Loading...
HomeMy WebLinkAboutAGENDA - 09/28/1993 - VILLAGE BOARD AGENDA Sas Next ORD: 222 (2324) Next RES: 3- -93 (55-93) Recess : 95p.m. AGENDA Regular Village Board Meeting September 28, 1993 Elk Grove Village 1 . Call to Order 2 . Invocation (Rev. Charles H. Hensel , St . Nicholas Episcopal Church) 3. Approval of Minutes of September 14, 1993 4 . President 's Report 5 . Accounts Payable Warrant 6. CONSENT .AGENDA A) Consideration to authorize payment of $1 , 450 to the Northwest Municipal Conference for the joint intervention in the Foreign Fire Insurance litigation. (The $1 ,450 contribution would be used to establish a $10, 150 fund to appeal the Foreign Fire Insurance litigation. In total , seven (7) communities are contributing to the establishment of the fund. ) B) Consideration to increase a contract with Greco Contractor, Des Plaines, Illinois, for the construction of Phase II Drainage Improvements at a cost of $37,000 for a total contract cost not to exceed $408, 837 .25 . (On September 8, 1992, the Village Board awarded the contract to Greco at a cost of $371 , 837 .25 . (The additional cost was due to two unexpected circumstances. First, the volume of material removed from the Circle Bay site was 5,500 cubic yards more than originally anticipated, resulting in a cost of $27,000. Second, a utility conflict at Udall Park prevented a storm sewer as planned. The total cost to re-route the storm drain was $9, 900. (A report from the Director of Engineering and Agenda for VB MeetingIR28-93 ' -2- Community Development Director, recommending approval , is attached. ) C) Consideration to award a purchase contract to the lowest responsive and responsible bidder, McKay Contractors, Inc. , Chicago, IL for snow and ice control for the 1992-93 season at a per unit cost not to exceed the following and at a total contract cost not to exceed $27, 000. 1992/93 1993/94 Per Hour Per Hour (3) Road Graders w/Operators Regular Time $120.00 $120.00 Overtime & Saturdays 135.00 140.00 Sundays & Holidays 150.00 160.00 (2) Endloaders w/Operators Regular Time $120.00 $120.00 Overtime & Saturdays 135.00 140.00 Sundays & Holidays 150.00 160.00 (4) 6-Wheelers w/Operators Regular Time $ 95.00 $ 90.00 Overtime & Saturdays 110.00 120.00 Sundays & Holidays 125.00 150.00 (Reports from the Purchasing Agent and Director of Public Works recommending approval are attached: (Funds will only be expended on as "as needed" basis. ) (D) Consideration to adopt the following resolutions: -- RESOLUTION NO. 51-93 (attached) authorizing the Village President to execute a joint agreement with IDOT - Arlington Heights Road improvement at I-90 (full interchange) ; and -- RESOLUTION NO. 52-93 (attached) appropriating funds in the amount of $6,900 for the installation of an OPTICOM system in conjunction with the roadway improvements on Arlington Heights Road, FAU Route 2626 at Interstate 90 (Northwest Tollway) . (The agreement defines the responsibilities of the State and the Village in constructing a full interchange at Arlington Heights Road and Interstate 90. (The State is responsible for administering all aspects of the improvement as well as installing the emergency vehicle preemption OPTICOM at the interchange location. The State will continue to maintain Arlington Heights Road at that location. Agenda for VB Meeting4p-28-93 • -3- (The Village will be able to review and approve the interchange improvement plans. The Village is responsible for all costs related to relocating Village utilities within construction boundaries. (The $6,900 will be used to pay for the construction of the OPTICOM system. (A report from the Director of Engineering and Community Development recommending approval is attached. ) (E) Consideration to adopt RESOLUTION NO. 53-93 (attached) rescinding Resolution NO. 23-82 and authorizing the Village President to execute the Continental Cable Group amended agreement . (The amended agreement makes several minor changes to the current agreement . First, it renames the Warner Regional Cable Group to the Continental Cable Group. The group monitors the operation and activities of Cable Communications. This group also coordinates all aspects of cable television franchises of its member communities. In addition, the agreement specifies that the chairperson of the group shall be the representative of the host community. This represents current practice. The former agreement had the chairperson elected from the membership of the Group. (Member communities include Buffalo Grove, Hoffman Estates, Palatine, Rolling Meadows, and Elk Grove. The group has been in existence since 1982 . All the member communities have been asked to adopt the revised agreement . (F) Consideration to adopt RESOLUTION NO. 54-93 (attached) to provide for the regulation of basic service tier rates and related equipment, installation and service charges of any cable television system operating in the Village of Elk Grove Village. (The resolution authorizes the Village Manager to execute the FCC form certifying the . Village as a Franchising Authority to regulate basic cable rates. (All member municipalities of the Continental Cable Group are in the process of becoming certified. (The effective date of the certification is 30 days after submitting the form to the FCC. (This item was discussed at the 9-21 -93 Committee of the Whole Meeting. ) G) Consideration to adopt ORDINANCE NO. 2322 (attached) establishing additional compensation for Police Sergeants attending court on off-duty days. (The ordinance provides Police Sergeants an additional $100 in compensation per day when attending court on off-duty days. Agenda for VB Meetingf-28-93 • -4- (The ordinance will be distributed on Friday, September 24 . ) H) Consideration to adopt ORDINANCE NO. 2323 (attached) amending Title 6, Section 6-3-6-6 of the Village Code pertaining to parking facilities for the handicapped (increase in fine from $50. 