Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 06/01/1993 - CAPITAL IMPROVEMENTS COMMITTEE 6-1-93 7:00 p.m. MEMBERS PRESENT: M. Tosto, Chairman J. Petri, Village Trustee C. Johnson, Village Trustee MEMBERS ABSENT: None STAFF PRESENT: G. Parrin, Village Manager R. Rummel, Assistant Village Manager H. Ingebrigtsen, Director of Finance J. Mac Arthur, Fire Chief T. Cech, Director of Public Works (7:08) M. Pye, Assistant Village Engineer The Committee reviewed the list of Capital Projects as submitted in a May 21 , 1993 memo from the Director of Finance. The Consensus of the Committee was to recommend that the Village Board approve the projects as follows: CAPITAL PROJECTS - CAPITAL PROJECTS FUND Item 1 . Biesterfield Phase 1 & 2 -- Acceptable Item 2 . Boulevard Improvements Phase 3 - Modify as follows: A. Widen Kennedy/Morrison from west of Creighton to Elk Grove Boulevard to include two 11 to 12 foot lanes in each direction. The widening is to be done at the center median. The grass median on Kennedy is to be paint striped by staff to show how 11 foot versus 12 foot lanes would impact the median. B. Resurface Elk Grove Boulevard from Morrison to Tonne using MFT Funds. Do not widen this street . The current contract with the ditch contractor will be reduced by the amount to repair Elk Grove Boulevard due to the ditch work. C. No consensus was reached on adding curbs to Elk Grove Boulevard from Arlington Heights Road to Morrison. Capital Improvemt.its Committee 6-1-93 - 2 - Item 3. Northwest Tollway Improvements -- acceptable Item 4 . Tonne/Landmeier Public Works driveway -- acceptable Item 5. Landmeier Road Improvements -- Completed Item 6. Dierking Terrace -- acceptable. Change title "reconstruct" to "resurface" . Item 7. Boulevard Ditch Improvement -- acceptable Item 8. JFK Bridge -- Completed Item 9. Neighborhood .Drainage Improvements -- acceptable Item 10. Floodproof/berm Old Library -- acceptable Item 11 . Bicycle Overpass at Higgins Road -- acceptable Item 12 . Landmeier Road Improvements -- acceptable Item 13. Storm Water Drainage Study. Move $70,000 study to FY ' 97; move 13 (a) to FY 199; and move 13 (b) to FY 00. Item 14 . Ridge Avenue .Gift Station -- Acceptable Item 15. Fire Administration Remodeling -- Acceptable Item 16. Relocate Landmeier Fire Station -- Acceptable. ,Staff is to seek out alternate locations and obtain property values. Item 17. Bury Electrical Lines along Biesterfield -- Acceptable. CAPITAL PROJECTS - WATER & SEWER FUND Item 18. Elevated Water Storage tank -- Acceptable Have a consultant study possible locations and consider moving Income Tax Surcharge Funds from Ca,Dital Projects Fund to the Water & Sewer Fund to avoid a water & sewer Fund deficit in FY 194 . Item 19 . Elevated water storage tank -- Acceptable Item 20. Relocate Tonne/Landmeier watermain -- Acceptable Item 21 . Watermain Replacement Program -- Remove $110,000 budge=ted to replace watermain in conjunction with the widening of Elk Grove Boulevard. Item 22 . Are all recommended as noted. Note item #25 through should be $465,000 under FY 94; not $160,000. Item 31 . Capital Improvemtuts Committee 6-1-93 3 - CAPITAL PROJECTS - MUNICIPAL PURPOSE FUND Item 32. Are all recommended as noted. through Item 34 . CAPITAL PROJECTS FUND - GENERAL FUND Item 35. Underground Storage Tank upgrade -- acceptable Item 36. Construct Salt Storage dome - staff is to confer with Elk Grove Township about using the township .facility on Arlington Heights Road. Item 37. Are all recommended as noted. through Item 45. The meeting adjourned at 9:30 p.m. lk c: President and Board of Trustees Village Manager, Assistant Village Manager, Administrative Assistant, Village Clerk, Village Attorney, All Department Heads