Loading...
HomeMy WebLinkAboutRESOLUTION - 10-10 - 2/9/2010 - AMENDING FEESRESOLUTION NO. 10-10 A RESOLUTION AMENDING FEES FOR PLAN REVIEW, INSPECTION, AND CONSTRUCTION PERMITS NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, Illinois, as follows: Section 1: The provisions of Resolutions No. 15-92 and 34-92 are hereby rescinded in their entirety. Section 2: BUILDING PLAN REVIEW FEE The applicant for a building permit for single-family residence construction, remodeling, alteration, repair or for a detached structure shall pay the following fees for the purpose of examining and reviewing plans and specifications: Plan Review for each set of plans for single-family residence - $100.00 Plan Review for each set of plans for single-family residence for alteration, remodeling, addition, deck or detached accessory structure (not including shed) - $45.00 The applicant for a building permit for any other type of construction shall pay fees for the purpose of examining and reviewing plans and specifications based upon the volume of the overall structure. The volume of all structures shall be measured between the lowest floor of the structure (including basement) and the underside of the roof deck. The following fees shall apply: Volume Base Plan Review Fee* (cubic feet) Up to 20,000 $125.00 20,001 — 40,000 $145.00 40,001 — 60,000 $170.00 60,001 — 80,000 $200.00 80,001 — 100,000 $230.00 1 100,001 — 150,000 150,001 — 200,000 Over 200.000 $265.00 $300.00 $300.00 plus $3.00 Per each 10,000 Cubic foot over 200,000 cubic feet *Plan Review fees for Assembly, High Hazard and Institutional Uses and shall be 1.5 times the Base Plan Review Fee. *When Mechanical and/or Plumbing Code Review is required, the Plan Review Fee shall be 1.5 times the Base Plan Review Fee. The MINIMUM fee for reviewing plans and specifications for interior alterations and remodeling for OTHER than single-family residences shall be - $75.00. Any additional and/or exceptional expenses incurred by the Village for Plan Review NOT covered by the above fees shall be paid for by the applicant. Section 3: BUILDING PERMIT AND INSPECTION FEES Minimum Permit Fee: The minimum permit fee for any building, electrical, plumbing, mechanical or other construction permit shall be $25.00. Building Construction or Demolition: For ALL classifications - $10.00 for each $1,000.00 of construction value. The construction value for permit fee purposes shall not be less than the value determined using the most current Building Valuation Data published by the International Code Council. Sign Fees: 1. Illuminated and non -illuminated signs - $10.00 for each $1,000.00 of construction value plus $1.00 per square foot of sign surface area per face. 2. Temporary signs - $25.00 for a period not to exceed thirty (30) calendar days. 3. Annual inspection fee -$20.00 Swimming Pools: $10.00 for each $1,000.00 of construction value. Electrical Fees: 1. Permit and Inspection Fees: 2 a. For original installations in a single-family residence including all circuits, fixtures, receptacles and equipment, the fee shall be: 0 to 499 square feet - $50.00 500 to 799 square feet - $60.00 800 to 1,599 square feet - $70.00 1,600 to 2,399 square feet - $80.00 2,400 to 2,999 square feet - $90.00 3,000 and over square feet - $100.00 b. In other than original single-family dwellings, the permit and inspection fee for each nominal 15 ampere and 20 ampere two wire circuit, including fixtures, sockets, receptacles and equipment shall be: Circuits 15 or 20 Amperes 1 $ 6.00 2 12.00 3 18.00 4 24.00 5 30.00 6 35.00 7 40.00 8 45.00 9 50.00 10 55.00 11 59.00 12 63.00 13 67.00 14 71.00 15 75.00 16 79.00 17 83.00 18 87.00 19 90.00 20 93.00 21 to 50: $3.00 for each additional circuit 51 to 75: $2.75 for each additional circuit 76 to 100: $2.50 for each additional circuit More than 100: $2.25 for each additional circuit c. For the inspection of a 30 ampere fixed lighting circuit, the fee shall be double the amount of the 15 or 20 ampere circuit fee. d. Motors and other forms of power consuming devices. For each electrical motor or power consuming device other than lighting circuits the fee shall be as follows: 3 i. One motor or power consuming device - $10.00 ii. For each additional motor or power consuming device - $5.00 e. Fixtures, sockets and receptacles on existing circuits (lamps): Lamps Fee 1to15 16 to 20 21 to 25 26 to 30 31 to 40 41 to 50 51 to 60 61 to 70 71 to 80 81 to 90 91 to 100 Above 200 lamps: thereof. f Service Entrances: Plumbing Fees 0 to 100 Amperes - Lamps Fee $ 10.00 101 to 110 $43.00 13.00 111 to 120 46.00 16.00 121 to 130 49.00 19.00 131 to 140 52.00 22.00 141 to 150 55.00 25.00 151 to 160 58.00 28.00 161 to 170 61.00 31.00 171 to 180 64.00 34.00 181 to 190 67.00 37.00 191 to 200 70.00 40.00 $7.50 for each group of 25 lamps or fraction 0 to 100 Amperes - $40.00 101 to 200 Amperes - $60.00 201 to 400 Amperes - $80.00 401 to 600 Amperes - $100.00 601 to 1,000 Amperes - $120.00 Over 1,000 Amperes- $120.00 plus $0.10 per ampere over 1,000 amperes The fees for plumbing permits shall be $8.50 for each plumbing fixture. Bathtubs, lavatories, water closets, sinks, laundry tubs, drinking fountains, shower bases, urinals, and any other fixture requiring a trap shall be considered fixtures. Mechanical Fees $25.00 for each heating unit (furnace). $25.00 for each cooling unit (air conditioner). $25.00 for each water heater. Fireplace $10.00 for each $1,000.00 of construction value. 