1983 Street Maintenance Program
Discussion on the proposed 1983 Street Maintenance Program began with
Trustee Chernick's recommendation that the Street Maintenance Programs
should concentrate major work on major streets and do less on side streets.
He indicated that although he doesn't like slurry seal, perhaps that is the
only thing we can afford to do on side streets. Trustee Chernick also
stated that the street maintenance crews should do more cold patching as he
had noticed potholes this past winter season that went unfilled.
Tom Cech, the Director of Public Works explained that the equipment for crack
sealing would be rented this year and utilized by Village employees for approxi-
mately one month. Last year crack sealing was done by a contractor. Crack
sealing this year will be done on streets that received maintenance 3-4
years ago, which is basically the industrial area. This program should help
postpone major maintenance on those streets. The Committee members agreed
that the crack sealing program should proceed. It was recommended by
Trustee Chernick that crack sealing be funded by the $15,000 in the Corporate
Budget allocated for the Street Maintenance Program.
Trustee Chernick noted that perhaps patching and/or crack sealing would be
sufficient maintenance on Avon, Penrith and Keswick. He requested a con-
tinuation of the meeting until Monday, May 9, 1983, at 7:00 P.M. , so that he
could examine those streets prior to a Committee decision of the resurfacing
program. Trustee Chernick recommended that Burgundy Ct. , Dauphine Ct. , and
Bordeaux Ct. be eliminated from the program as usage is minimal. The
Committee agreed that all other streets recommended be placed on the 1983
Program.
Roundtree Commons
Gary Parrin, Asst. Village Manager, indicated that Roundtree does not want
a duplication of street lights and would prefer an agreement to phase in lights
which meet Village standards when the current ones require maintenance or re-
placement. The Committee agreed, given the following restrictions:
1) an eight year deadline;
2) maintenance responsibility is Roundtree's until the conversion;
3) the lights must be on dusk to dawn; and
4) the arrangement is formalized in the agreement drawn up with the Village Attorney.
1 of 2
Minutes - Capital Improvements Committee Meeting
- continued -
Regarding the matter of sidewalks, the Committee agreed that the side-
walks could be phased in over a 2 or 3 year period as long as the Village
could set the schedule.
Ray Peterson, Village Engineer, noted that there is no continuity of main-
tenance responsibility for Village crews to follow with regard to storm sewer
lines. This fact makes it more difficult to determine responsibility in
future years and uncertainty as to acquiring any necessary authorizations
to check private lines. Ray Peterson recommended that the Village responsi-
bility be only in the right-of-way in order to lessen confusion. Chairman Tosto
indicated that he found it difficult to ask private homeowners to maintain lines
which assist in draining public streets. It was decided by the Committee
that only the lines down the streets become Village responsibility and that
the Village will seek an easement and the right of access in emergency
conditions for all other storm sewer lines.
Following discussion on the topic of plowing streets, the Committee decided
that the Village will salt and plow the streets in Roundtree but that parking
slots will be handled privately. At Gary Parrin's suggestion, the Committee
agreed to require access to the common open areas as a repository of snow.
The meeting was adjourned at 8:52 P.M. to be reconvened at 7:00 P.M. on
Monday, May 9, 1983 for additional discussion on the 1983 Street Maintenance
Program.
Monday, May 9, 1983 7:00 P.M.
Trustee Chernick gave approval of the streets recommended by staff after
having visually inspecting the streets listed on the program.
Respectfully submitted,
Robin A. Weaver
Admin. Ass't. Public Works
RW:wbj
(51083)
cc - President 6 Board of Trustees
Asst. Village Manager
Village Engineer
Director of Public Works
Asst. Director/PW
Director of Finance
Village Clerk
2 of 2
May 10, 1983
Capital Improvements Committee
Summary of Meeting
May 3 & May 9, 1983
1983 STREET MAINTENANCE PROGRAM
Patching . . . . $79,820
Milling . . . . 29,420
Asphalt Resurfacing . . . . 255,581
Sidewalk Removal & Replacement . . . . 21,000
Curb Removal & Replacement . . . . 18,998
Crack Sealing . . . . 8,700
Material and Soil Testing . . . . 1,000
Estimated Total Cost - $414,519
Major streets to be resurfaced include Ridge, Grissom and portions of Lively,
Leicaster, Wellington and Brantwood. Crack sealing will be concentrated in
the industrial area.
A resolution approving the 1983 Street Maintenance Program and appropriating
$399,519 of M.F.T. Funds must be adopted in order to comply with IDOT requirements.
