Loading...
HomeMy WebLinkAboutRESOLUTION - 38-22 - 08/16/2022 - IDOT ENGINEERING FOR IMPROVEMENTS TONNE ROAD UPDATED SEC. PER PWEnds Deparhnent of Transportafion Resolution for Improvement Under the Illinois Highway Code Is this project a bondable capital improvement? Resolution Type Resolution Number Section Number ® Yes ❑ No Original 38-22 20-00073-00-PV BE IT RESOLVED, by the Pr41and Board of Trustees of the Village Governing Body Type Local Public Agency Type of Elk Grove Village Illinois that the following described street(s)/road(s)/structure be improved under Name of Local Public Agency the Illinois Highway Code. Work shall be done by Contract Contract or Day Labor For Roadway/Street Improvements: Name of Street(s)/Road(s) Length Route From To (miles) Tonne Road 1.4 2652 Center Street Landmeier Road For Structures. - Name of Street(s)/Road(s) Existing Route Location Feature Crossed Structure No. BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of Phase I and II engineering for improvements to Tonne Road. The scope of the project includes full pavement reconstruction, curb and sidewalk replacement, ADA ramp upgrades, shared -use path, lighting, full storm sewer and water main replacement, and signal/intersection modifications. 2. That there is hereby appropriated the sum of One Million Four Hundred Forty -Five Thousand Two Hundred Eight and 27/100 Dollars ( $1,445,208.27 ) for the improvement of said section from the Local Public Agency's allotment of Motor Fuel Tax funds. BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit four (4) certified originals of this resolution to the district office of the Department of Transportation. I, Jennifer Mahon Village Clerk in and for said Village Name of Clerk Local Public Agency Type Local Public Agency Type of Elk Grove Village in the State aforesaid, and keeper of the records and files thereof, as provided by Name of Local Public Agency statute, do hereby certify the foregoing to be a true, perfect and complete original of a resolution adopted by Pre,6/ident and Board of Trustees of Elk Grove Village at a meeting held on August 16, 2022 �ItyGoverning Body Type Name of Local Public Agency Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 04 day of September, 2025 Day Month, Year (SEAL, if required by the LPA) Clerk Signature & Date �y pproved Regional Engineer Signature & Date Department of Transportation Printed 09/03/25 Page 1 of 1 BLR 09110 (Rev. 01/18/23) lionois Department of Transportation Request for Expenditure/Authorization of Motor Fuel Tax Funds Local Public Agency T pe County Section Number Village of Elk Grove Village Village Cook 20-00073-00-PV I hereby request authorization to expend Motor Fuel Tax Funds as indicated below: Purpose Motor Fuel Tax Amount Rebuild Illinois Amount County Engineer/Superintendent Salary & Expenses n/a Contract Construction Day Labor Construction Engineering $1,445,208.27 Engineering Investigations IMRF/Social Security n/a Maintenance Maintenance Engineering Obligation Retirement n/a Other Right -of -Way (Itemized on 2nd page) TOTAL $1,445,208.27 Approved Regional Engineer Signature & Date Department of Transportation Department of Transportation Use Entered By Date Completed09/03/25 Page 1 of 2 BLR 09150 (Rev. 07/07/22) Illinois Department of Transportation Is this project a bondable capital improvement? ® Yes ❑ No Resolution for Improvement Under the Illinois Highway Code Resolution Ty a Resolution Number Section Number Original 38-22122-00077-00-RS BE IT RESOLVED, by the President and Board of Trustees of the Village Governing Body Type Local Public Agency Type of Elk Grove Village Illinois that the following described street(s)/road(s)/structure be improved under Name of Local Public Agency the Illinois Highway Code. Work shall be done by Contract Contract or Day Labor For Roadway/Street Improvements: Name of Street(s)/Road(s) Length (miles) Route From To Tonne Road 1.4 2652 Center Street Landmeier Road For Structures: Name of Street(s)/Road(s) Existing Route Location Feature Crossed Structure No. BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of Phase I and II engineering for improvements to Tonne Road. The scope of the project includes full pavement reconstruction, curb and sidewalk replacement, ADA ramp upgrades, shared -use path, lighting, full storm sewer and water main replacement, and signal/intersection modifications. 2. That there is hereby appropriated the sum of One Million Four Hundred Forty-five Thousand Two Hundred Eight and 27/100 Dollars ( $1,445,208.27 ) for the improvement of said section from the Local Public Agency's allotment of Motor Fuel Tax funds. BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit four (4) certified originals of this resolution to the district office of the Department of Transportation. I, Loretta M. Murphy Village Clerk in and for said Village Name of Clerk Local Public Agency Type Local Public Agency Type of Elk Grove Village in the State aforesaid, and keeper of the records and files thereof, as provided by Name of Local Public Agency statute, do hereby certify the foregoing to be a true, perfect and complete original of a resolution adopted by President and Board of Trustees of Elk Grove Village at a meeting held on August 16, 2022 Governing Body Type Name of Local Public Agency Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 16 day of August, 2022 Day Month, Year (SEAL) Printed 08/11/22 M Clerk Si nature & Date /f. aAlo� - X" �, Approved Regional Engineer Signature & Date Department of Transportation 5r- 8/25/2022 _9�1&� BLR 09110 (Rev. 07/07/22)