Loading...
HomeMy WebLinkAboutRESOLUTION - 43-15 - 10/13/2015 - 1-90 BRIDGE ENHANCEMENT - RES. 43-15RESOLUTION NO. 43-15 A RESOLUTION AUTHORIZING THE MAYOR AND VILLAGE CLERK TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY AND THE VILLAGE OF ELK GROVE VILLAGE NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois as follows: Section 1: That the Mayor be and is hereby authorized to sign the attached documents marked: AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY AND ELK GROVE VILLAGE a copy of which is attached hereto and made a part hereof as if fully set forth and the Village Clerk is authorized to attest said documents upon the signature of the Mayor. Section 2: That this Resolution shall be in full force and effect from and after its passage and approval according to law. VOTE: AYES: 6 NAYS: 0 ABSENT: 0 PASSED this 13'h day of October 2015. APPROVED this 13'h day of October 2015. APPROVED: Mayor Cram B. Johnson Village of Elk Grove Village ATTEST: Judith M. Keegan, Village Clerk Adrecmem l l;["AIBI idscs INTERGOVERNMENTAL AGREEMENT BETWEEN THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY AND ELK GROVE VILLAGE This INTERGOVERNMENTAL AGREEMENT (hereinafter referred to as the "AGREEMENT") is entered into this 13`h day of October AD, 2015, by and between THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY, an instrumentality and administrative agency of the State of Illinois, hereinafter called the "ILLINOIS TOLLWAY", and ELK GROVE VILLAGE, a municipal corporation of the State of Illinois, hereinafter called the "VILLAGE", individually referred to as "PARTY", and collectively referred to as "PARTIES". WITNESSETH: WHEREAS, the ILLINOIS TOLLWAY in order to facilitate the free flow of traffic and ensure safety to the motoring public, intends to improve the Jane Addams Memorial ILLINOIS TOLLWAY (I-90) from the John F. Kennedy Expressway to Interstate Route 39 (hereinafter sometimes referred to as "Toll Highway"), and included in multiple ILLINOIS TOLLWAY construction contract(s) including but not limited to Contract(s) I-14-4208 and I-14-4209 (hereinafter referred to as the 'PROJECT") by making the following improvements: 1-14-4208 The Salt Creek Bridge, Golf Road Bridge and Arlington Heights Road Bridge will be reconstructed along with the paving of the I-90 mainline outside lane. There will be drainage improvements, signing improvements, highway lighting installation and utility relocation and protection. There will also be the design and construction of new retaining walls, and all other work necessary in accordance with the approved plans and specifications; and I-14-4209 The Busse Road Bridge and the Oakton Street Bridge will be reconstructed along with the paving of the I-90 mainline outside lane and associated ramps. There will be drainage improvements, signing improvements, highway lighting installation and utility relocation and protection. There will also be the design and construction of new retaining walls and the design and construction of new noise abatement walls along the north side; and all other work necessary in accordance with the approved plans and specifications; and WHEREAS, the ILLINOIS TOLLWAY, as part of the PROJECT, is applying its corridor wide aesthetic standard treatment on the aforementioned bridges; and WHEREAS, the VILLAGE requests that the ILLINOIS TOLLWAY include in its PROJECT aesthetic improvements beyond that of the ILLINOIS TOLLWAY standards for three (3) bridges within their jurisdictional limits. The bridges and their requested enhancements are as follows: I-90 Bridge over Arlington Heights Road Six approximately 3.5' x 2' (actual depth varies due to skew of bridge) pilasters located at each end of each abutment and pier. The pilasters will extend to 9" below the top of parapet. The existing northwest curtain wall and exterior beams will be color stained. The three proposed curtain walls will have form liner. Form liner will be placed on the outside face of exterior parapets on the bridge and approach slab. A "Welcome to Elk Grove Village" cast -in-place will be placed on the outside of the north exterior parapet. I-90 Bridge over Oakton Street Four approximately 3.5' x 2' pilasters located at each end of the two piers. The pilasters will extend to 9" below the top of parapet on the west side of the