Loading...
HomeMy WebLinkAboutRESOLUTION - 28-20 - 4/14/2020 - Agreement-Cook County and Elk Grove Village for Touhy Avenue Intersection Improvement ProjectRESOLUTION NO.28-20 A RESOLUTION AUTHORIZING THE MAYOR AND VILLAGE CLERK TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE COUNTY OF COOK AND THE VILLAGE OF ELK GROVE VILLAGE FOR THE TOUHY AVENUE INTERSECTION IMPROVEMENT PROJECT - ELMHURST ROAD TO MOUNT PROSPECT ROAD (SECTION 15-34117-01-RP) NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois as follows: Section 1: That the Mayor be and is hereby authorized to sign the attached document marked: INTERGOVERNMENTAL AGREEMENT BETWEEN THE COUNTY OF COOK AND THE VILLAGE OF ELK GROVE VILLAGE a copy of which is attached hereto and made a part hereof as if fully set forth and the Village Clerk is authorized to attest said document upon the signature of the Mayor. Section 2: That this Resolution shall be in full force and effect from and after its passage and approval according to law. VOTE: AYES: 6 NAYS: 0 ABSENT: 0 PASSED this 1411 day of April 2020. APPROVED this 14th day of April 2020. APPROVED: Mayor Craig B. Johnson Village of Elk Grove Village ATTEST: Loretta M. Murphy, Village Clerk INTERGOVERNMENTAL AGREEMENT THE COUNTY OF COOK TOUHY AVENUE Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP VILLAGE OF ELK GROVE VILLAGE Federal Project No. 6CYP(041) This Intergovernmental Agreement (the "Agreement") is made and entered into by and between the County of Cook, a body politic and corporate of the State of Illinois (the "County"), and the Village of Elk Grove Village, a municipal corporation of the State of Illinois (the "Village"). The County and the Village are sometimes individually referred to as "Party" and collectively referred to as the "Parties." RECITALS WHEREAS, the Constitution of the State of Illinois (the "State"), 1970, Article VII, Section 10, authorizes units of local government to contract or otherwise associate among themselves in any manner not prohibited by law or ordinance; and WHEREAS, the provisions of the Intergovernmental Cooperation Act, (5 ILCS 220/1 et seq.), authorizes and encourages intergovernmental cooperation; and WHEREAS, the County and the Village are units of government within the meaning of the Constitution of the State of Illinois, 1970, Article VII, Section 10, having the power and authority to enter into an intergovernmental agreement; and WHEREAS, the Illinois State Toll Highway Authority (Illinois Tollway) in order to facilitate the free flow of traffic and ensure safety to the motoring public, intends to improve the Elgin O'Hare Expressway, extending the expressway from its eastern terminus at Rohlwing Road (Illinois Route 53) to O'Hare International Airport (ORD) to be known in its entirety as Illinois Route 390, and constructing the Western Access connecting the Jane Addams Memorial Tollway (I-90) with the Tri-State Tollway (I-294) (hereinafter sometimes referred to as the Elgin O'Hare Western Access "EOWA"); and WHEREAS, the EOWA will necessitate improvements along Touhy Avenue (IL 72) from Elmhurst Road to Mount Prospect Road; and WHEREAS, the Illinois Department of Transportation (State) has jurisdictional authority over Touhy Avenue (IL 72) and has authorized the County to assume design and construction responsibilities of the EOWA improvements along Touhy Avenue, which includes the intersections of Touhy Avenue at Elmhurst Road, Touhy Avenue over the Western Access, Touhy Avenue over the Union Pacific Railroad, and Touhy Avenue at Mount Prospect Road; and WHEREAS, the Village owns facilities within State right-of-way, said facilities were installed by permit and subject to the terms and conditions of the State permit for occupation within said right-of-way; and WHEREAS, the County has undertaken design of improvements along Touhy Avenue and Elmhurst Road, to be identified as Section: 15-34117-01-RP (hereinafter referred to as the "Project"); and WHEREAS, the Project improvements to be built by the County are described as follows: INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) The scope of work for the Touhy Avenue at Elmhurst Road intersection improvements includes construction of a new quadrant bypass connector roadway from Old Higgins Road to Touhy Avenue. This section also includes the installation and interconnection of traffic signals at Touhy Avenue and the Old Higgins Road connector, at Touhy Avenue and Elmhurst Road, and at Elmhurst Road and Old Higgins Road/Estes Avenue. The scope of work for Touhy Avenue over the EOWA includes the construction of a new grade separation structure carrying Touhy Avenue over the EOWA. The scope of work for Touhy Avenue over the Union Pacific Railroad (UPRR) consists of the construction of a new grade separation structure carrying Touhy Avenue over the UPRR, as well as arterial improvements which include the relocation and realignment of Mount Prospect Road from Higgins Creek to the UPRR along with installation of a new