Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 12/01/2016 - Capital Improvements Minutes CAPITAL IMPROVEMENT COMMITTEE MEETING MINUTES James P. Petri Public Works Facility December 1, 2016 9:00 AM Present: Trustee Petri,Chairman Trustee Czarnik Trustee Feichter Staff: Vito P. Sammarco,Director of Public Works Brian Lovering, Chief Infrastructure Engineer Jeff Maczko, Senior Engineer Chairman Petri called the meeting to order. STREET MAINTENANCE PROGRAM—2017 The Committee reviewed the proposed street maintenance program which includes the resurfacing of 7.8 miles of streets and the rehabilitation of curb, sidewalk and handicap curb ramps. The 2017 MFT program (5.7 Miles)has an estimated construction cost of$1,330,800. The Business Park program (2.1 Miles)which has an estimated construction cost of$675,500 will be funded utilizing funds from the Business Leaders Forum(BLF)account. In addition,Lively Boulevard from Landmeier Road to Higgins Road will be resurfaced through the use of STP funding. The 20% local match($189,000)will be funded from the BLF account. The Committee recommended the implementation of the proposed program. The Street Maintenance Program is targeted for a contract letting in February 2017. C: Mayor and Board of Trustees Village Manager Deputy Village Manager Village Clerk Director of Public Works Director of Community Development PROPOSED 2017 MFT STREET REHABILITATION PROGRAM Street Begin End Last Length Cost Overlay (Mile) 1 ALABAMA DR VIRGINIA DR FLORIDA LN 2005 0.18 $ 36,200 2 ARKANSAS DR NERGE RD FLORIDA LN 2005 0.38 $ 77,600 3 CAROLINA DR WISCONSIN LN MISSOURI DR 2005 0.17 $ 34,700 4 CREST AVE E ELK GROVE BLVD LAUREL ST 2006 0.29 $ 58,800 5 FAIRFIELD CIR RUSKIN DR END 2006 0.13 $ 25,900 6 FLORIDA LN VIRGINIA DR VIRGINIA DR 2005 0.45 $ 92,300 7 FOX RUN DR UNIVERSITY LN UNIVERSITY LN 1999 0.43 $ 89,300 8 GEORGIA DR VIRGINIA DR FLORIDA LN 2005 0.12 $ 24,700 9 HAMPSHIRE LN GIBSON DR VERMONT DR 2006 0.46 $ 95,200 10 JACKSON CIR MISSISSIPPI LN END 2005 0.02 $ 4,700 11 JOPLIN CIR MISSOURI DR END 2005 0.02 $ 4,800 12 KENTUCKY LN TENNESSEE LN ARKANSAS DR 2005 0.19 $ 39,200 13 LOUISIANA DR TENNESSEE LN TENNESSEE LN 2005 0.16 $ 32,400 14 MEMPHIS CIR TENNESSEE LN END 2005 0.02 $ 5,100 15 MISSISSIPPI LN ARKANSAS DR ARKANSAS DR 2005 0.19 $ 40,100 16 MISSOURI DR VIRGINIA DR WISCONSIN LN 2005 0.18 $ 37,700 17 MOBILE CIR ALABAMA DR END 2005 0.02 $ 4,800 18 ORLEANS CT LOUISIANA DR END 2005 0.04 $ 8,200 19 POTOMAC LN HAMPSHIRE DR GIBSON DR 1999 0.19 $ 40,000 20 RED FOX LN FOX RUN DR FOX RUN DR 2003 0.13 $ 25,900 21 RICHMOND CT VIRGINIA DR END 2000 0.06 $ 12,800 22 STANFORD CIR RUSKIN DR END 2006 0.13 $ 25,900 23 TENNESSEE LN ARKANSAS DR ARKANSAS DR 2005 0.40 $ 83,100 24 VERDE LN CREST AVE LOVE ST 2006 0.24 $ 50,200 25 VIRGINIA DR FLORIDA LN MEACHAM RD 2005 0.30 $ 61,000 26 WINSTON DR BEISNER RD COSMAN RD 2008 0.52 $ 107,400 27 WISCONSIN LN NERGE RD VIRGINIA DR 2005 0.26 $ 52,800 SUBTOTAL RESIDENTIAL PROGRAM ESTIMATE(5.68 Miles) $ 1,170,800 MFT CONCRETE SUPPLEMENT(VARIOUS CURB&SIDEWALK REPAIRS) $ 75,000 MFT ASPHALT MATERIAL PURCHASE(VARIOUS PATCHING) $ 85,000 TOTAL MFT PROGRAM ESTIMATE $ 1,330,800 N Proposed 2017 - MFT Resurfacing Project w E 2017 MFT J1 7 , 0 7�, 1 OAKTON ST 115 4 a Q V. A 1-a N fiR 46? A e 6f� r. AS �31 W aIE TE J EAL 2S, z V VJ, L A NEKOE Ai x 'PI It M DEVON _YEA v, _7 1, I WDEM014 AVE- F� J I L If THORNDALEAVE Date:12/4/ 016 S 0.5 1 2 consortium Miles