bridge and shall maintain the same height on the east side in front of the noise wall. Form liner will be placed on the outside face of exterior parapets on the bridge and approaches as well as on the noise wall at the north bridge parapet wall and approaches. The abutment walls will be color stained. The steel girder will be colored grey. A "Welcome to Elk Grove Village" cast -in-place letters with one piece liner will be placed on the outside of the east noise wall. I-90 Bridge over Busse Road Abutment seat and pier crash wall will be extended to add six pilasters (approximately 4' x 2' although depth shall vary) at each of each abutment and pier. The pilasters will extend to 9" below the top of parapet. The fascia beams, pilasters and a portion of the retaining walls that wrap around the bridge will be color stained. The pilasters and the outside face of exterior parapets on the bridge and approach slab will have form liner treatment. A "Welcome to Elk Grove Village" cast -in-place will be placed on the outside of the north exterior parapet; and WHEREAS, the ILLINOIS TOLLWAY agrees to the VILLAGE's request to enhance the bridge aesthetics, hereinafter referred to as the "ENHANCEMENTS'; and WHEREAS, the ILLINOIS TOLLWAY and the VILLAGE by this instrument, desire to determine and establish their respective responsibilities toward engineering, right of way acquisition, utility relocation, construction, funding and maintenance of the PROJECT as proposed; and 01 WHEREAS, the ILLINOIS TOLLWAY by virtue of its powers as set forth in the "Toll Highway Act," 605 ILCS 10/9 et seg. is authorized to enter into this AGREEMENT; and WHEREAS, the VILLAGE by virtue of its powers as set forth in the Illinois Municipal Code 65 ILCS 5/1-1-1 et seq. is authorized to enter into this AGREEMENT; and WHEREAS, a cooperative Intergovernmental Agreement is appropriate and such an Agreement is authorized by Article VII, Section 10 of the Illinois Constitution and the "Intergovernmental Cooperation Act", 5 ILCS 220/1 et seq. NOW, THEREFORE, in consideration of the aforementioned recitals and the mutual covenants contained herein, the PARTIES hereto agree as follows: I. ENGINEERING A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE as hereinafter stipulated. B, The final approved plans and specifications for the PROJECT shall be promptly delivered to the VILLAGE by the ILLINOIS TOLLWAY. C. The VILLAGE shall review the plans and specifications which impact the VILLAGE's ENHANCEMENTS within fifteen (15) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from the VILLAGE within this time period, the lack of response shall be deemed approval of the plans and specifications. Approval by the VILLAGE shall mean the VILLAGE agrees with all specifications in the plans, including alignment and location of the ENHANCEMENTS. In the event of disapproval, the VILLAGE will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. Any dispute concerning the plans and specifications shall be resolved in accordance with Section VIII of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Kane -Du Page Soil and Water Conservation District, Du Page County, including but not limited to Department of Environmental Concerns and Division of Highways, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the 3 PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The VILLAGE shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way to the ILLINOIS TOLLWAY, without charge to the ILLINOIS TOLLWAY. Any permit for right of access, temporary use shall not be unreasonably withheld by the VILLAGE. II. RIGHT OF WAY A. The acquisition or transfer of permanent right of way interests is not required from the VILLAGE for the construction of the PROJECT pursuant to the approved plans and specifications, nor is the transfer of any interest in the VILLAGE's or the ILLINOIS TOLLWAY's property or rights of way which the VILLAGE or the ILLINOIS TOLLWAY deem necessary for the maintenance and operation of their respective highway systems. Therefore, it is understood by the PARTIES hereto that there will be no exchange of any interest in the VILLAGE's right of way or of the ILLINOIS TOLLWAY's right of way. B. In the event the ILLINOIS TOLLWAY identifies areas of the VILLAGE's right of way temporarily needed for the ILLINOIS TOLLWAY to