Committee of the Whole Minutes
10-2-91
10:20 p.m.
PRESENT: C. Zettek, Village President
M. Tosto, Village Trustee
N. Czarnik, Village Trustee
J. Petri, Village Trustee
R. Chernick, Village Trustee
J. Bosslet, Village Trustee
D. Gallitano, Village Trustee
ABSENT: NONE
STAFF PRESENT:
C. Willis, Village Manager
G. Parrin, Assistant Village Manager
R. Rummel, Administrative Assistant
REPORTERS PRESENT: None
CIRCLE BAY/BERKENSHIRE DRAINAGE REPORT
The consensus of the Committee was as follows:
1 . The work should be undertaken as recommended by
the consultant;
2 . If landscape or other obstructions are located in
an easement work area, the homeowners will be
notified in advance, giving them sufficient time
to remove any obstructions. Restoration will be
limited to fence and sod replacement .
3 . Homeowners will be advised that any storms
greater than the August 1990 flood would require
the restoration of side yard swales. The Village
will not perform that work, but would offer the
services of Engineering for advice and
consultation.
4 . Staff is to prepare a report estimating the total
cost of the project including engineering design,
as well as detailing a time frame for completing
the project . The Director of Engineering and
Community Development is to meet with the Village
Board at 7 p.m. on October 8 to answer any
additional questions.
5. The Village Board and staff will meet with the
homeowners on Tuesday, October 15, at 7:30 p.m.
to discuss the report .
CHILDREN'S ADVOCACY CENTER
The consensus of the Committee was to donate
$2,500 to the organization.
The meeting was adjourned at 11 p.m.