ELK GROVE VILLAGE PLAN COMMISSION
January 26, 1976
The regular meeting of the Plan Commission was called to order
at 8: 15 p.m. on Monday, January 26, 1976, in the Staff Conference Room
of the Municipal Building, 901 Wellington Avenue.
MEMBERS PRESENT: STAFF PRESENT:
William Shannon Gary Parrin ,
Leah Cummins Administrative Assistant
Edward Hauser Thomas Rettenbacher,
Thomas Hamilton Building Commissioner
Alvin Krasnow
Stanley Klyber
Wm. Wesley (9:00 p.m.)
MEMBERS ABSENT:
Warren Jacobsen
Eli and Dina Field Resubdivision
Action on this resubdivision was deferred because the plat
did not include lot or unit numbers . The corrections were properly
reflected on the plat and resubmitted.
Krasnow moved to approve the resubdivision. Klyber seconded
the motion. All present voted 'AYE' .
T & G Resubdivision
This property is located a few hundred feet north of Landmeier
at the northwest corner of Landmeier Road and Lively Boulevard.
Klyber moved to approve the resubdivision. Cummins seconded
the motion. All present voted 'AYE' .
Higgins Industrial Park Unit No. 173
The Village Engineer approved Unit No. 173 and noted that it
is not in the flood plain.
Cummins moved to approve the resubdivision. Hauser seconded
the motion. All present voted 'AYE' .
Centex Industrial Park Unit No. 198
Hamilton moved to approve the subdivision of the property,
located at the southeast corner of Lively and Pratt Boulevards.
Krasnow seconded the motion. All present voted 'AYE' .
Section 22
Bob Calkins , Steve Bilheimer, Mike Ives and Rick Burton were
present for an informal discussion of the development of Section 22.
The following is the plan data for the 187.3 acre tract .
•
Plan Commission Minutes - 2 - January 26, 1976
Section 22 (continued)
PLAN DATA
DEDICATED GROSS
USE NET AREA STREETS AREA
Acres+ Acres+ Acres+
Single Family 109.2 39.7 148.9
Open Space 27.8 2.4 30.2
Well Site 1 .2 0.3 1 .5
Fire Station 2.0 0.4 2.4
Public Works 4.0 0.3 4.3
TOTAL 144.2 43.1 187.3
Number of Single Family Lots 485 D.U.s
Minimum Lot Size (72'x105' ) 7,560 sq. ft.
Average Lot Size 9,808 sq. ft.
Net Residential Density (4851109.2) 4.44 DU/Ac.
Gross Residential Density (485-148.9) 3.26 DU/Ac.
Gross Project Density (4851187.3) 2.59 DU/Ac.
The 117.2 acres of land south of Nerge Road will have 297
D.U.s (2.53 D.U.s/Acre) with 21 gross acres of open space
located in two parks. North of Nerge Road there is 70. 1
acres where 188 D.U.s (2.68 D.U.$) and two parks consisting
of 9.2 gross acres will be located.
Mr. Bilheimer stated that his discussions with School
District 54 representatives resulted in the District not
requiring school property in Section 22. They felt that
Stevenson School could adequately handle the increased student
population in Section 22. A Jr. High School would be needed,
however, but this could be provided at a much later time when
Centex develops their remaining tracts of land.
Gene Sterbis of the Roselle Plan Commission was present to
review the Section 22 proposal . He expressed concern about the
well site location south of Nerge Road. Roselle is requiring a
developer to construct a well in the same vicinity. Mr. Sterbis
estimated their well site to be approximately 200 yards from the
proposed Elk Grove well site. The Administrative Assistant will
have the Engineering Division contact Roselle for further
locational information and determination of any possible
detrimental effects to the water table due to their close
proximities.
Shannon expressed concern to the Centex officials that there
is no large area of land for active recreation such as the Lions
Park area. He then questioned Centex about their development
schedule. Mr. Bilheimer replied that Centex would like to
start land development in Spring, 1976.
It was noted at the meeting by Mr. Bilheimer that Centex
intends to upgrade various park sites west of 53 as well as the
Section 19 pond. This will be done in Spring.
Plan Commission Minutes - 3 - January 26, 1976
The meeting adjourned at 9:50 p.m.
Submitted by:
G;a, G"c/
Ga E. rin
A�dpinist.;/ative Assistant
GEP:ms
c: Chairman s Members of Plan Commission, Village President & Board
of Trustees , Village Clerk, Village Manager, Administrative Assistant ,
Administrative Intern, Building Commissioner, Director of Public
Works/Engineering, Planning Consultant , Director of Parks and
Recreation, Calkins , Centex.
(1/27/76)