HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 08/09/1999 - CAPITAL IMPROVEMENT COMMITTEE
MEETING MINUTES qF
AUGUST 9, 1999 — 11:00 A.M. CF/VFD
AUG
111999
Present: Trustee Feichter, Chairman Vl`ZAGf
C
Trustee Petri, Member if ASS�fflCf
Trustee Dill, Member
Staff: Gary Parrin, Village Manager
Thomas Catch, Director of Public Works
John Stukel, Superintendent of Utilities
Scott Nailor, Utility System Foreman
Well Reoairs and Emeraencv Backuo Water Suooly
The Committee reviewed the Director of Public Works June 18, 1999, memo regarding
the current status of the Village's emergency backup water supply and condition of the
wells.
Several wells are in need of extensive repairs:
➢ Well#2 at Busse and Touhy
• Well#6 at Busse and Greenleaf
➢ Well#13 on Mississippi Lane-just south of Nerge Road
Village Manager Perrin explained the Joint Action Water Agency's (J.A.W.A.)water
transmission system and stressed the neeed for the Village to have a reliable backup water
supply system of sufficient capacity, since water service is critical and essential to the well
being of residents and businesses of this,Community. J.A.W.A. does not have a backup
water supply system. Each member community is responsible for providing their own
water supply in the event of a J.A.W.A.failure.
Director Cech explained the basis for his recommended capacity of the backup water
supply.
The Committee reviewed the various repair strategies.
The Committee unanimously recommended for Village Board consideration:
➢ Approval of Repair Strategy#2 t1lat repaired all three(3) inoperable wells and
authorized Staff to proceed with the planned water system interconnection with
the Village of Roselle.
➢ Authorization for Staff to secure a well repair contractor in an estimated amount of
$255,000 from the Water and Sewer Fund. (This figure includes Superintendent
Stukel's request for$18,000 additional funds for cleaning and televising the well-
casing pipe prior to commencing with repairs.) (The Roselle interconnection is
estimated to cost$45,000.)
c: President and Board of Trustees, Village Manager, Assistant Village Manager,
Assistant to the Village Manager, Village Clerk, Village Attorney, All Department
Heads
(Capital Improvement Committee—8/09/99)