Loading...
HomeMy WebLinkAboutEXECUTIVE SESSION - 07/11/1991 - LAND ACQUISITION/RELEASED RES NO 29-95 REVISED EXsC;ITi E SZsSla", Elk Grove Village Date 7-11-91 Time 7 p.m. TOPIC: Litigation Personnel Land Acquisition X Village Board Village Board MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT C. Zettek, Village President None C. Willis , Village Manager M. Tosto, Village Trustee N. Czarnik, Village Trustee R. Rummel, J. Petri , Village Trustee Administrative Assistant R. Chernick, Village Trustee J. Bosslet, Village Trustee A. Boffice, Director, D. Gallitano, Village Trustee Engineering and Community Development Vito Sammarco, Consulting Engineer Charles Stenzel, Consulting Engineer Pursuant to a duly made and approved motion and a majority vote at a regularly scheduled meeting of the Village President and Board of Trustees on Ju1V 11, 1991 this Executive Session was called to consider a land dCqulsitl0ri matter. Number of pages attached: 2 �V\/ Date(S) of review for release: January 1992 Date of approval for release: , V REVISED LAND ACQUISITION Triton Engineering Consultants reviewed the recommendations for improving Biesterfield Road from Martha to Elk Grove Boulevard. If all of the improvements are performed, rights-of-way would have to be acquired at the following locations : 1 . The Northwest intersection of Biesterfield and Arlington Heights Road (McDonalds) ; 2 . The West side of Arlington Heights Road, north of Biesterfield (Elk Crossing Shopping Center) ; 3 . The Southwest intersection of Biesterfield and Arlington Heights Road (Gasoline Station) ; 4 . The Southeast intersection of Arlington Heights Road, South of Biesterfield- (rear yard of four residences) . 5. The Northeast intersection of Arlington Heights Road, North of Biesterfield (rear yard of three residences) . 6 . A section of property on the South side of Biesterfield across from Alexian Brothers Medical Center. (Trustee Gallitano left the meeting at 8 : 10 p.m. ) The consensus of the Committee was as follows : 1 . Include a full 500-foot right-hand turn lane from Southbound Arlington Heights Road to westbound Biesterfield in the design; 2 . Include a traffic signal and new entrance into Elk Crossing and the Village Hall in the design; . . . please continue 3 . Do not include right-hand turn lane from Eastbound Biesterfield to Southbound Arlington Heights Road; however, leave this item under study. 4 . Consider reducing, in the Phase III Design Study, the median area East of Creighton to allow two 12-foot lanes in each direction on Kennedy Boulevard. 5 . Install the median on Eastbound Elk Grove Boulevard, West of Creighton as designed to accommodate two left-hand turn bays onto Southbound Arlington Heights Road; 6 . Authorize staff to establish the public hearing date for the Phase I and Phase II FAUS design study; 6 . Staff is to meet with the property owners who would be impacted by the right-of-way acquisition; and 8 . Staff is to obtain price estimates for new street lights on Biesterfield Road. The meeting was adjourned at 9 : 35 p.m. mw c: President and Board of Trustees Village Manager Assistant Village Manager Administrative Assistant Village Clerk Village Attorney