Loading...
HomeMy WebLinkAboutCOMMITTEE OF THE WHOLE - 07/07/1987 - LINE OF SIGHT/EXEMPT RANK/ARL HTS RD RIGHT TURN LANE MINUTES COMMITTEE OF THE WHOLE July 7, 1987 7 p.m. MEMBERS PRESENT: Charles Zettek, Village President Michael Tosto, Village Trustee Edward Hauser, Village Trustee James Petri , Village Trustee Ronald Chernick, Village Trustee Joseph Bosslet, Village Trustee MEMBERS ABSENT: Dennis Gallitano, Village Trustee STAFF PRESENT: Charles Willis, Village Manager Gary Parrin, Assistant Village Manager Robin Weaver, Administrative Assistant Alan Boffice, Village Engineer Fred Engelbrecht, Chief of Police John Bantner, Commander, Police Thomas Rettenbacher, Building Commissioner Earle Kracht, Plan Reviewer/Building Inspector Supervisor LINE OF SIGHT Members reviewed a report and videotape prepared by the Building Department. Various locations throughout the Village were analyzed to highlight a range of severity of line of sight problems. Consensus was to utilize the letters presented by the Building Commissioner. These letters are directed to: 1 ) new residents; and 2) residents whose landscaping may become a problem. The consensus of the members was to use discretion in determining line of sight problems rather than the absolute definition of line of sight. EXEMPT RANK Chief Engelbrecht presented his request to have the Police Lieutenant rank made exempt. Discussion ensued on: the method of selection if not done by the Fire and Police Commission; the impact on the Department; an area survey of other communities; and employee termination procedures. Consensus was to remain with the status quo. President Zettek directed the Village Manager, Police Chief and Fire Chief to discuss possible avenues to give the Chief greater selection ability (e.g. more points for their assignment, choice among top three candidates) . ARLINGTON HEIGHTS ROAD - RIGHT TURN LANE The Village Engineer provided members with a status report on the Village' s request to Cook County to permit the construction of a right turn lane southbound on Arlington Heights Road at Biesterfield Road. The County has requested an additional ten (10) feet of R-O-W in order to avoid plowing snow on public property and the sidewalk. As the Village already has a ten (10) foot easement in that location it could be altered to become a "snow easement". To obtain County approval , the sidewalk would essentially become a carriage walk for a length of 200 feet north from the intersection. Consensus concurred. MUNICIPAL BUILDING - CONCRETE WORK The Village Manager requested permission to have additional concrete work done at the Municipal Building to replace the existing entrance walkway and stairs. Cost was estimated at $7,000-$8,500. Members agreed. BIESTERFIELD ROAD Members agreed that the Village should work aggressively to get information out to the residents on the reasons for (and the correct details of) the Biesterfield Road/I-290 interchange and the Biesterfield Road extension. Consensus was to leave the signs up in the Westgate/Stockbridge area which were installed to discourage cut-through traffic. ADJOURNMENT 11 :19 p.m. mw c: President and Board of Trustees Village Clerk Village Manager Assistant Village Manager Administrative Assistant Administrative Intern Department Heads