HomeMy WebLinkAboutZONING BOARD OF APPEALS - 11/13/1998 - 98-9 ELK GROVE VILLAGE ZONING BOARD OF APPEALS Meeting Minutes November 13, 1998 Present: R. Phillips R. Penley J. Oliveto E. Hauser T. Rogers J. Franke C. McClelland G. Schumm Staff: J. Zaucha, Plan Reviewer Zoning Variation - Docket 98-9 Chairman Robert Phillips called the meeting to order at 7: 00 p.m. and read the legal notice. The petitioners Mr. and Mrs. Robert Kimber were sworn in and asked to present their case. Mrs. Kimber indicated that a variance had been previously granted 12 years ago for the existing deck. Mrs. Kimber explained that the deck was originally needed to allow enough room for her mother-in- law's wheel chair. Mrs. Kimber stated that they would now like to enclose the deck because of her alergies. Mr. Schumm asked Mrs. Kimber if the neighbors have any concerns. Mrs. Kimber responded that there have been no negative comments made by her neighbors. Mrs. Kimber did however indicate that one of her neighbors originally misinterpreted what the variance was for, and that after explaining it to the person, they did not have any objections to the variance. Mrs. McClelland asked for clarification on how the structure was to be constructed. A representative from Back Yard Enclosures proceeded to explain the basic structural features of the enclosure. At that time, Mr. Penley pointed out that what was being described by the contractor did not match what was shown on plans submitted to the ZBA. Mr. Penley identified that the submitted plans for approval reflect a flat shed-type roof, and what was being described by the contractor was a gable style roof. At that time, the petitioners and the contractor explained that a gable style roof is being proposed and that plans submitted to the ZBA reflecting a flat roof are not accurate. Continued... Page 2 Mr. Hauser asked if future construction of an enclosure on the deck was discussed during proceedings for the original deck variation. Mrs. Kimber stated that although she did not anticipate construction of an enclosure at that time, the Board did recommend that the deck be reinforced to allow for future construction of an enclosure. Mr. Oliveto asked if the deck would be sufficient to support the enclosure. The contractor indicated that it is common to construct this type of light weight enclosure on wood framed decks supported by concrete piers. Mr. Franke asked if there mould be any heat provided to the enclosure. Mrs. Kimber responded, no. Mr. Zaucha was asked if the Building and Engineering Departments have any concerns. Mr. Zaucha had no comments regarding zoning issues, but did indicate that .if the deck needed to be structurally reinforced to support_ the enclosure, the contractor would be required to do so. At 7:19 Mr. Shumm motioned to grant the variance which was seconded by Mr. Franke. A vote was taken which was unanimously in favor of granting the variance. The meeting was adjourned at 7:21 p.m. Respectfully Submitted, ames S. Zaucha Plan Reviewer c: Chairman and Members Zoning Board of Appeals, President and Board of Trustees, village Manager, Assistant Village Manager, Assistant to the Village Manager, Administrative Intern, Director of Engineering and Community Development, Director of Public Works, Fire Chief, Deputy Fire Chief(2) , Assistant Fire Chief, Chairman and Members of Plan Commission