HomeMy WebLinkAboutEXECUTIVE SESSION - 07/11/1991 - LAND ACQUISITION/RELEASED RES NO 29-95 REVISED
EXsC;ITi E SZsSla",
Elk Grove Village
Date 7-11-91
Time 7 p.m.
TOPIC: Litigation Personnel Land Acquisition X
Village Board Village Board
MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT
C. Zettek, Village President None C. Willis ,
Village Manager
M. Tosto, Village Trustee
N. Czarnik, Village Trustee R. Rummel,
J. Petri , Village Trustee Administrative Assistant
R. Chernick, Village Trustee
J. Bosslet, Village Trustee A. Boffice, Director,
D. Gallitano, Village Trustee Engineering and
Community Development
Vito Sammarco,
Consulting Engineer
Charles Stenzel,
Consulting Engineer
Pursuant to a duly made and approved motion and a majority vote at a
regularly scheduled meeting of the Village President and Board of Trustees
on Ju1V 11, 1991 this Executive Session was called to consider a
land dCqulsitl0ri matter.
Number of pages attached: 2 �V\/
Date(S) of review for release: January 1992
Date of approval for release: , V
REVISED
LAND ACQUISITION
Triton Engineering Consultants reviewed
the recommendations for improving
Biesterfield Road from Martha to Elk Grove
Boulevard. If all of the improvements are
performed, rights-of-way would have to be
acquired at the following locations :
1 . The Northwest intersection of
Biesterfield and Arlington Heights Road
(McDonalds) ;
2 . The West side of Arlington Heights
Road, north of Biesterfield (Elk
Crossing Shopping Center) ;
3 . The Southwest intersection of
Biesterfield and Arlington Heights Road
(Gasoline Station) ;
4 . The Southeast intersection of Arlington
Heights Road, South of Biesterfield-
(rear yard of four residences) .
5. The Northeast intersection of Arlington
Heights Road, North of Biesterfield
(rear yard of three residences) .
6 . A section of property on the South
side of Biesterfield across from
Alexian Brothers Medical Center.
(Trustee Gallitano left the meeting at
8 : 10 p.m. )
The consensus of the Committee was as
follows :
1 . Include a full 500-foot right-hand turn
lane from Southbound Arlington Heights
Road to westbound Biesterfield in the
design;
2 . Include a traffic signal and new
entrance into Elk Crossing and the
Village Hall in the design;
. . . please continue
3 . Do not include right-hand turn lane
from Eastbound Biesterfield to
Southbound Arlington Heights Road;
however, leave this item under study.
4 . Consider reducing, in the Phase III
Design Study, the median area East of
Creighton to allow two 12-foot lanes in
each direction on Kennedy Boulevard.
5 . Install the median on Eastbound Elk
Grove Boulevard, West of Creighton as
designed to accommodate two left-hand
turn bays onto Southbound Arlington
Heights Road;
6 . Authorize staff to establish the public
hearing date for the Phase I and Phase
II FAUS design study;
6 . Staff is to meet with the property
owners who would be impacted by the
right-of-way acquisition; and
8 . Staff is to obtain price estimates for
new street lights on Biesterfield Road.
The meeting was adjourned at 9 : 35 p.m.