enter, access and use to allow the ILLINOIS TOLLWAY and/or its contractor(s) to construct the PROJECT, the VILLAGE, shall upon the ILLINOIS TOLLWAY's application on the VILLAGE's permit form, issue the ILLINOIS TOLLWAY a permit without charge allowing the ILLINOIS TOLLWAY all temporary use necessary in furtherance of this AGREEMENT. In addition, the VILLAGE shall waive any bonding requirements. The ILLINOIS TOLLWAY agrees that upon completion of the PROJECT, those lands impacted by the ILLINOIS TOLLWAY or this PROJECT be restored to an "as good as — or — better" than pre -construction condition. III. UTILITY RELOCATION A. The ILLINOIS TOLLWAY agrees to make arrangements for and issue all permits for the PROJECT required adjustments to utility facilities located on existing ILLINOIS TOLLWAY rights of way, and on proposed ILLINOIS TOLLWAY rights of way which are outside areas of VILLAGE jurisdiction, where improvements to ILLINOIS TOLLWAY facilities are proposed to be done as part of the PROJECT, at no expense to the VILLAGE. M B. At all locations where utilities are located on ILLINOIS TOLLWAY rights of way and must be adjusted due to work proposed by the VILLAGE, the ILLINOIS TOLLWAY agrees to make arrangements with the applicable utility and issue all permits for the requisite adjustment(s). At all locations where the VILLAGE's utilities are located on ILLINOIS TOLLWAY rights of way and must be adjusted due to work proposed by the VILLAGE or due to work proposed by the ILLINOIS TOLLWAY, the VILLAGE agrees to obtain from the ILLINOIS TOLLWAY an approved permit for the facility, and to abide by all conditions set forth therein. The VILLAGE agrees to reimburse the ILLINOIS TOLLWAY for any and all out of pocket costs the ILLINOIS TOLLWAY may incur in causing the aforementioned utility or utilities to be adjusted. IV. CONSTRUCTION A. The ILLINOIS TOLLWAY shall advertise and receive bids, obtain VILLAGE concurrence as to the amount of bids (for work to be funded wholly or partially by the VILLAGE before award), award the contract(s), provide construction engineering inspections and cause the PROJECT to be constructed in accordance with the PROJECT plans and specifications, subject to reimbursement by the VILLAGE as hereinafter stipulated. B. After award of the construction contract(s), any proposed deviations from the plans and specifications that affect the VILLAGE shall be submitted .to the VILLAGE for approval prior to commencing such work. The VILLAGE shall review the proposed deviations and indicate its approval or disapproval thereof in writing. If the proposed deviation to the plans and specifications are not acceptable, the VILLAGE shall detail in writing its specific objections. If the ILLINOIS TOLLWAY receives no written response from the VILLAGE within fifteen (15) calendar days after delivery to the VILLAGE of the proposed deviation, the proposed deviation shall be deemed approved by the VILLAGE. C. After award of the construction contract(s), assuming there are no proposed deviations from the plans and specifications that affect the VILLAGE, the ILLINOIS TOLLWAY shall provide no less than five (5) calendar days' written notice to the VILLAGE prior to commencement of work on the PROJECT. D. The VILLAGE and its authorized agents shall have all reasonable rights of inspection (including pre -final and final inspection) during the progress of work included in the PROJECT that affects the ENHANCEMENTS. The VILLAGE shall assign personnel to perform inspections on behalf of the VILLAGE of all work included in the PROJECT that affects the VILLAGE, and will deliver written notices to the Chief Engineer of the ILLINOIS TOLLWAY advising the ILLINOIS TOLLWAY as to the identity of the individual(s) assigned to perform said inspections. 