Loading...
HomeMy WebLinkAboutRESOLUTION - 35-65 - 6/8/1965 - MFT FUNDS/PRATT BLVD & NICHOLAS BLVD-4h35 -4.s RESOLUTION FOR IMPROVEMENT BY MUNICIPALITY UDDER THE ILLINOIS HIGHIL-WAY CODE PRESIDENT AND BOARD OF TRUSTEES BE IT RESOLVED, by the —___of the Counrll or President and Board of Truateea VILLAGE of ELK GROVE VILLAGE —__ Illinois City, Town, or Village that the following described street(s) be improved under the Illinois Highway Code: Name of Thoroughfare Arterlaf street or Route From To PRATT BLVD. BUSS E�QAD __ E1,141MRSm RnAD--- NICHOLAS BLVD,__21 PRATT BLVD. ORTE �7?LFEET___ BE IT FURTHER RESOLVED, 1. That the proposed improvement consist of PAVING TFL INVERT OF THE DRAINAGE_ DITCH IN THE MEDIAN STRIP construction_ 4 wide and shall be designated as Section—__ 0- 2. That there is hereby appropriated the sum of SEVi3\TTEEN TH,0 JSAND, AND_ NQn_0.2 _ Dollars (S --J7 —1500-00 __) for the improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That said work shall be done by__ __ _ CONTRACT;and, (Specify Contract or Day Labor) BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the Department of Public Works and Buildings, Division of Highways, through its District Engineer. APPROVED 19—_. Dept. of Peblic Work, and Boildinga Divi,lon of Highxreye Chief Highway Engineer Mr' 1ELEANOR G. TURNER _ VILLAGE_e)Clerk rs= -- M Mfrs. (CI[Y. Town, or Village) VILLAGE ELK GROVE VILLAGE in and for the_ ,of—_, (city. Town, or Village) County of _S:SIOK hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the PRESIDENT AND BOARD OF TRUSTEES at a meeting on (Couocil or President and Board of Tmetee,) __— IN `TESTIMONY WHEREOF, d have hereunto set my hand and seal this A.D. 19_x_:: (SEAL) — .c..2._:= _C, VTr,IAGE�erk (CILY. Town, or Villaite)lae<) Form BLR 414 (Rev. 1262) ESTIMATE -OF -COST PAVED INVERT PRATT BLVD. & NICHOLAS BLVD. 5,165 lin. ft. Paved ditch @ 3.00 = $15,495.00 54 sq. yds. Pavement removal and Bituminous replacement, Type IV 6.00 = 324.00 114 lin. ft. Adjusting Corregated Metal Pipe Culvert, over 8" dia. @ 3.00 = 342.00 21 " t' Adjusting Service Drains 8" dia. or less @ 2.00 = 42.00 30 " ° Adjusting Service Drains 8" dia. 0 3.00 = 90.00 TOTAL $16,293.00 5% ENGINEERING 814.65 GRAND TOTAL . . . $17.,107.65 AVERATE COST $3.16/ LIN. FT. NORTH EXTENSION ON NICHOLAS BLVD. (Not eligible for M.F.T. Funds) 1,775 lin. ft. Paved ditch @ 3.16 = $ 5,609.00 5% ENGINEERING 280.45 GRAND TOTAL $ 5,889.45 E. N. FLETCHER, Engineer ENF:lb DATED: JIINE 8, 1965