The resolution is attached.
ROUNDTREE COMMONS
The Committee recommends that staff seek the following agreements with regard
to Roundtree Commons:
1. Street Lights - An eight (8) year phase-in
program wherein the Assocation retains maintenance
responsibility until the conversion.
2. Sidewalks - Sidewalks will be phased in by Village
established schedule over a two (2) or three (3)
year period.
3. Storm sewer lines - Only the sewer lines in the
streets will become Village responsibility. The
Village will obtain an easement and access rights
during emergency conditions.
4. Snow plowing - The Village will salt and plow the
streets of snow as necessary and will require access
to the common open areas to dump snow.
SUMMARY BY: Robin A. Weaver
c/ Michael A. Tosto, Chairman
File
April 29, 1983
TO: Capit 1 Improvements Committee
Chair n, Trustee M. Tosto
Trustee R. Chernick
Trustee S. __Uhlarik
FROM: ,7 /
Thomas J. ch, Directo of Public Works
SUBJECT: 1983 Street antenance Program
I respectfully submit th 1983 Street Maintenance Program in the amount
of $414,519, for your re 'ew and consideration. Funding will be $399,519
from Motor Fuel Tax and $ ,000 from Corporate Accounts.
The program is composed of he following operations and their estimated
costs:
Patching . . . . . . .$ 79,820
Milling . . . . . . . 29,420
Asphalt Resurfacing . . . . . . . 255,581
Sidewalk Removal & Replacement . . . . . . . 21,000
Curb Removal & Replacement . . . . . . . 18,998
Crack Sealing . . . . . . . 8,700
Material & Soil Testing . . . . . . . 1,000
Total Cost - $414,519
We are recommending that a milling and standard overlay program replace
the heating, scarifying and repaving program of previous years. We will
be able to perform maintenance on more streets for the same amount of
dollars. Our cost estimates indicate $1.95/sq.yd. for the milling/overlay
operation vs $2.34/sq.yd. for the heating/scarifying/repaving operation.
The crack sealing operation is proposed to be done in-house. We will rent
the necessary equipment and use our Village labor.
Our concrete work program will remain about the same size as last year.
However, less emphasis will be placed on the sidewalk removal and replace-
ment program, due to the favorable results of our recent sidewalk survey
and correspondingly more emphasis on the curb removal and replacement
program to generally improve drainage conditions.
More detailed quantities and cost estimates are contained on the attached
sheets. Also, the list of streets to be included in the program for
resurfacing is attached.
We look forward to reviewing this Street Maintenance Program with
you in the near future.
-" TJC:wbj L�Sv
enc.
cc - Village Manager - Director of Finance
Village Engineer - Ass't. Director of Public Works V
Admin. Ass't./PW - Street Foreman 6
`�J
1
MOTOR FUEL TAX FUND
Summary of Previous Expenditures
Fiscal Street Sidewalk Curb
Year Maintenance Repairs Repairs Other
1973 $146,946 $12,202 -- $48,000 (A)
1974 202,573 10,385 $ 8,160 12,222 (B)
1975 179,386 18,948 18,622 --
1976 259,195 19,470 12,980 --
1977 329,454 24,259 13,062 7,500 (C)
1978 272,848 -- -- 23,532 (D)
1979 505,716 -- -- 64,492 (D)
1980 379,099 -- -- 1,700 (D)
1981 390,051 -- -- --
1982 479,378 -- -- -- „
1983 672,000 -- -- 30,047 (E)
NOTES:
(A) Traffic Signals - Elmhurst and Pratt and Elmhurst and Greenleaf.
(B) Traffic Signal - Arlington Heights and Higgins.
(C) Pavenment Evaluation Program.
(D) Engineering Services for Nicholas'Blvd. Project.
(E) -Higgins/Randall Intersection Provision.