5 E. Notices required to be delivered by either PARTY pursuant to this AGREEMENT shall be delivered as indicated in Section VIII of this AGREEMENT. F. The ILLINOIS TOLLWAY shall give notice to the VILLAGE upon completion of 70% and 100% of all PROJECT construction contracts to be subsequently maintained by the VILLAGE, and the VILLAGE shall make an inspection thereof not later than fifteen (15) calendar days after notice thereof. If the VILLAGE does not perform a final inspection within fifteen (15) calendar days after receiving notice of completion of 100% of all PROJECT construction contracts or other inspection arrangements are not agreed to by the PARTIES hereto, the PROJECT shall be deemed accepted by the VILLAGE. At the request of the VILLAGE, the ILLINOIS TOLLWAY's representative shall join in on such inspection. In the event said inspections disclose work that does not conform to the approved final plans and specifications, the VILLAGE's representative shall give immediate verbal notice to the ILLINOIS TOLLWAY's representative of any deficiency, and shall thereafter deliver within fifteen (15) calendar days a written list identifying such deficiencies to the Chief Engineer of the ILLINOIS TOLLWAY. Deficiencies thus identified shall be subject to joint re -inspection upon completion of the corrective work. The VILLAGE shall perform such joint re -inspections within fifteen (15) calendar days after receiving notice from the ILLINOIS TOLLWAY that the deficiencies have been remedied. G. The ILLINOIS TOLLWAY shall have the right, in its sole judgment and discretion, to cancel or alter any or all portions of the work due to circumstances either known or unknown at the time of bidding or arising after the Contract(s) was entered into, in accordance with the Canceled Items Provision 109.06 included in the most current version of the ILLINOIS TOLLWAY Supplemental Specifications to the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction. V. FINANCIAL A. Except as otherwise identified herein, the ILLINOIS TOLLWAY agrees to pay all PROJECT related engineering, right of way, construction engineering and construction costs subject to reimbursement by the VILLAGE as hereinafter stipulated. B. It is mutually agreed by the PARTIES hereto that preliminary and design engineering costs shall be computed as 5% of the actual construction costs and that construction engineering shall be computed as 10% of actual construction costs. C. It is mutually agreed by the PARTIES hereto that the estimated cost to the VILLAGE for the ENHANCEMENTS to the Arlington Heights Road Bridge is $82,595.90, to the Busse Road Bridge $110,832.50 and for the Oakton Street Bridge $163,445.30, for an estimated combined cost of $356,873.70 for 0 construction costs, $17,843.68 (5% of construction costs) for preliminary and design engineering and $35,687.37 (10% of construction costs) for construction engineering for a total estimated cost of $410,404.75, as shown on "EXHIBIT A", "EXHIBIT B" and "EXHIBIT C". These estimated costs are based upon contract quantities and contract unit prices. D. It is further agreed that notwithstanding the estimated cost, the VILLAGE shall be responsible for the actual costs associated with the requested ENHANCEMENTS described in the Recital section of this AGREEMENT. E. The VILLAGE agrees that upon award of the contract for this improvement and receipt of an invoice from the ILLINOIS TOLLWAY, the VILLAGE will pay to the ILLINOIS TOLLWAY, an amount equal to 50% of its obligation incurred under this AGREEMENT, based upon actual bid prices, and will pay to said ILLINOIS TOLLWAY the remainder of its obligation in a lump sum, upon completion of the PROJECT, based on final costs. F. The VILLAGE may request, after the construction contract(s) are let by the ILLINOIS TOLLWAY, that supplemental work that increases the total costs of the PROJECT or more costly substitute work be added to the construction contract(s). The ILLINOIS TOLLWAY will cause said supplemental work or such substitute work to be added to the construction contract(s), provided that said work will not delay construction of the PROJECT. The VILLAGE causing said supplemental work or more costly substitute work shall pay for the cost increases of said work in full. VI. MAINTENANCE - RESPONSIBILITIES A. The ILLINOIS TOLLWAY agrees to maintain I-90 in its entirety. B. The ILLINOIS TOLLWAY shall enter into subsequent agreements, not germane to this AGREEMENT, with other Governmental Entities for the shared maintenance of the bridges. C. The PARTIES agree that each PARTY has the duty to perform such regular inspections, surveys and reviews as are reasonably necessary to fulfill their respective obligations under this AGREEMENT. D. The VILLAGE agrees to be financially responsible for the ENHANCEMENTS on the grade separation structures or on the ILLINOIS TOLLWAY's