Loading...
HomeMy WebLinkAboutCAPITAL IMPROVEMENTS - 11/02/2012 - MFT STREET MAINTENANCE 2013 CAPITAL IMPROVEMENT COMMITTEE MEETING MINUTES Chernick Conference Room November 2, 2012 9:00 AM Present: Trustee Petri, Chairman Trustee Feichter, Member Absent: Trustee Czarnik, Member Staff: Vito P. Sammarco, Director Of Public Works Dave Preissig, Deputy Director of Infrastructure Chairman Petri called the meeting to order. MFT STREET MAINTENANCE PROGRAM—2013 The Committee reviewed the proposed street maintenance program which includes the resurfacing of 5.0 miles of streets and the rehabilitation of curb, sidewalk and handicap curb ramps. The 2013 MFT program shown in the attached exhibits has an estimated construction cost of$l,l 11,000. To date the Village has received three MFT supplemental payments of approximately $450,000 from the State. One final payment in the amount of$150,000 is anticipated in 2013. The MFT fund balance as of April 30, 2013 is estimated to be $1,500,000. The Committee recommended the implementation of the proposed program. The Street Maintenance Program is targeted for a contract letting in late February 2013. BIESTERFIELD ROAD REHABILIATION Proposed improvements to Biesterfield Road between Arlington Heights Road and Martha Street were also discussed. The roadway will be resurfaced, and the curb and sidewalk will be rehabilitated. The estimated construction cost for the improvement is $1,100.000. The project will be funded through the Capital Projects fund. LED STREET NAME SIGNS The ICRC program includes the installation of illuminated street name signs along arterial routes. Trustee Petri recommended that LED street name signs be installed along Biesterfield Road during the 2013 construction season. C: Mayor and Board of Trustees Village Manager Deputy Village Manager Assistant Village Manager Village Clerk Director of Public Works Deputy Director of Public Works (2) PROPOSED 2013. STREET REHABILITATION PROGRAM Last Length Street Begin End Overlay (ft) E HIGGINS RD EG WOODS PLAZA WILDWOOD LN 1997 1,430 $ 40,300.00 LAUREL ST RIDGE AVE TONNE RD 1999 2,589 CORRINTHIA CT CORRINTHIA DR END 1999 437 CORRINTHIA DR VERDE LN LOVE ST 1999 913 LILAC LN CREST AVE VERDE LN 1997 795 $ 212,200.00 CARLISLE AVE DEVON AVE BRANTWOOD AVE 2000 3,082 $ 104,900.00 CARSWELLCT CARSWELL AVE END 1998 506 $ 27,400.00 GATESHEAD N CHELTENHAM RD BANBURY AVE 2003 777 $ 26,100.00 BORDEAUX CT CHELMSFORD LN END 2003 626 BURGUNDY CT CHELMSFORD LN END 2000 930 DAUPHINE CT CHELMSFORD LN END 2000 784 VERSAILLES CIR CHELMSFORD LN END 2000 1,112 $ 121,300.00 MORGAN DR VON BRAUN TRL END 1997 675 CHAFFEE CT VON BRAUN TRL END 2000 456 WORDEN WAY VON BRAUN TRL END 2000 1,829 VON BRAUN TRL ROOSA LN MITCHELL TRL 1997 2,138 WM. CLIFFORD LN VON BRAUN TRL END 2000 1,426 MITCHELL TRL VON BRAUN TRL NERGE RD 1997 1,589 WOOD TRL KATHLEEN WAY WM. CLIFFORD LN 2000 1,145 $ 321,500.00 BONNIE LN HOWARD ST OAKTON ST 1995 2,332 HOWARD ST PERRIE DR LIVELY BLVD 1995 820 $ 142,200.00 MFT CONCRETE REPAIRS $ 40,000.00 MFTASPHALTPURCHASE $ 50,000.00 ADA IMPROVEMENTS $ 25,100.00 TOTAL 2013 PROGRAM $1,111,000.00 5.0 Miles U Ml9 Al3/Jl W AT3N1 �� O �� Mi9 AM1l3{IM1 � I' / OAl6 A'[3/fl ' N jl € ic v � 3 Z P1, b k, Qa`fC j. kiO Fn w "A.ui PIN'101. val WA co CD Ew UJ 149 ?E O = W A X F vIm � k�j" ,U