April 29, 1983
1983 STREET MAINTENANCE PROGRAM
Estimated Funds Available
Source of Funds
M.F.T. Balance - March 31, 1983 $ 85,000
Estimated M.F.T. Revenues - 1983
Allotments ($30,000 x 9 months remaining) $270,000
Credit from 1982 program 50,000
320,000
Corporate Budget Funding 15,000
$420,000
Application of Funds
Patching $ 79,820
Mill-Lily 29,420
Asphalt Resurfacing 255,581
Sidewalk Removal and Replacement 21,000
Curb Removal and Replacement 18,998
Crack Sealing 8,700
Material and Soil Testing 1,000
$414,519
RW:wbj
April 29, 1983
STATt OF ILLINOIS
MUNICIPAL ESTIMATE OF MAINTENANCE COSTS
ISbN 1 d 21
Period from January 1, 19 B3 th December 31, 19 83 Municipality_Elk Grove village
ESTIMATED COST OF MAINTENANCE OPERATIONS
MATERIAL. EQUIPMENT. OR LABOR
MAINTENANCE OPERATION oPeRATION
IM0.�0"ft Tarm.GUAM"") ITSM AND W=IPICATION REPIM104= QUANTITY UNIT AMOUNT COST
AND UNIT OWT
Patching bu Village Forces Bituminous Concrete Binder
Course 3,640 ton 21.50
Emulsion 600 aal 2.60 1,560
$ 79,820
Milling Village Forres to Truck
$ 29-426
Emulsion .4.4-1
14,258 gal .60 8,555
Surface Overlay Bituminous Concrete Surface
Course 9,501 ton 26.00 247,026
S 255,581
Crack Sealing Rental of Unit 1 month $2,400 2 400 _
R ,bb�i ddggDhal t Sealer .45 6,300
877_00
Curb 6 Sidewalk Remove 6 ReBLn Sidewalk 1.75 21 ,000
7
Remove & ReplaVe Curb
2 4 li _7.00 18,998
$ 39,998
Testing 1 000
$ 1,000
$ 414,519
Less $I5,000 General Corp. Fund - 15,000
$ 399,519
TOTAL WWIMAWO MAJNTEV�COST $399,519
Subn,d 19 Approved 19
By
YG"ViGal 095" TWO District Engineer
Submit Four(4)Copies to Dist. Engineer
Dorm IILIt 591(1 of 2)
(Rev. 12-73)
sun CW ILUMS
MUNICIfjaL ESTIMATE OF MAINTENANCE COSTS
RESURFACING MOO 2 of 2)
LOCATION SURFACE MAINTENANCE OPERATION SQ.YD
STR[[r FROM TO ["TYPE G L[NGTH WIDTH NO. D[SCRI"ICN OUANTIT�
211 Lively Landmeier Oakton Asphalt 3,722' 37' ill & Overlay 2
' Home Bi c_ a terf_�el it 4801 2131 It It _
1-lye' Bi a,te.rfiPId W- Glenn Home " 89.5 37' " It 4-392
1" nri%%nm NPrqp Biesterfield " 1 75' " It 7,464
1" Brantwood Arl .Hts, Rd Kennedy 11 1 75 ' 11 't $ 1 _
1" Shelle Arl .Hts. Rd Brantwood 11386- 25' 11 1' 1 .056
I" Keswick Brantwood Penrith it 1 11 11 4- 119
W P Keswick Brantwond it 1 „�_ ' 11 11 4,544
'' Grassmere Penrith I1 . 4,?S' " n 2 ,(jI
Ili Avon Penrith Milbeck " _1 179 ' 2SI II 11 3- 117
" Milbeck Keswick GrASsmerp 11501 75' 11 I1 -21161_
" L i %ter Bi cP terfiel 11 7 "Sl6' I 11 n 8.946
" BiP%tPrf4Pl 112
39 I 1 11 It
1" Hastings Shelle Shellev It l0 1' 11 4 016
" Smethwick Chelmsford Brantwond 11 1 199' ' 1 1 3,303
1 Brantwood Chelmsford " 975' 95,
11 n 7,708
" Stonehaven Colman Chelm%fnrd " —865'—251 n u 2,4n3
_1" Chelmsford End ' 1 " 2,421
1" Dauphine Ct. Chelmsford End " 617' 771 11 1 .851
1" Bordeaux Ct Chelmsford End " 470' 271 11 11 1 410
1" Versailles jr_ nrhplmqfnrdn 1 11 11 3.075
1" Northhamptor Cosman Cosman " 1 .391 ' 251 11 11 3.864
1" Ridge Landmeier Devon 7 98o' 33, 11 11
1" Clearmont Ridge _ Cypress End 11830, 321 11 11 6-so
1" Clearmont School Bus Loading Zon 11 1471 121 11 11 196
1" W. Glenn BiesterfielJ S.Glenn It ' 2SI 11 1[ 7 S28
1" S. Glenn W. Glenn Grissom " 966' 2SI 11 11 2.683
