HomeMy WebLinkAboutRESOLUTION - 8-11 - 2/22/2011 - MFT- ILLINOIS DEPT. OF TRANSPORTATION RESOLUTION NO. 5-11
Illinois Department Resolution for Maintenance of
e�
Streets and Highways by Municipality
of Transportation Under the Illinois Highway Code
BE IT RESOLVED, by the Mayor and Board of Trustees - _ of the
(Council or President and Board of Trustees)
Village_ of Elk Grove Village Illinois, that there is hereby
(City,Town or Village) (Name)
appropriated the sum of $ 894,88 7.00 of Motor Fuel Tax funds for the purpose ofmaintaiBing
streets and highways under the applicable provisions of the Illinois Highway Code from March 1 , 2011,
(Date)
to December 31 , 2011
(Date)
BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the
approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection
with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above,.
submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing
expenditures from and balances remaining in the account(s)for this period; and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation, at Schaumburg Illinois.
I, Judith. M. Keegan Clerk in and for the Village'
(City;Town or Village)
of Elk Grove Village County of Cook and DuPage
hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by
the Mayor and Board of Trustees ata meeting on February 22, 2011
(Council or President and Board of Trustees) )) //// Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this p(p?/Iale. day of February, 2011
(SEAL) - �, J Village Clerk
(City,Town or Village)
Approved
Date
Department of Transportation
Regional Engineer
Printed 2/11/2011 BLR 14230(Rev.11/06)
Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number 11 - 00000-01 - GM
Period from 03/01/2011 to 12/31/2011 Municipality Village of Elk Grove Village
Estimated Cost of Maintenance Operations
Maintenance For Grou III or III Material E ui ment or Labor
Operation Group Unit Operation
(No.-Description) (I,Il,lli.ly) Item Unit Quaa!itL Price Cost Cost
2011 Hot-Mix Asphalt III Removal and Disposal of Cu Yd 355 $44.00 $ 15.620.00
Resurfacing Contract Unsuitable Material
100% MFT III Sub-Base Granular S Yd 3,180 $5.00 $ 15,900.00
Material,Type B 4"
III Bituminous Materials Gallon 8,430 $0.50 $ 4,215.00
Prime Coat
III Hot-Mix Asphalt Surface Ton 8,470 $66.00 $ 559,020.00
Course, Mix"C", N50
III Hot-Mix Asphalt Surface Scl Yd 84,130 $1.40 $ 117,782.00
Removal, 1-1/2"
III Class D Patches, 6" Scl Yd 4,210 $35.00 $ 147,350.00
Total Day Labor Costs I
Total Estimated Maintenance Operation Cost $ 859,887.00
Preliminary Engineering $ 0.00
Engineering Inspection $0.00
Material Testing $ 0.00
Total Estimated Engineering Cost N/A
Total Estimated Maintenance Cost $ 859,887.00
Submitted: February 23, 2011 Approved:
Date Date
By: Vito P. Sammarco, P.E. Director of Public Works
Municipal Official Title Regional Engineer
Submit Four(4) Copies to Regional Engineer
Page 1 of 1 8LR 14231 (Rev.2/23/06)
Printed on 2(11(2011 3'.48'.44 PM
y�J Illinois Department Municipal Estimate of
of Transportation Maintenance Costs
Section Number 11 -00000 -00 -GM
Period from 03/01/2011 to 12/31/2011 Municipality Village of Elk Grove Village
Estimated Cost of Maintenance Operations
Maintenance For Grou 1 II or III Material E ui mentor Labor
Operation Group Unit Operation
(No.—Description) (l,ltul.ly) Item Unit Quantity Price Cost Cost
2011 Hot-Mix Asphalt II-B Bituminous Materials Gallon t40 8.25 1,980.00
Material Purchase Prime Coat)
Contract
11-B Hot-Mix Asphalt Binder Ton $49.00 $ 32,340.00
$35,000 70% MFT Course, IL-19.0
$14,980 30% Village
III-B Hot-Mix As halt Surface Ton 270 $58.00 $ 15,660.00
Course,Mix"C" IL9.5mm
Total Day Labor Costs
Total Estimated Maintenance Operation Cost $49,980.00
Preliminary Engineering $ 0.00
Engineering Inspection $ 0.00
Material Testing $ 0.00
Total Estimated Engineering Cost N/A
Total Estimated Maintenance Cost $49,980.00 -
Submitted: February 23, 2011 Approved:
Date Dale
By: Vito P. Sammarco, P.E. Director of Public Works
Municipal Oficial Title Regional Engineer
Submit Four(4)Copies to Regional Engineer
Pagel of 1 BLR 14231 (Rev.2123106)
Printed on 2/11/2011 3:49:16 PM
ai vv -oaaaav � aov in
0
rz
C O O O O O O O O O O O O
O � 7 Ips �n u> �n .- to sfmmma � v
ILO O O d M N D �' M M N l0 c N M 0 ry
d C9 c
rL O Y O K
Q 0 0 0 0 0 0 0 0 0 o m
W N N N VI V1 N V) i(1 IA N N N
(V N Z Z Z Z Z Z Z Z Z Z Z Z
= O O O U U U U U U U U U U U U
N C U U U U U U U U U U V U
C m U
<OQ Q N < N < N Q
Q N N N U) N
d C w Q 2 m Q 2 2 m 7i 7�m
Q
C jcu
� m p E p_ aE E E E E E E E E E E E
a a a a a a a a a a a
G. U c ¢ ¢ c c c of w w ¢
t 'C t
C� U
C U)
LAI
� nnnnnnnno� mmm
NNNNNNNNMMMM �
C_
C
0 0 0 0 0 0 W
.0 C mN OI n N aD O) OO n
O -O
O O O � N O O T O T
n N QO -t (p
LoCO
m �
C a
<< < < < < < < < < < < N
y
< H 2 S = 2 = _ = 2 2 2 = _
W N
U1
Q
O
U
J
F LL
E
lo
J
Cn
C
0 N O
U L
O
J
0
L v,
O� N
am
m
m O J > > V N
w v c m -mo (� I"
Q E E v
o m r
O M 'N O N N L p 0 E m e
0002 �i QHU co aa`