Loading...
HomeMy WebLinkAboutRESOLUTION - 100-72 - 11/28/1972 - BLD ACTIVITIES/FEE SCHEDULESRESOLUTION NO. 100-72 FEE SCHEDULES NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of. Elk Grove Village, Counties of Cook and DuPage, State of Illinois: Section 1: PLAN REVIEW Preliminary Plan Review services shall be performed for a fee not to be in excess of one half of the established fee normally charged for full and final plan review and approval. Any fees paid for said preliminary review shall not be credited toward the cost for final plan review work. A Plan Review for each set of plans for single family residence - . . . . $10.00 A Plan Review for each set of plans for single family residence for alteration, remodeling or detached structure - . . . . $5.00 The applicant for a building permit for any other type of con- struction shall pay the following fees when making application for the purpose of deferring Village expense in examining and reviewing plans and specifications: NOTE: For the purpose of clarifying the following schedule - BASIC BUILDING CODE BASIC PLUMBING CODE BASIC MECHANICAL CODE 1 - is referred to as BBC - is referred to as BPC - is referred to as BMC Building Volume (Cu. Ft.) SHELL (structure only) Basic Building Code (BBC) COMPLETE BUILDING BOCA Codes* (BBC, BPC, EMC) 0 to 10,000 a 40.00 $ 55.00 10,001 to 25,000 60.00 70.00 25,001 to 50,000 70.00 90.00 50,001 to 100,000 80.00 115.00 100,001 to 175,000 95.00 125.00 175,001 to 250,000 100.00 140.00 250,001 to 350,000 110.00 160.00 For each 10,000 1.10 $ 1.25 cu. ft. in excess of 350,000 *Plan Review fees are at a reduced rate when the Basic Building, Basic Plumbing and Basic Mechanical Codes are utilized. **Fee for use groups B (Storage) and D (Industrial) is $0.85 for each 10,000 cu. ft. in excess of 350,000. ***Fee for use groups B (Storage)and D (Industrial) is $1.00 for each 10,000 cu. ft. in excess of 350,000. The MINIMUM fee for reviewing plans for minor interior alterations and re- modeling for other than single family residences shall not be less than ... $10,00. Any additional and exceptional expenses incurred by the Village for Plan Review NOT covered by the above fees shall be paid by the applicant. Section 2: BUILDING PERMIT FEES Industrial and Commercial Single family residence - $4.00 for ea. $1,000 of construction value - $4.00 ,f It It if Single family alteration or remodeling or detached struc- ture. - $4.00 " Moving of building - $200.00 per ea. day or fraction thereof. Sign Fees: A. Permit fees - Every applicant before being granted an original permit hereunder shall pay to the Village the following permit fee for each sign structure: 2 1. Non -illuminated signs --$10.00 plus $.10 per square foot of sign surface area of the proposed sign 2. Illuminated signs --$15.00 plus $.10 per square foot of sign surface area of the proposed sign. B. Annual inspection fees - The Building Department shall inspect annually, or more frequently as they deem necessary, each sign regulated by this Article and for which a permit is required, for the purpose of ascertaining whether the same is secure or insecure and whether it is in need of removal or repair. To meet the expense of such inspection the permittee thereof shall pay to the Village the sum of one-half of the then required permit fee for illuminated signs and $3.50 plus $.05 per square foot for each square foot in excess of 40 square feet for non -illuminated signs. No inspection fee as required by this paragraph shall be charged during the fiscal year in which the sign or other advertising device is erected. Electrical Fees: A. Permit and Inspection fees: For the inspection of original installations of a single family residence in - .including all circuits, fixtures, receptacles and equip- ment, the fee shall be 0 to 499 sq. ft. - $15.00 5,00 to 799 sq. ft. - 20.00 800 