Loading...
HomeMy WebLinkAboutCOMMITTEE OF THE WHOLE - 06/19/1990 - COMMITTEE OF THE WHOLE Meeting 1K 6-19-90 7 p.m. PRESENT: Charles zettek, Village President Michael Tosto, Village Trustee Nancy Czarnik, Village Trustee James Petri, Village Trustee Ronald Chernick, Village Trustee Joseph Bosslet, Village Trustee ABSENT: Dennis Gallitano, Village Trustee STAFF PRESENT: Charles Willis, Village Manager Raymond Rummel, Administrative Assistant James MacArthur, Fire Chief Alan Boffice, Director, Engineering/Community Dev. Thomas Cech, Director of Public Works George Coney, Director of Finance Hilda Ingebrigsten, Asst. Director of Finance HIGGINS ROAD BICYCLE OVERPASS The Village Manager reported that the Forest Preserve District has yet to respond to the State's request for them to share in the cost of constructing the overpass. RECYCLING GRANT The Village Manager reported that the Health Department is amending its multi-family grant application with the Illinois State Department of Natural Resources, and still hopes to receive $50,000 in grant money. AMOCO TALAR FARM ANNERATIOB The consensus of the Committee was for Village staff to meet with the Amoco representatives to obtain more information on the proposed annexation, and to find out why AMOCO is considering annexation to Elk Grove rather than to Des Plaines. Staff will then report back to the Village Board. MARRIOTT HOTEL The Village President reported that the Marriott Hotel will open August 1, 1990 and will have a grand opening on September 13, 1990. BIBSTERFIBLD ROAD 1AFROVBBEBTS The consensus of the Committee was to allocate $200,000 in the FY 90-91 Budget for undertaking road improvements, and for hiring a consultant to prepare a Phase I project report to make the Biesterfield Road improvement project eligible for F.A.U.S. funding. The interim improvements would include the removal and asphalting of the 4-foot median and the striping of three 10-foot lanes and two 11-foot lanes. FIRE DEPARTMENT USB OP OLD LIBRARY The consensus of the Committee was for the Fire Chief to examine and make recommendations on using the old Library on a permanent basis rather than temporarily moving into the Court Room. In addition, it was the consensus of the Committee to allocate $100,000 to renovate the Library and $150,000 for flood-proofing the Library building. IBCCVW TAS SURCHARGE FUBD.S The Village Manager reported that approximately $1,600,000 in income tax surcharge funds will be available. It was the consensus of the Committee to meet at 7 p.m. on June 26 to prioritize the spending of the Income Tax Surcharge Funds. REVXW OP PROPOSED CAPITAL PROJECTS It was the consensus of the Committee to make the following changes to the proposed FY 1991-96 Capital Projects: 1. Biesterfield/I-290 Interchange: Add $3,000 for a sidewalk, for a total budgeted expenditure of $1,526,000. 2. Biesterfield Road Traffic Corridor Improvement: Add $100,000 in FY 1991 for improvements and $100,000 in FY 1991 for Phase 1 engineering. 3. Enclose Elk Grove Boulevard ditch: Remove $2,000,000. Item to be discussed with Income Tax Surcharge projects. 4. HQ Station Building Addition: Remove. Add in its place $600,000 in FY 1992 to expand Biesterfield Fire Station. 5. Relocate Landmeier Fire Station: Increase funds to $1,800,000 and move to FY 1996. 6. Library Renovation: Add $100,000 to FY 1991 to renovate the Library building for Fire Department administrative occupancy. 7. Flood-proof old Library building: Add $150,000 to FY 1991 to berm the Library building. mw