I" Anders Nerge S " 100' 1 11 11 278
1
Submit Four (4) copies to District Engineer Form BLR 591 12 of 2)
(Rev. 8-75)
l« c7 r p I �- ,'1-�
II
,.,,� i'a-j-w,.,��? � •," �.wa L .._.I_..J .i C - � 5 Y > II Q = --�'�' � A
tl\�t,.m. 0 3 I r•v Mw'f 3 3 � I p :K
O wn rvq I
t
•
I, N+ IY I �O y1�. •1V h O 1
! «
17
1PO ...T
Q
Ilia,
�_—•r --. .._.._a-11�ilww I j 1 Va�Y/V ii` - N ' 1 PWWMN
INgI♦p !, l pr"II IIILLL+++JJJJJJ} � �J
I � T � _ n'e '�C l--�le•� � � ;`etl •I•YooM
i Q cwarop ''1y{�tlj'I In d W )l._..}I. ._ j \� y' ���I.�\�I-- I'1l��ej{'I',j1, •\ ". •
ti N// �� ��lJ��--`•�,�0="`-1 ��� �, ,G�° \' PIN V'�� •1 �i �v' ]C
�.4 2 wY •lyw.•Vl r�Wi•n•B 'O Q
•, + p lay. �. ^ «uLYV� �l�- _ � V• ���. � ar♦,�
r 1 r 1�� ��1•uV r•q, 'Y vYa� '"��; , M r ��y'u_ � 1
• • D ( 1 A l
ir
y T�=vN \\Y � a.4 wV N•pl ^p. u 4 �� 1 ..
`.�'f 1 �A41 1. g I"PQ1 n p 3 �•♦-3 =IISq_ � oc ' OI
P
1•n 4 'F � I'I� N I �SjH aye •�POJ �� I�V�YiaJ le Ji
''(♦ _
,h�,, F i 1;dl4Jte' S♦ 0 If,
a.- �. ui • : u g � Il rw/arr�
'�n f1� IM��, •'', t Y t�'_y. / � � /�°/ waw r- /� I
♦fiti U1 NUlONI Itlr
ll
I 2 Q
Pl f Ij OR t
¢C
1N'1 I �2 '•n r J � ddd � �� Y
In
44 urya•VN Q
�w
r I
-----
4m' --
- - P O 71V ! •Y / c I i
_. _.._
- - - -- •—^ DYOpW01IH9
tlNIMIHOa
U u o,•rjysl d Z ¢
,°, la♦uy� 3 p
- - = U/yeviJ y raw P
M a•uu _ 7waY p
� � • 1$
I^•�IyY ® �.._.._. - _.:_.- J�': ._ _.._..J � I I••� y�.€wn\.�a •t ; a 8 d ^'I l( �` 1�• a�
rl1 r.1,1'S1�♦,.♦�'♦ 'J ��`VC I �.�w7•♦ � + n"' I�JI �� �I�i� 3 _ .a •
V� V • 1Wt"ll .f F
I I Cdll �,C V1 �. JI? s
eTATa OF IWNM
RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY
MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
BE 1T RESOLVED,by the President and Board of Trustees of the
tam a Aeaaat eY sood at VwHrn
Village of Elk Grove Village Illinois, that theme is hereby
ONw 7rw r VENN OA"
appeepriatEd the sum Of"99,519 of Motor Fuel Taz funds for the purpose of maintaining
e.. , and highways and the applicable provisions of the Illinois Highway Code,from January 1, 19 83
to December E1,12-U.
RE IT FURTHER RESOLVED.that only those streets. highways, and operations as listed and described
on the approved Municipal Estimate of Maintenance Cats, including supplemental or revised estimates ap-
proved in connection with this resolution,are elisWe for-maintenance with Motor Fuel Tax funds during the
pniod as spesi8d above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period
as given above, submit to the Department of Transportation, on forms furnished by said Department,a certified
statement showing expenditures from and balances remaining in the account(s)for this period;and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation,at Schaumburg Illinois.
APMTZ0 M. Patricia Smith .� Village
MN rad,Stan w VWN)
Cyrk In and for the Village
OW.!w or Vms1
of Elk Grove Village w Comfy ag Cook & DuPage
busby oarflfy the lmrsdns to be a tm% YaiEct and eomplata
Department of Transportation President and
copy of a rnr)ntlm adgpW by u. Board of Trustees
e7.Es t MO"W MW t INWAN)
at a meed g an _ , le__
IN TZOTIMONY WRMOP,I ban bustinto rot my hand
and neat Ohl. dy et
District Enrinew
A.D. lt—
(f»AL)
(yarn
O4.Vsw r Tow)
Farm g`R;$1 IRtr,i&TR)