00 to $100. 00) . (The ordinance increases the fine of parking in a handicap parking stall from $50. 00 to $100. 00. The effective date of the ordinance is January 1 , 1994 . (This item was discussed at the 9-21 -93 Committee of the Whole meeting. Agenda for VB Meeting28-93 • -5- BOARDS AND COMMISSIONS 7. CAPITAL IMPROVEMENTS COMMITTEE- Trustee Tosto a . Capital Projects (Elevated Storage Tank) 8 . JUDICIARY PLANNING AND ZONING COMMITTEE - Trustee Czarnik a . Regulation of the Sale of Guns, Ammunition & Alcohol b. Parental Responsibility Ordinance C. In-Home Day Care Center Ordinance Amendment 9 . PERSONNEL COMMITTEE- Trustee Petri a . Americans with Disabilities Act Issues 10. RECYCLING COMMITTEE- Trustee Chernick a. Industrial & Commercial Recycling 11 . PLAN COMMISSION - Village Manager Parrin a . Spruce Meadow Subdivision 12 . ZONING BOARD OF APPEALS- Village Manager Parrin a . 1554 Patricia Court - Variation to locate a swimming pool five (5) feet from the side lot line (P.H. 9-13-93) Docket 93-7 b. Sanfilippo & Son, Inc. - Variation to yard requirements of multiple lots for a construction addition to an existing building (P.H. 9-13-93) Docket 93-8 13 . REPORTS OF OTHER BOARDS COMMISSIONS & COMMITTEES a . Cable Television Committee - Trustee Rettberg b. O 'Hare Advisory Committee/Suburban O 'Hare Commission President Gallitano C. Community Service Board-Trustee Nancy Czarnik d. Illinois International Convention Center - President Gallitano e . NWMC Transportation Committee - Trustee Tosto/ Alan Boffice-Director of Engineering & Community Development 14 . ORDINANCES, RESOLUTIONS AND COMMUNICATIONS 15 . UNFINISHED BUSINESS A. Pending Action by Village Board 1 : At the 9114193 VB meeting an ordinance amending Day Care Centers was referred to the JPZ Committee for review. The ordinance amends Title 3, Chapter 8, Article A, Day Care Centers and Homes, of the Village Code of the Village of Elk Grove Village as it pertains to maximum number and age of children in day care homes. B. Pending Action by others: C. Pending Action by Village Attorney: Agenga for VB Meeting-28-93 • -6- 16. REPORT FROM VILLAGE MANAGER 17. NEW BUSINESS 18. ADJOURNMENT In compliance with the Americans with Disabilities Act and other applicable Federal and State laws, the meeting will be accessible to individuals with disabilities. Persons requiring auxiliary aids and/or services should contact the Village Clerk, preferably no later than five days before the meeting. c: Gallitano (2) , Chernick, Czarnik, Johnson, Petri, Rettberg Tosto, Parrin, Boffice, Cech, Ingebrigtsen, Engelbrecht, MacArthur, Knickerbocker, Rummel, Farrell, Smith (2) . Ik ADDENDUM to Regular Village Board Agenda September 28, 1993 6. CONSENT AGENDA (continued) 2ESz1 I) Consideration to award a contract to Triton Consulting Engineers, LTG. , Schaumburg, IL to perform consulting engineering services for the JFK/Elk Grove Boulevard Roadway Improvement, leveling of the median along Elk Grove Boulevard from Arlington Heights Road to Rev. Morrison Boulevard and modernization of the traffic signal at Elk ,Grove Boulevard and Arlington Heights Road at a cost not to exceed $58,941 . (The proposal includes consulting engineering services ,for the widening and resurfacing o (In addition, Triton will perform engineering services on related projects to the Boulevard widening. First, the provision of engineering services for the leveling of the median along Elk Grove Boulevard from Arlington Heights Road to Reverend Morrison Boulevard. The cost for this service is $2,011 . This work will be performed when studying the installation of the storm sewer line. Second is the engineering services for the modernization of traffic signals at the intersection of Elk Grove . Boulevard and Arlington Heights Road. The cost for this service is $4,498. As other traffic signals in the area (i .e. Cosman Road and Arlington Heights Road) are being modernized at a cost split of 113 Village funds and 2/3 County contributions, now is the time to study this intersection as well . (In addition, Triton will perform engineering services on related projects to the Boulevard widening. First, the provision of engineering services for the leveling of the median along Elk Grove Boulevard from Arlington Heights Road to Reverend Morrison Boulevard.' The cost for this service is .$2,011 . This work will be . performed when studying. the installation of the storm sewer line. Second is the engineering services for the modernization of traffic signals at the intersection of Elk Grove Boulevard and Arlington Heights Road. The cost for this service is $4,498. As other traffic signals in the area (i .e. Cosman Road and Arlington Heights road) are being modernized at a cost split of 1 /3 Village funds and 2/3 County contributions, now is the time to study this intersection as well . (Triton has demonstrated exceptional performance on past projects for the Village. (A report from the Director of Engineering and Community Development is attached. ) in compliance with the Americans with disabilities Act and oLher applicable Pederal and SL-aLe laws, the meeting will be accessible to .individuals with disabilities . Persons requiring auxiliary aids and/or services should contact the Village Clerk, preferably no later than five days before the meeting. c: Gallitano (2) , Chernick, Czarnik, Johnson, Petri, Rettberg Tosto, Parrin, Boffice, Cech, Ingebrigtsen, Engelbrecht, MacArthur, Knickerbocker, Rummel , Farrell , Smith (2) lk