Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 07/14/1997 - CAPITAL IMPROVEMENT COMMITTEE July 14, 1997 10:00 A.M. JUL 1 6 199"1 Present: Trustee Feichter, Chairman Trustee Petri, Member Trustee Dill, Member Staff: Thomas Cech, Director of Public Works John Stukel, Superintendent of Utilities Perrie Grove Drainage Structure Committee visited the site of the drainage structure on the Commonwealth Edison side of the Perrie Grove Apartments. Committee also visited a similar structure with grate protection at Jenson Park on Virginia Drive near Florida Lane. Alternate improvements to restrict: people from entering the large storm sewer pipes were discussed. Refer to attached memo dated July 1, 1997 from Director of Public Works. Committee unanimously recommended a modified option #3. This improvement includes the installation of seven (7) vertical grates. It would cover the five (5) pipe openings in the structure behind the Perrie Grove Apartments and two (2) additional openings in a headwall downstream of the apartment complex. Estimated cost of the revised option is $3,500 for materials and galvanizing. In house labor will be used to fabricate and install the improvement. ca (C70714A1) c: Present and Board of Trustees, Village Manager, Assistant Village Manager, Assistant to the Village Manager, Village Clerk, Village Attorney, All Department Heads Attachment