to 1599 sq. ft. - 25.00 1600 to 2399 sq. ft. - 30.00 2400 to 2999 sq. ft. - 35.00 3000 and over sq. ft. - 40.00 B. In other than single family dwellings the inspection fee of each nominal 15 ampere and 20 ampere two wire circuit, including fixtures, sockets or receptacles, the fee shall be: 3 Circuits 15 or 2.0 Amperes 1 $ 5.15 2 10.10 3 14.2.5 4 18.35 5 22.40 6 25.80 7 29.15 8 32.45 9 25.75 10 39.05 11 41.40 12 43.70 13 46.05 14 48.35 15 50.70 16 53.00 17 55.35 18 57.65 19 60.00 20 62.30 21 64.55 22 66.80 23 69.65 24 71.30 25 73.55 26 to 50 incl. 2.15 each add'l. circuit 51 to 75 incl.. 2.00 each add'1. circuit 76 to 100 incl. 1.85 each add'l. circuit Hore than 100 1.80 each add'l. circuit C. For the inspection of a 30 ampere fixed lighting circuit, the inspection fee is double the amount of a 15 or 20 ampere circuit fee. D. Motors and other forms of Power consuming devices. For the inspection of each electric motor or Power consuming device other than lighting fixtures, the inspection fee shall be as follows: One motor or Power consuming device $5.00 For each additional motor or Power consuming device 1.50 each This fee is to be applied to all motors over !4 horsepower. Motors of 14 horsepower or_ less are to be charged on equivalent incandescent lamp basin. 4 E. Fixtures, Sockets and Receptacles on existing circuits (Lamps of 50 wats) (Not including circuit wiring). Inc. Lamps Fee Inc. Lamps Fee 1 to 15 $ .95 101 to 110 $5.75 16 to 20 1.20 111 to 120 6.45 21 to 25 1.80 121 to 130 6.50 26 to 30 2.25 131 to 140 6.90 31 to 40 2.70 141 to 150 7.20 41 to 50 3.15 151 to 160 7.55 51 to 60 3.60 161 to 170 7.95 61 to 70 4.05 171 to 180 8.30 71 to 80 4.50 181 to 190 8.70 81 to 90 4.95 191 to 200 9.00 91 to 100 5.40 Above 200 Lamps: 30 cents for each group of 25 lamps or fraction thereof. F. Service entrances --$7.50 G. Minimum Inspection Fee. do inspection shall be made for a less amount than $5.00. All fees herein provided shall be paid to the Village before a permit is issues. H. Whenever extra inspections are required due to inaccurate or in- correct information, a cr.arge of five ($5.00) dollars per hour shall be made by the Electrical Inspection Department for the time consumed in making extra inspections. I. ALL PERMIT FEES EXCEPT PERIODIC PERMIT FEES will be paid in advance to the Village. 5 7. Plumbing fees - The fees for plumbing permit shall be three dollars ($3.00) for each plumbing fixture including plumbing system, bathtub, lavatories, closets, sinks, laundry tubs, drinking fountains, shower receptacles, urinals, soda fountains, and traps shall be considered fixtures. 8. Mechanical fees - $5.00 for each heating plant or unit. $5.00 for each cooling unit (air conditioning)• 9. Certificate of Occupancy - $5.00. 10. Driveway apron - $10.00 each. 11. Construction water - Minimum $5.00 or $1..00 per each 1,000 sq.ft. of building. 12. Renew building permit - $1.00 for six month renewal. 13. Storage tanks - $2.00 for tanks up to 1,000 gallons plus $.50 for each 1,000 gallons thereafter. 14. For the installation of fuel oil tanks having a capacity of more than two thousand (2,000) gallons and less than 20,000 gallons - $75.00. For the installation of tanks for storage of gasoline having a capacity of less than 10,000 gallons - $75.00. For the installation of fuel oil tanks having a capacity of 20,000 gallons or more - $75.00. For the installation of gasoline storage tanks having a capacity of 1,000 or over - $75.00. Section 3: That the Village President and Village Clerk are hereby authorized to sign said fee schedule for and in the name of the Village and attach thereto the corporate seal. Section 4: That this resolution shall be in full force and effect from and after its passage and approval according to law. PASSED this _ day of _ APPROVED this _ day of President Attest: Village Clerk: 6 1972. . 1972.