4 Certificate of Occupancy Single-family residential additions, remodeling and garages - $25.00. Single-family residential new original construction - $50.00. All other classifications; additions, remodeling and detached structures - $50.00. All other classifications; new original construction - $100.00. r ---on Single-family residential - $25.00. All others - $10.00 for each $1,000.00 of construction value. Sheds All classifications - $25.00 Lawn Irrigation Systems All classifications - $10.00 for each $1,000.00 of construction value. Building Permit Renewal/Extension Fifty percent (50%) of the original building permit fee to extend the permit for a period of six (6) months. Storage Tanks Above or below grade tank installation or removal (flammable and non- flammable): A. $150.00 for tanks up to 1,000 gallons. B. $25.00 for each 1,000 gallons thereafter. Fire Protection Systems A. Fire Suppression Systems a. $100.00 for the first 100 heads. B. Standpipes 5 a. $50.00 for the first standpipe. b. $10.00 for each additional standpipe. C. Fire Pumps - $100.00 for any size pump. D. Fire Alarm Systems (automatic or manual) - $100.00 for any size system. E. Partial Fire Protection Equipment Installation - $50.00 for each system. Elevator Inspections The fees for the inspection of mechanical and electrical safety devices for passenger and freight elevators, man lifts, moving stairs and dumbwaiters shall be $60.00 per inspection. Inspections shall be performed two (2) times each calendar year. Reinspection Fee Wherever in this Municipal Code inspections are required, and the work is not ready for inspection, or due to incorrect or inaccurate information given by the owner or agent of the premises a reinspection or additional inspection is required, an additional fee of $50.00 per inspection shall be charged. Section 4: ENGINEERING PLAN REVIEW AND MATERIAL TESTING FEES No improvement as set forth in Section 8-9-1 of the Municipal Code shall be constructed without an engineering plan relating thereto, which plan shall be prepared by or under the direction of the Director of Engineering and Community Development. In any case where plans and specifications shall be prepared by an engineer other than the Director of Engineering, then and in that event, the Director of Engineering and Community Development, or his duly designated representative, shall review all plans and specifications and shall inspect the improvements proposed to be made during the course of construction. The applicant shall pay to the Village as and for the Village's cost for such plan reviews and construction inspections, the sum of three percent (3%) of the estimated cost of construction (based upon current, local estimates of average construction costs) of all public and private improvements other than the building structures. All improvements constructed on public property intended to be dedicated for public use shall be tested by the Director of Engineering and Community Development. To defray the costs of material testing services, each permitee constructing improvements shall pay a testing fee to the Village, which fee shall 6 be equal to one-half of one percent (1/2 of 1%) of the estimated cost of construction of all public improvements. Construction costs shall be determined as identified above. Section 5: ENGINEERING PERMIT AND INSPECTION FEES Minimum Permit Fee: The minimum permit and inspection fee for any engineering, concrete, exterior plumbing, grading or other construction work shall be $25.00. Sidewalks Single-family residential - $25.00. - All others — three percent (3%) of the estimated cost of construction. Driveways Single-family residential - $40.00. All others - three percent (3%) of the estimated cost of construction. Driveway Aprons Single-family residential - $40.00. All others - three percent (3%) of the estimated cost of construction. Driveway/Apron Overlays Single-family residential - $25.00 each. All others - three percent (3%) of the estimated cost of construction. Curb and Gutter Single-family residential - $30.00. All others - three percent (3%) of the estimated cost of construction. Patios Single-family residential - $30.00. All others - three percent (3%) of the estimated cost of construction. Clean -outs (including associated pipe replacement) 7 Single-family residential - $40.00. All others - three percent (3%) of the estimated cost of construction. Sewer or Water Repair or Installation Single-family residential - $40.00. All others - three percent (3%) of the estimated cost of construction. Sump Pump Connection Single-family residential - $25.00. All others - three percent (3%) of the estimated cost of construction. Gradin All classifications - three percent (3%) of the estimated cost of construction. Reinspection Fee Wherever in this Municipal Code inspections are required, and the work is not ready for inspection, or due to incorrect or inaccurate information given by the owner or agent of the premises a reinspection or additional inspection is required, an additional fee of $50.00 per inspection shall be charged. Section 6: That this resolution shall be in full force and effect from and after its passage and approval according to law. VOTE: AYES: 5 NAYS: 1 ABSENT: 0 PASSED this 91h day of February 2010. APPROVED this 9th day of February 2010. ATTEST: Judith M. Keeizan, Village Clerk Res/Construction Fees APPROVED: Mayor Cram B. Johnson Village of Elk Grove Village 0