HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 12/01/1998 - CAPITAL IMPROVEMENTS COMMITTEE
CHERNICK CONFERENCE ROOM
December 1, 1998
3:30 PM
PRESENT: Patton Feichter, Chairman
James Petri, Member
ABSENT: Bart Dill, Member
STAFF: Village Manager -
Assistant Village Manager
Director of Public Works
Fire Chief
OTHERS: John Ochoa, President, FGM, Inc
James Woods,Project Manager, FGM, Inc
ARCHITECTURAL SERVICES
The Village issued a Request For Qualifications (RFQ) for an architectural fine to
study and design improvements at both the Landmeier Public Works Garage and the
Biesterfield Fire Station.
In all, 14 firms responded to the RFQ. Of those, FGM was considered the most
responsive and responsible firm due to their considerable municipal experience in the
northwest suburbs, favorable references, and experience in municipal renovation projects.
The proposed approach to the project is two-fold: a Master Planning Phase and a
Detailed Construction Design Phase. Under the Master Planning phase, FGM will
undertake an analysis of the existing buildings and their physical plant, and determine
needs for each facility. From that point, they will prepare conceptual plans for
consideration which resolve the functional and aesthetic requirements for each facility.
When the plans are narrowed down, FG1V[will prepare a budget and begin moving
toward the operational phase.
The cost to perform the Master Pluming Phase is $10,000 with $5,000 to be
credited toward the Detailed Construction Design Phase. The time frame to complete the
Master Planning phase is approximately 1 month depending upon meeting availability
during the Holidays, etc.
The members of the CIC provided their thoughts to FGM regarding each facility. Those
thoughts included:
Landmeier Public Works Garage
• Aesthetically, the building must "blend"with neighboring residential homes
while also serving as a "model"to the business community to show how an
older patchwork building can be modernized on the outside.
• View the Schaumburg Public Works facility on Plum Grove Road and the
Mount Prospect facility at Central & Busse for ideas of proper aesthetics.
• Emphasize landscaping, trees, bushes, and flowers at the facility.
• Consider potential teardown of some portions of the facility that are old or
outdated.
• Consider proper placement of generators, etc. which may be viewed from the
street or neighboring residents.
• Consider reclading of the facility.
• Examine ADA issues.
Biesterfield Fire Station
• Avoid any designs that woulc lend a negative appearance along the entrance
into the Town Center.
• Consider a second story on the facility to maintain landscaping and green
space along the entrance into the Town Center.
• Examine the Oakton Street Fire Station design for ideas regarding aesthetics
and livability.
• Ensure landscaping is contemplated in the design along with necessary
electrical outlets placed outdoors for Holiday lighting, etc.
• Examine ADA issues.
The consensus of the CIC was to recommend that the Village Board approve a contract
with FGM, Inc., Oak Brook, Illinois for the Master Planning Phase of the project in an
amount of S 10,000, and that the contract award be placed on the December 15 Village
Board agenda.
The meeting adjourned at 4:10 PM.
c: President & Board of Trustees, Village Manager, Assistant Village Manager, Assistant
to the Village Manager, Village Clerk, Fire Chief, Director of Public Works.