Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 12/13/2017 - Capital Improvements - 2018 Street Maintenance CAPITAL IMPROVEMENT COMMITTEE MEETING MINUTES James P. Petri Public Works Facility December 13, 2017 9:30 AM Present: Trustee Czamik, Chairman Trustee Petri Trustee Franke Staff: Vito P. Sammarco, Director of Public Works Brian Lovering, Chief Infrastructure Engineer Chairman Czarnik called the meeting to order. STREET MAINTENANCE PROGRAM—2018 The Committee reviewed the proposed street maintenance program,which includes the resurfacing of 5.8 miles of streets and the rehabilitation of curb, sidewalk and handicap curb ramps. The 2018 MFT program (3.8 Miles)has an estimated construction cost of$965,000. The Village has also reserved$160,000 of MFT funds for roadway patching and concrete work on various streets throughout the Village. The Business Park program (1.8 Miles) which has an estimated construction cost of$725,000 will be funded utilizing funds from the EGV 2025,Busse-Elmhurst TIF, and Business Leaders Forum accounts. In addition,John F. Kennedy Boulevard and Elk Grove Boulevard from Arlington Heights Road to Victoria Lane will be resurfaced through the use of STP funding. The total project has an estimated cost of$3,251,239 with the local match being$1,272,039,which will be funded from the Capital Improvement account. The Committee discussed the development of a multi-year street rehabilitation program in order to identify anticipated funding level. A meeting will be scheduled in mid-February to further discuss the multi-year program. The Committee approved the 2018 MFT Street Maintenance Program. The Program is targeted for a contract letting in February 2018. C: Mayor and Board of Trustees Village Manager Deputy Village Manager Village Clerk Director of Public Works Director of Community Development PROPOSED STREET REHABILITATION PROGRAM RESIDENTIAL STREET RESURFACING (MFT) Street Begin End Last Length Width(ft) Area Area FY18-19 Overlay (ft) (sq ft) (sq yd) Cost per LIN FT based on Previous Year's Program(For Similar Rated Street) $48.00 CYPRESS LN WALNUT LN REVEREND MORRISON BLVD 2001 4,141 25 113,550 12,617 $ 183,000 CLEARMONT LN END WESTVIEW DR 2007 1,377 25 35,425 3,936 $ 60,500 COSMAN RD CHELMSFORD LN WINSTON DR 2006 3,766 25 98,150 10,906 $ 157,500 LEICESTER RD WELLINGTON AVE WINSTON DR 2002 857 25 21,425 2,381 $ 38,000 REVERE LN GIBSON LN VERMONT DR 1999 770 25 19,250 2,139 $ 35,500 PEBBLE BEACH CIR UNIVERSITY LN UNIVERSITY LN 1999 1,120 25 30,000 3,333 $ 52,000 GREENSBORO CT PEBBLE BEACH CIR END 1999 407 25 18,050 2,006 $ 30,500 FERN DR CLEARMONT LN RIDGE RD 2002 1,465 25 37,625 4,181 $ 63,500 BROOKHAVEN DR CYPRESS LN RIDGE RD 2003 1,572 25 40,300 4,478 $ 67,500 BORMAN CT W GLENN TRL W GLENN TRL 2005 955 25 23,875 2,653 $ 42,500 CONRAD CT W GLENN TRL W GLENN TRL 2005 1,135 25 28,375 3,153 $ 49,500 LOVELL CT W GLENN TRL W GLENN TRL 2005 1,050 25 28,350 3,150 $ 49,500 CERNAN CT GRISSOM TRL GRISSOM TRL 2005 250 25 26,250 2,917 $ 46,000 CUNNINGHAM CIR S GLENN TRL END 2002 300 25 14,100 1,567 $ 24,000 SCHIRRA CIR BIESTERFIELD RD END 1999 300 25 10,820 1,202 $ 20,500 YOUNG CIR WHITE TRL END 1999 165 25 7,445 827 $ 15,000 COLLINS CIR WHITE TRL END 2004 165 25 7,445 827 $ 15,000 STAFFORD WHITE TRL END 2004 165 25 7,445 827 1 $ 15,000 SUBTOTAL RESIDENTIAL PROGRAM ESTIMATE(3.8 Miles) $ 965,000 MFT CONCRETE SUPPLEMENT(VARIOUS CURB&SIDEWALK REPAIRS) $ 75,000 MFT ASPHALT MATERIAL PURCHASE(VARIOUS PATCHING) $ 85,000 TOTAL MFT PROGRAM ESTIMATE $ 1,125,000 BUSINESS PARK STREET RESURFACING (BLF) Cost per LIN FT based on Previous Year's Program For Similar Rated Street $76.00 CROSSEN AVE BRUMMEL AVE OAKTON ST 2002 1,801 37 66,637 7,404 $ 126,000 LIVELY BLVD HIGGINS RD END 2002 1,712 37 63,344 7,038 $ 89,000 PAGNI DR LIVELY BLVD END 2002 1,001 37 37,037 4,115 $ 81,500 GARLISCH DR LIVELY BLVD PAGNI DR 2002 1,181 37 43,697 4,855 $ 132,000 SEEGERS AVE OAKTON ST HIGGINS RD 2002 1,236 37 45,732 5,081 $ 92,000 MCCABE AVE TOUHY AVE LANDMEIER RD 2000 1,109 37 41,033 4,559 $ 847000 CAMBRIDGE AVE JARVIS AVE LANDMEIER RD 2004 535 37 19,795 2,199 $ 44,500 JARVIS AVE BUSSE RO CAMBRIDGE AVE 2004 1,000 37 37,000 4,111 1 $ 76,000 SUBTOTAL BUSINESS PARK PROGRAM ESTIMATE(1.8 Miles) $ 725,000 *Funded by the EGV 2025,Busse-Elmhurst TIF and the BLF fund. N �F c� E Proposed 2018 - Resurfacing Projects W _ S 2018 Business Park 0 2018 MFT x c� w t O X90 ti O 2 Q 2 E HIGGINS RD OAKTON ST > O c C�7 LOf �� w I TOUHY AVE j u' a. WISE RD m ._...._ Z = BIESTERFIELD RD m o 0 w z v m z iv NERGE RD m > _ > --..,..� N ._....,.., v ELGIN OHARE EXpy W DEVON AVE E DEVON AVE m N W J Q O O W NORTH THORNDALE AVE Y d' Date:12/8/2017 0 ■ 0 0.5 1 2 consortium Miles