Gardens Subdivision Elk Grove, Illinois Engineer's Estimate of Cost Revised - APRIL 28,1978 B. SANITARY SEWER SYSTEM (Continated) Unit Iter, Description QuIntity Unit Price Amount 6. Trench Backfill 165 L.F.$ 6.00 $ 990.00 7. Connection to Existing Manhole 1 Ea. 150.00 150.00 8. Restoration (1225 b 1233 Somerset Lane) LUMP SUM 2,000.00 Total Sanitary Sever System ---- $14,545.00 C. WATER DISTRIBUTION SYSTEM 1. 8" Dia. Y.V.C. (Water Pipe) CL.150 1,062 L.F.$ 11.00 $11,682.00 2. 12"x8" Pressure Connection and 60" 1 Ea. 1,500.00 1,500.00 Vault. complete 3. 1" Dia. Copper "Mar Service", incl. 4 Ea. 150.00 600.00 B-Box, complete 4. l" Dia. Copper "Far Service", incl. 10 Ea. 300.00 3,000.00 B-Box. with trench backfill, complete 5. 8" Gate Valve i 48" Dia. Vault. complete 2 Ea. 750.00 1,500.00 6. Fire Hydrant i Aux. Valve, complete 3 Ea. 750.00 2,250.00 7. Pavement Removal 6 Replacement 20 S.Y. 10.00 200.00 S. Sidewalk Removal 300 Sq.Ft. 1.00 300.00 9. P.C.C. Sidewalk Replacement 300 Sq.Ft. 1.25 375.00 10. Trench Backfill 305 L.F. 6.00 1.830.00 11. Parkway Restoration (Arlington Heights Rd) LUMP SUM 750.00 12. Restoration (1225 i 1233 Somerset Lane) LUMP SUM 2,000.00 Total Water Distribution System $25,987.00 D. STORM SEWER SYSTEM 1. 12" Dia. R.C.P., CL.III 775 L.P.$ 10.00 $ 7,750.00 2. 10" Dia. R.C.P., CL. III 24 L.P. 9.00 216.00 3. 4" Dia. Perforated Plastic Drain Pipe, 230 L.F. 4.50 1,035.00 incl. Trench and CA-5 Aggregate Backfill, complete 4. 48" Dia. Manhole, Type A, complete 2 Ea. 575.00 1,150.00 S. 48" Dia. Catch Basin, Type A, complete 8 Ea. 600.00 4,800.00 6. Trench Backfill 355 L.F. 6.00 2,130.00 7. Restoration (Rear Yards) LUMP SUN 1,000.00 Total Storni Saver System - $18.081.00 - 2 - f r " APPLIED ENOINEEAINO COMPANY O CONSULTING CIVIL ENGINEERS Charles G. Natthies.Inc, Windy City Gardens Subdivision Elk Grove, Illinois Engineer's Estimate of Cost Revised - APRIL 28,1978 E. STREET PAVING Unit Iten Description Quantity Unit Price Amount 1. 7" Possolanic Eau Course 1,600 S.Y.$ 3.75 $ 6,000.00 2. A" Bituminous Concrete Finder 1,600 S.T. 2.00 3,200.00 Courses CL.i 3. IV bituminous Concrete Surface 1,600 E.Y. 2.10 3,360.00 Coarse, CL. I 4. 5" Thick P.C.C. 31dsunik. Incl. 1,150 S.F. 1.25 1,437.50 2" Granular fill 5. Curb i Gutter, Type M-6.12 1,050 L.F. 6.00 60300.00 6. Curb It Cutter, Type 8-6.12 (Entrance) 110 L.P. 6.00 660.00 7. Curb Removal (8-6.24) 100 L.F. 3.50 350.00 8. Depressed Curb i Gutter (8-6.24 E 100 L.F. 7.50 750.00 Entrance) 9. Pavement Removal 25 S..Y. 10.00 250.00 Total Strut Paving -- -- $ 23,307.50 SUMMARY: A. EARTHWORK — - $ 6,937.50 E. SANITARY SEWER SYSTEM — 14,545.00 C. WATER DISTRIBUTION SYSTEM -------- ------- 25,987.00 D. STORK SEWER SYSTEM 18,081.00 E. STREET PAVING 23.307.00 Total Cost of Construction- $ 88,858.00 152 Engineering b Contingencies - - 13.323.70 TOTAL ESTIMATED COST - --- $102.186.70 Respectfully submitted, APPLIED ENGIEEERING Comm Francis R. Levis FRL:cah - 3 -