right of way, appurtenances such as architectural enhancements, "gateway logos", or other devices which are not directly required in connection with the ILLINOIS TOLLWAY roadway operations or required for the performance of maintenance obligations of the ILLINOIS TOLLWAY under this AGREEMENT, the VILLAGE shall have sole responsibility for all maintenance, repair, replacement, removal and/or renewal of such items, including such maintenance, repair, 7 replacement, removal and/or renewal of such items which is necessitated by maintenance projects performed by the ILLINOIS TOLLWAY pursuant to this AGREEMENT. The VILLAGE shall apply for a permit from the ILLINOIS TOLLWAY any time the VILLAGE requires access to the grade separation structures at issue in this AGREEMENT. E. If in the future, the ILLINOIS TOLLWAY adopts a roadway or other improvement which requires modification, relocation or reconstruction to said VILLAGE ENHANCEMENTS, then the VILLAGE hereby agrees to be financially responsible for the entire cost to modify, relocate or reconstruct said ENHANCEMENTS in conjunction with the ILLINOIS TOLLWAY's proposed improvement. In no event shall the ILLINOIS TOLLWAY have any financial responsibility for any costs or damages including; which shall include, but are not limited to those associated with the installation, removal or relocation of the ENHANCEMENT. F. In the event the VILLAGE fails to maintain the ENHANCEMENTS located on the Arlington Heights Road, the Busse Road and the Oakton Street bridges in their entirety and the ILLINOIS TOLLWAY is required to maintain such ENHANCEMENTS to protect the integrity of the ILLINOIS TOLLWAY's structure from imminent danger, the VILLAGE agrees to reimburse the ILLINOIS TOLLWAY for the cost of the emergency maintenance plus 10% for overhead within thirty (30) calendar days of receipt of an invoice from the ILLINOIS TOLLWAY. VII. ADDITIONAL MAINTENANCE PROVISIONS A. During construction, the VILLAGE shall continue to maintain all portions of the PROJECT within the VILLAGE's right of way that are not to be improved or maintained by the construction contractor(s) pursuant to the approved plans and specifications, and the ILLINOIS TOLLWAY shall continue to maintain all portions of the Toll Highway that are not required to be maintained by the construction contractor(s). B. All items of construction which are stipulated in this AGREEMENT to be maintained by the VILLAGE shall, upon completion of construction and final inspection, be the sole maintenance responsibility of the VILLAGE, and all items of construction which are stipulated in this AGREEMENT to be maintained by the ILLINOIS TOLLWAY shall, upon completion of construction, be the sole maintenance responsibility of the ILLINOIS TOLLWAY. VIII. GENERAL PROVISIONS A. It is understood and agreed that this is an AGREEMENT between Elk Grove Village and the Illinois State Toll Highway Authority. 0 B. It is understood and agreed that this AGREEMENT constitutes the complete and exclusive statement of the agreement of the PARTIES relative to the subject matter hereof and supersedes all previous oral and written proposals, negotiations, representations or understandings concerning such subject matter. C. Wherever in this AGREEMENT approval or review by either the VILLAGE or the ILLINOIS TOLLWAY is provided for, said approval or review shall not be unreasonably delayed or withheld. D. Not later than fourteen (14) calendar days after execution of this AGREEMENT each PARTY shall designate in writing a representative who shall serve as the full time representative of the said PARTY during the carrying out of the execution of this AGREEMENT. Each representative shall have authority, on behalf of such PARTY, to make decisions relating to the work covered by this AGREEMENT. Representatives may be changed, from time to time, by subsequent written notice. Each representative shall be readily available to the other PARTY. E. In the event of a dispute between VILLAGE and the ILLINOIS TOLLWAY in the carrying out of the terms of this AGREEMENT, the Chief Engineer of the ILLINOIS TOLLWAY and the VILLAGE's Engineer shall meet and resolve the issue. In the event that they cannot mutually agree on the resolution of a dispute concerning the plans and specifications for the PROJECT or in the carrying out