HomeMy WebLinkAboutICRC - 10/02/2003 - v/4 • CDL,54./e- INDUSTRIAL/COMMERCIAL REVITALIZATION COMMISSION ELK GROVE VILLAGE BUSINESS PARK MEETING MINUTES OCTOBER 2, 2003 CHERNICK CONFERENCE ROOM Present: Trustee Jim Petri Trustee Sam Lissner Scott Golbeck Bob Kleckauskas Scott Swako Staff: Vito Sammarco, AssY. Director Comm. Rev. Nancy Carlson, Economic Development Officer Absent: Ron Behm Jack Connelly Tom Farrell John Gullo George Johnson Tom Porte Ed Ruskowski Jeff Snyder The Commission was updated on the status of ICRC Projects: BUSSE ROAD AND DEVON AVENUE INTERSECTION The intersection work has been substantially completed. Traffic signal installation and punch list work should be completed by mid-November 2003. DEVON AVENUE WIDENING— BUSSE ROAD TO ELMHURST ROAD The County has recently initiated Stage 2 of the roadway construction with an anticipated completion this year. The construction of a retaining wall and the north half of the box culvert at Willow Creek is underway. Completion of the box culvert this year will be weather-dependent. BUSSE ROAD AND LANDMEIER ROAD INTERSECTION Roadway widening operations and the construction of sidewalk will be completed early next week. The roadway surface course will be placed by mid — October 2003 and traffic signal installation will be completed by December 2003. Page 2 BUSSE ROAD SIDEWALK AND BUS SHELTER IMPROVEMENTS The project was awarded to Campobasso Construction in July 2003. Sidewalk and bus shelter pads between Mark Street and Landmeier Road are under construction and are scheduled for completion by late November. Construction operations will resume in May 2004 between Landmeier Road and Oakton Street. All work will be completed by July 2004. LIVELY BOULEVARD AND OAKTON STREET Prefinal contract plans have been completed for the project. The limits of the improvement have been extended south along Lively Boulevard to Howard Street. Right-of-way acquisition for the project is proceeding with 4 of the 5 properties acquired to date. The contract letting for the project is scheduled for January 2004. Lively Boulevard will be restricted to a one lane operation during construction. WILLOW CREEK BOX CULVERTS The preliminary design studies, including the hydraulic study and structural analysis of the corrugated metal pipe culverts, were submitted to the State for review. The design recommendation is to completely replace the structures with cast- in-place concrete box culverts. Preliminary design studies for the project will be completed in Spring 2004. DEVON AVENUE AND TONNE ROAD INTERSECTION The preliminary contract plans for the project have been completed. Land acquisition for 13 parcels is currently underway for the project. The Village has obtained an additional $950,000 of Federal funding for the roadway construction and right-of-way acquisition. STREET LIGHTING PROGRAM The final phase of the local route lighting program has been completed. ComEd has provided service to the new lights at 13 of the 31 power sources. Lighting systems along Lively Boulevard and Oakton Street will be installed as part of future roadway construction projects. ARLINGTON HEIGHTS ROAD AND HIGGINS ROAD LIGHTING Contract plans have been submitted to the State and County for intersection lighting at the intersection of Arlington Heights Road and Higgins Road. The project will feature a new business park arterial street light fixture. The contract letting for the project is targeted for February 2004. Page 3 STREET SIGN REPLACEMENT PROGRAM The street sign replacement project has been initiated. The Police Department is conducting an inventory of all signs within the business park. WELL SITE AND GATEWAY ENHANCEMENTS The well site and gateway enhancements will be designed over the winter in order that the projects can be readied for contract lettings in the Spring 2004. BUSINESS PARK TROLLEY TOUR A trolley tour of the Business Park was held on September 18, 2003. Over 30 real estate brokers attended the tour. MARKETING SURVEY The Chaffee Group conducted a survey of 26 business leaders in the Business Park. Three (3) key factors for business tenants are accessibility, costs and Village services. The next regularly scheduled meeting of the ICRC is February 5, 2004. VPS.pcd C: Mayor & Board of Trustees, Trustee Petri, Trustee Lissner, ICRC Commissioners, G. Parrin, Village Manager, R. Rummel, Ass Y. Village Manager, Matt Roan, AssY. to Village Manager, G. Knickerbocker, Village Attorney, A. Walsh, Village Clerk, A. Boffice, Director of Engineering & Community Development, T. Cech, Director of Public Works, D. Goostree, Fire Chief, S. Schmidt, Police Chief, M. Cavallini, Health & Community Services Director N. Carlson, Economic Development Officer