Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 06/10/1999 - ' ,,/ L �J P lLcr Y t�/�yj CAPITAL IMPROVEMENTS COMMITTEE JUNE 10, 1999 ';:00 PM CHERNICK CONFERENCE ROOM Present: Patton Feichter, Chair o Trustee Petri, Member Absent: Trustee Dill, Member Staff: Asst. Village Mgr. Rummel Deputy Fire Chief Clark Training Coordinator Sullivan ' n Oakton Street Fire Training Facility o' J The Capital Improvements Committee met for the purpose of reviewing the Fire Department's request for additional funding for the construction of the Fire Training 4— Facility. Staff explained the budgetary and construction cost information that provide the reasons for the additional funding. These reasons include the fact that the actual bids/costs for 3N the construction exceed the original cost estimates and also that contingency fees were L not taken into consideration in the original estimate. In addition, there were code 9J improvement requirements made at the direction of the Engineering and Community o Development Department and the Metropolitan Water Reclamation District that were not a originally included in the building design. 0 The total additional funding requested by the Fire Department was $450,000 based on a 3 revised total project cost of $1,200,000. This includes $300,000 for the additional construction costs and $150,000 for the additional Symtron "fireplace" that was previously approved by the Village Board of Trustees. A copy of the staff report is attached. The consensus of the Capital Improvements Committee was to recommend that the Village Board increase the budget to $1 ,200,000 for the project and award the bids to initiate construction. It was emphasized that the contractors be pre-approved. 0 The meeting adjourned at 3:20 PM. C: President & Board of Trustees, Village Manager, Assistant Village Manager, Assistant to the Village Manager, 'Village Clerk, Fire Chief, Deputy Fire Chiefs � C3 0 �0 OAKTON STREET TRAINING FACILITY I. BUDGET REQUEST DETAIL Original BWC Construction Cost, 3-11-98 $455,000 Add, Symtron Live Fire Training Equipment Cost 400.000 855,000 Add, BWC Design/Construction Mgmt. Fees 95.000 950,000 Less, BWC/Symtron Construction Cosis Redundancies 100.000 850,000 Less, Second Fireplace Costs 150.000 700,000 Add, SCBA Air Compressor Cost 50.000 Training Facility Budget Request $750,000 ll. CONSTRUCTION FUNDS AVAILABLE Training Facility Budget $750,000 Less, SCBA Air Compressor Cost 50.000 700,000 Less, BWC Design/Construction Mgmt. Fees 95.000 605,000 Less, Symtron Live Fire Training Equipment Cost 250.000 Construction Funds Available (reflects no contingency funds) $ 355,000 OAKTON STREET TRAINING FACILITY III. CONSTRUCTION COST SUMMARY BIDDER WORK ESTIMATE ACTUAL DIFFERENCE (1-C4-99) Fisher Const. General $440,000 $420,000 $20,000 Corkill Electric 26,118 46,000 (19,882) Bartlett Mechanical 8,500 14,929 (6,429) Doucette Sprinklers 8,250 7,750 500 Bert Young Plumbing 8,250 13,010 (4,760) Underdrain -0- 10,000 (10,000) Draft Pit -0- 26,700 (26,700) Excavation =0_ 5.000 (5,000) Total (Bid Estimate v. Actual) $491,118 $543,389 $(52,271) Add, BWC 5% Contingency Estimate 23,704 27.169 (3,465) $514,822 $570,558 $(55,736) Additional Costs: Code Requirement Improvements 17,657 (17,657) 1%Contingency Increase 5,434 ( 5,434) Smoke Machine Piping 16,050 (16,050) Preliminary Elect/Plumbing Work 20.825 (20,825 Total Building Construction Costs $630,524 $(139,406) -------- --------- -------- --------- OAKTON STREET TRAINING FACILITY IV. TOTAL TRAINING FACILITY COSTS Building Construction Costs $630,524 Symtron Fire Training Equipment 400,000 SCBA Compressor 50,000 Design, Construction, Mgmt. Fees 95.000 Total Training Facility Costs: $1,175,524 V. Additional Funds Requested Total Training Facility Costs $1,175,524 Training Facility Budget 750.000 Additional Funding Reauest $ 425,524 VI. Variance Summary Total Training Facility Cost Variance $ 425,524 Less, 2nd Fireplace 150.000 (previously approved but not included) Construction Costs $275,524