of the terms of this AGREEMENT in reference to the PROJECT, the decision of the Chief Engineer of the ILLINOIS TOLLWAY shall be final. F. This AGREEMENT may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which shall be deemed one and the same instrument. G. Under penalties of perjury, the VILLAGE certifies that its correct Federal Tax Identification number is 36-6009201 and it is doing business as a governmental entity, whose mailing address is Elk Grove Village, 901 Wellington Avenue, Elk Grove Village, Illinois 60007. H. This AGREEMENT may only be modified by written modification executed by duly authorized representatives of the PARTIES hereto. This AGREEMENT and the covenants contained herein shall become null and void in the event the contract covering the construction work contemplated herein is not awarded within three (3) years subsequent to the date of execution of this AGREEMENT. J. This AGREEMENT shall be binding upon and inure to the benefit of the PARTIES hereto and their respective successors and approved assigns. 9 K. The failure by the ILLINOIS TOLLWAY or the VILLAGE to seek redress for violation of or to insist upon the strict performance of any condition or covenant of this AGREEMENT shall not constitute a waiver of any such breach or subsequent breach of such covenants, terms, conditions, rights and remedies. No provision of this AGREEMENT shall be deemed waived by the ILLINOIS TOLLWAY or the VILLAGE unless such provision is waived in writing. L. It is agreed that the laws of the State of Illinois shall apply to this AGREEMENT and that, in the event of litigation, venue shall lie in Du Page County, Illinois. M. All written reports, notices and other communications related to this AGREEMENT shall be in writing and shall be personally delivered, mailed via certified mail, overnight mail delivery, or electronic mail delivery to the following persons at the following addresses: To the ILLINOIS TOLLWAY: The Illinois Toll Highway Authority 2700 Ogden Avenue Downers Grove, Illinois 60515 Attn: Chief Engineer To the VILLAGE: Elk Grove Village 901 Wellington Avenue Elk Grove Village, Illinois 60007 Attn: Village Manager N. The introductory recitals included at the beginning of this AGREEMENT are agreed to and incorporated into this AGREEMENT. (This space intentionally left blank) 10 WITNESS THEREOF, the PARTIES have executed this AGREEMENT on the dates indicated. Craig B. Johnson, Mayor Date: 52 ELK GROVE VILLAGE Attest: (Please Print Name) THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY Greg M. Bedalov, Executive Director Michael Colsch, Chief of Finance Date: Date: By: Date: David A. Goldberg, General Counsel Approved as to Form and Constitutionality Robert T. Lane, Assistant Attorney General, State of Illinois JMR_IGA_Elk Grove Village 1-90 @ Arlington Hts. Rd, Busse Rd, & QOakton St.—Revised 070915 I1 DDAMS MEMORIAL TOLLWAY (1-90) N HEIGHTS ROAD BRIDGE -AESTHETICS resign Contract Number: 4016 ruction Project Number: 1-14-4208 CONSTRTUCTION COST IN UNIT QUANTITY UNIT PRICE AMOUNT SQ YD 36 $ 64.74 $ 2,330.64 CU YD 51.9 $ 547.84 $ 28,432.90 ARES CU YD 7.8 $ 448.37 $ 3,497.29 RFACE SQ YD 2,330 $ 0.01 $ 23.30 FOXY COATED POUND 5,380 $ 1.20 $ 6,456.00 SQ YD 32 $ 162.32 $ 5,194.24 12X53 FOOT 186 $ 39.84 $ 7,410.24 FOOT 186 $ .1.00 $ 186.00 EACH 2 $ 4,980.35 $ 9,960.70 EACH 6 $ 99.61 $ 597.66 2 TREATMENT SQ FT 7,780 $ 1.98 $ 15,404.40 7N SYSTEM SO FT 89 $ 34.86 $ 3,102.54 $ 82,595.90 EXHIBITA 1-90 BRIDGE OVER BUSSE ROAD BRIDGE PAY ITEM QUANTITY UNIT UNIT COST TOTAL COST CONCRETE STRUCTURES 69.6 CU YD $ 712.19 $ 49,568.42 REINFORCEMENT BARS, EPDXY COATED 8,570 LB $ 1.29 $ 11,055.30 CONCRETE SEALER 1,000 SQ FT $ 1.00 $ 1,000.00 TEMPORARY SOIL RETENTION SYSTEM 320 SQ FT $ 0.01 $ 3,20 FORM LINER TEXTURED SURFACE 2,604 SQ FT $ 9.59 $ 24,972.36 CONCRETE SURFACE COLOR TREATMENT 12,239 SQ FT $ 1.98 $ 24,233.22 $ 110,832.50 Exhibit B TAMS MEMORIAL TOLLWAY (1-90) V STREET BRIDGE -AESTHETICS ign Contract Number: 4016 Sion Project Number: 1-14-4209 CONSTRTUCTION COST N UNIT QUANTITY UNIT PRICE AMOUNT CU YD 67.2 $ 712.19 $ 47,859.17 2FACE SQ YD 5497.0 $ 9.59 $ 52,716.23 PDXY COATED POUND 5180 $ 1.29 $ 6,682.20 .2X53 FOOT 666 $ 39.84 $ 26,533.44 FOOT 666 $ 1.00 $ 666.00 '2F! 1,492 $ 1.00 $ 1,492.00 ;TREATMENT SQ FT 13887 $ 1.98 $ 27,496.26 $ 163,445.30 Exhibit C