Loading...
HomeMy WebLinkAboutRESOLUTION - 53-12 - 12/11/2012 - IDOT MAINTENANCE OF STREETS Resolution No. 53-12 Illinois Department Resolution for Maintenance of Streets and Highways by Municipality of Transportation Under the Illinois Highway Code BE IT RESOLVED, by the Mayor and Board of Trustees of the (Council or President and Board of Trustees) Village of Elk Grove Village Illinois, that there is hereby (City,Town or Village) (Name) appropriated the sum of $ 1 ,111,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from January 1 , 2013 (Date) to December 31 2013 (Dale) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing expenditures from and balances remaining in the account(s)for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Schaumburg Illinois. I, Judith M. Keegan Clerk in and for the Village (City,Town or Village) of Elk Grove Village County of Cook and DuPage hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Mayor and Board of Trustees ata meeting on December 11 , 2012 (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 11th day of December, 2012 (SEAL) Judith M. Keegan Village Clerk (City,Town or Village) Approved Date Department of Transportation Regional Engineer Printed 11/30/2012 BLR 14230(Rev. 11/06) �J Illinois Department Municipal Estimate of Transportation Maintenance Costs Section Number 13 - 00000 - 00 - GM Period from 01 / 01 / 2013 to 12 / 31•/ 2013 Municipality Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance For GroUD I II or III Material E ui ment or Labor Operation Group Unit Operation (No.—Description) (I,Il,lll,IV) Item Unit Quantity Price Cost Cost 2013 Hot-Mix Asphalt II-B Bituminous Materials Gallon 250 $6.00 $ 1500.00 Material Purchase Prime in 5- al Containers Contract II-B Hot-Mix Asphalt Binder Ton 670 $47.00 $31,490.00 1009/ MFT Course, IL-19.0 III-B Hot-Mix Asphalt Surface Ton 315 $54.00 1 $17,010.00 Course,Mix"C" IL9.5mm ) " trYa Total Day Labor Costs Total Estimated Maintenance Operation Cost $50,000.00 Preliminary Engineering $0.00 Engineering Inspection $ 0.00 Material Testing $0.00 Total Estimated Engineering Cost N/A Total Estimated Maintenance Cost $50,000.00 Submitted: December 21, 2012 Approved: Date Date By: Vito P. Sammarco, P.E, Director of Public Works Municipal Official Title Regional Engineer Submit Four(4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev.2123106) Printed on 11/30/2012 9:18:16 AM l2v O O U O O > nN -� U1Y! NN4100 0 0 0 O �OrnM � 214 m > � N w F N o— 2 N N O (O M �- N N c'1 1- N N N O CJ �+i c- N N W N N N M O C V N e0 c� N L O a C c O o Y g m O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m N o m z z . z z z z z z z z z z z z z z' z z z C o O 0 0 0 0 0 0 0 0 N C .0 U U U U U U U U U U U U U U U U. U U U U C m o m Q Q Q Q Q Q Q 6 Q Q Q Q Q Q Q Q Q Q Q Q 4 43 L �p E n w m v aEi v w v v- m w v aEi aEi m w v m y aEi w w M = 'a w � m m w of ff 0: x w fr x of ¢ � w � � tt •v _ z c t t t t t t t t t t t t t t t t t t t tt C J > > > > > > > > > > > > > > > > > > > > > 'C O rn m m m m m m m fn m m m t/J m m m fn y 3 v N Z L O N (D O O N O O N O mt O O m N O O O tD f0 Op - > N C_ m L iG U C W S N V i 4 V O r O N tD m n O V OD N 1 1 C4 C a0 m J N ch C O m C N Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q a. fn O W N N Q O w Z U J Q ❑ J ❑ > a a 7 a ❑ O Q F Oa u) j LL 00� F, ZO }� J � � zm Z ❑ > K ¢ ❑ Z ❑ O ❑ O ❑ O ❑ ❑ LL\1 Cl) F- w > m w m www w w w w w z o GJ _ 0 Z z z Z J J J J J QJ w W a' J J J J a' w w w w } 4 E a ❑ ¢ < � of w � t r F r F- C F C o ¢ w ¢ z z z z z E W OQHZ > > JZ (nvlmLL m OOO � 7Q� J »Qw in in Z J Q G W W m W OW mO U)iO mmmmmm = (9 _ � U m m W > w W W W W W z z z o z z � � w (],1V^p!7. U' SOW w W Qxxxxx0000o0 OW Q W a o > o ❑ o o o o o o > > > m >> x a Q C . cc O� Z N C C~.� o wF zFt U x ❑ J b > o ❑ >< wwoF' Qz01-- N I-- Q J X } W 0 V Z O ~ J Z m N m m NF- W x S W J Q�Q ❑ w J W Z Q W J m J ❑ C7 W Z Z J m u1 2 Q a lwi w m U W ~ W K `0 0 CD W WU � (p W ❑ C7 m f/JOa ❑ m X: O Q_ K KKF- am : K0Q0Z UOZ � vA' = ooga ¢ Qo � awo = o0r000 W U 0 0 0 0 m m ❑ > > 3: � � q�J Illinois Department Municipal Estimate of of Transportation Maintenance Costs Section Number 13 - 00000 - 02 - GM Period from 01 / 01 / 2013 to 12 / 31 / 2013 Municipality Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance For Grou 1 II or III Material Equip ment or Labor Operation Group Unit Operation (No.-Description) (i.u.lu.lV) Item Unit QuaEjicL Price Cost Cost 2013 Villagewide Concrete III Driveway Pavement Rem Sq Yd 1 780.0 8.75 15 575.00 Replacement Contract III Comb Curb Gutter Rem Foot 10,650.0 $ 3.00 $ 31,950.00 $234,662 69% MFT $25,000 (7t.L Village III Sidewalk Removal Sq Ft 11,095.0 $ 1.00 $ 11,095.00 $80,625 (240I)Private III Sub-Base Gran. Mtl.Ty C 4" Sill Yd 1,120.0 $ 3.00 $ 3,360.00 III Sub-Base Gran. Mtl.Ty C 8" So Yd 280.0 $ 6.75 $ 1,890.00 III PCC Driveway Pavt 5" Sq Yd 1,470.0 $33.00 $ 48,510.00 111 PCC Driveway Pavt 8" Sq Yd 310.0 $41.00 $ 12,710.00 III PCC Sidewalk 5" Sq Ft 91845.0 $ 4.00 $ 39,380.00 III PCC Sidewalk 8" S Ft 1,255.0 $ 5.00 $ 6,275.00 III Detectable Warnin s Sq Ft 1,044.0 $18.00 $ 18,792.00 III Comb CC&G Tv B-6.12 Foot 90.0 $14.00 $ 1,260.00 III Comb CC&G Ty B-6.24 Foot 30.0 $26.00 $ 780.00 III Comb CC&G Ty M-5.12 Foot 10,410.0 $13.50 $140,535.00 III Comb CC&G Ty M-5.18 Sq Ft 120.0 $16.00 $ 1,920.00 III Reinf Bars Util.Trenches Foot 170.0 $ 1.50 $ 255.00 III Traf. Contr. &Protec. (Spec) L Sum 1.0 $6,0006,000.00 I Total Da Labor Costs Total Estimated Maintenance O eration Cost $ 340,287.00 Preliminary Engineering $ 0.00 Engineering Inspection $ 0.00 $ 0.00 N/A $ 340,287.00 Submitted: _ December 21, 2012 Approved: Date Date By: Vito P. Sammarco, P.E. Director of Public Works Municipal Official Title Regional Engineer Submit Four(4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev.2/23/06) Printed on 11/23/2011 919:55 AM