Loading...
HomeMy WebLinkAboutCOMMITTEE OF THE WHOLE - 08/25/1987 - FLOOD DAMAGE ELK GROVE VILLAGE COMMITTEE OF THE WHOLE MINUTES August 25, 1987 6 P.M. MEMBERS PRESENT: Charles Zettek, Village President Michael Tosto, Village Trustee Edward Hauser, Village Trustee James Petri, Village Trustee Ronald Chernick, Village Trustee Joseph Bosslet, Village Trustee Dennis Gallitano, Village Trustee MEMBERS ABSENT: None STAFF PRESENT: Charles Willis, Village Manager Gary Parrin, Assistant Village Manager Robin Weaver, Administrative Assistant Alan Boffice, Village Engineer George Coney, Director of Finance George Knickerbocker, Village Attorney OTHERS PRESENT: John Thebault, McLennan & Thebault, Assoc. J. Andrew Jones, McLennan & Thebault Assoc. Julius Kwasek, Architect, Harris & Kwasek FLOOD DAMAGE The Village Manager stated that he would be seeking at the Village Board meeting the authorization to re-landscape the municipal building site and to renovate the lower level. It was explained by the Village Manager that although the pump equipment was designed to handle as much as six inches of rainfall per hour and the berm around the perimeter of the site was designed at 50% over the historical high water level, that the 93j+ inches of rain which fell in a short amount of time on August 13 and 14 caused the streets and surrounding area to flood so heavily as to also flood the municipal complex. Approximately 2,200,000 gallons of water were contained in the municipal complex. Mr. Willis recommended that to mitigate any future occurrence that a berm be constructed on the site at an elevation of two feet above the new high water mark. The berm would have a concrete retaining wall inside to further protect against flooding. Construction of the berm would leave five weak spots - the four courtroom entrances and the dock area. None of these areas flooded during the August 14 disaster and each could be quickly and easily sandbagged. The cost of the berm was estimated at $80,000. -z- Consensus of the members was to proceed with the berm but to delay renovation efforts until completion of the berm. The meeting was adjourned for the 8 p.m. Village Board meeting. mw c: President and Board of Trustees Village Manager Assistant Village Manager Administrative Assistant Village Attorney All Department Heads