Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 04/15/1998 - V � CAPITAL IMPROVEMENT COMMITTEE APRIL 15, 1998 3:30 PM Present: Patton L. Feichter, Chairman James P. Petri, Member Absent: Bart K. Dill, Member Staff: Village Manager RFc� Assistant Village Manager ApiQ Fire Chief d��lgG j 6 j9 Director of Finance F�lF9y Village Attorney Deputy Fire Chief Riddle Purchasing Agent Press: Tim Rooney, Herald OAKTON STREET FIRE STATIONAT✓D SALT STORAGE DOME The Village Manager discussed the status of the project and noted that the entire project as finally contemplated will cost$389,226 over the estimated budget figure. The reason for this was outlined on an analysis sheet(attached). Essentially, three areas of modifications were made to the project impacting the overall bid cost. TrainingFacility acility Advance Work The project as bid includes $161,594 of improvements needed to accommodate the Training Facility. The improvement work done now will prevent the Village from ripping out new concrete, and repouring it when the Training Facility is constructed. Buildiniz/Eneineering/MWRD Code Items Upon plan review, an additional $47,000 of items were required to ensure the project meets all safety codes. The addition of these items will prevent future problems and increase the life span of the improvements. Building Enhancements The Fire Department requested 8 building enhancements which were not reviewed by the CIC previously. Those items amounted to $94,600 upon receiving bids. Several of those items are necessary for the project to be completed. Others are highly desirable in order to do the project right the first time. In addition, several other items were discussed as follows: Contingency A contingency fee of 5% ($122,406) is recommended to be maintained for the project. Funding The Finance Director noted that the Capital Project Fund has in excess of$4 million of unobligated funds available,and the additional $389,226 required can be funded from this source. Voting Upon voting, it was the unanimous consensus of the Committee to approve a motion recommending the following: • That the Village Board place this item for discussion on the April 28 Committee of the Whole agenda; • That the bid awards for the project be placed on the April 28 Consent Agenda; • That an increase to the Capital Project Fund budget in the amount of $389,226 (including all items:recommended by staff with the 5%contingency fee) be placed on the April 28 Consent Agenda; and, • Have the Construction Manager advise the low bidders to complete their paperwork in preparation for the bid awards to be made on April 28, subject to Village Board approval. The meeting concluded at 4:15 pm. C: Village Manager,Assistant Village Manager, Assistant to the Village Manager, Village Attorney, Fire Chief, Deputy Fire Chiefs, Director of Finance, Purchasing Agent, Village Clerk. OAKTON FIRE STATION&SALT STORAGE DOME BUDGET ANALYSIS CAPITAL PROJECT FUND BUDGET SITUATION TOTAL APPROVED BUDGET $2,416,700 REQUIRED BUDGET Total Bid Costs $2,448,120 Other Costs Professional Services $ 235,400 Contingency(5%) $ 122,406 Subtotal Other Costs $ 357,806 TOTAL REQUIRED BUDGET $2,805,926 DIFFERENCE BETWEEN APPROVEII CPF BUDGET AND REQUIRED BUDGET $ 389,226 CAPITAL PROJECT FUND BUDGET INCREASE ANALYSIS A. ADVANCE WORK FOR TRAINING FACILITY: Site work $138,694 Hydrant $ 5,000 PVC pipe $ 3,000 H2O meter $ 1,500 6"water line $ 8,000 Gas line $ 5,400 Total $161,594 B. REQUIRED BUILDING/ENGINEERING CODE ITEMS: 2"Aggregate Base $15,000 Basement Stair Exit $15,000 Raise site 4" $ 9,000 Sewer Pump $ 5,000 Downspouts 3,000 Total $47,000 C. BUILDING ENHANCEMENTS 3"Loop 1420 $14,000 Galvinized Ducts $27,000 Relocate Elec.Poles $ 3,600 Install Sign $ 3,000 Telephone System $15,000 Upgrade Generator $21,000 Building Alarm $ 5,000 2 Speaker Sound System Wiring 6,000 Total $94,600 Total A,B,&C $303,194 In addition,two items will need to be added: An increase to the Capital Replacement Fund for Exhaust System: $51,000; and,from the General Fund,Speaker Connections by NWCDS:$6,500