traffic signal at Touhy Avenue. The Project also includes the installation of drainage improvements, pavement markings, signing, roadway lighting, multi -use paths, sidewalk, landscaping, retaining walls and all other work necessary to complete the improvements in accordance with the approved construction plans and specifications; and WHEREAS, the Village has requested that the County include in its Project the installation of new Emergency Vehicle Pre-Emption Device (EVPD) Systems on all signals within the Village limits of the Project, and at the intersection of Touhy Avenue and realigned Old Higgins Road, new LED street name signs at all signalized intersections within the Village limits of the Project, water main installation and/or replacement, decorative street lighting and landscaped medians with water service line for future irrigation systems east of Elmhurst Road (the "Village Work"); and WHEREAS, the County and the Village, by this instrument, desire to memorialize their respective obligations and responsibilities toward engineering, construction and funding of the Project as well as future maintenance responsibilities of the completed Project; and NOW THEREFORE, in consideration of the promises, covenants, terms and conditions set forth in this Agreement, the Parties hereto agree as follows: SECTION 1. INCORPORATION OF RECITALS The above recitals are incorporated into this Agreement as if fully set forth herein. SECTION 2. TERM AND TERMINATION This Agreement between the County and the Village shall not become effective unless authorized by the Cook County Board of Commissioners and executed by the Cook County Board President and an authorized representative of the Village. This Agreement is a legal, valid and binding agreement, enforceable against the Village and, once duly authorized and executed by the Cook County Board of Commissioners, against the County, in accordance with its terms. This Agreement shall terminate upon completion of the Project. Further, in the event that any portion of the Federal CMAQ Funding becomes unavailable, this Agreement may be subject to amendment or termination by written instrument signed by both Parties. Notwithstanding the foregoing, the Parties hereto agree that the provisions of Subsections 5.9 Maintenance Agreement, 5.11 Post - Project Maintenance and 5.13 Payment to the County herein shall survive termination of this Agreement, unless expressly terminated by the Parties. Page 2 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) This Agreement and the covenants contained herein shall become null and void in the event that a contract covering the construction work contemplated herein is not awarded within three (3) years subsequent to the date of execution of this Agreement by the County. SECTION 3. PROJECT FUNDS 3.1 Federal Funds. Federal Funding in the amount of Eleven Million Four Hundred Fifty Thousand Dollars ($11,450,000.00) Congestion Mitigation Air Quality (CMAQ) funds for the Touhy Avenue at Elmhurst Road intersection improvements and Twenty -Three Million Two Hundred Eighty -Nine Thousand Dollars ($23,289,000.00) Congestion Mitigation Air Quality (CMAQ) funds for the Touhy Avenue over the UPRR improvements totaling a maximum amount of Thirty -Four Million Seven Hundred Thirty -Nine Thousand Dollars ($34,739,000.00) will be applied toward the eligible portions of the Project construction and utility relocation costs as described herein. 3.2 County's Share of the Project. The County shall finance the entire cost of the Project subject to reimbursement as herein stipulated. For the purposes of this Agreement, the County's share shall include funding from other agencies as described in separate agreements. The County's share of the Project shall be equal to the actual cost for design engineering, construction, construction engineering and utility relocations for the Touhy Avenue at Elmhurst Road intersection improvements (including Village water main and sanitary sewer) and the Touhy Avenue over the UPRR portions of the Project less the Federal Share of construction and utility relocation costs for the respective portions of the Project and less the Village's share of the Project. The County's total cost for the Project is estimated as Forty -Seven Million Five Hundred Sixty -Five Thousand Eight Hundred Forty -Nine Dollars ($47,565,849.00). 3.3 Village's Share of the Project. The Village's share of the Project shall be equal to the actual cost of the Village Work as listed hereinbefore; plus one hundred (100%) percent of the costs for street lighting within the Village limits of the Project; plus fifty (50%) percent of the costs for new sidewalk and multi -use path; less fifty (50%) percent of the costs for deteriorated sidewalk replacement at locations not impacted by construction; less one hundred (100%) percent of the costs for the landscaped median (excluding water service line); and, including design and construction engineering as a fraction of the total Village cost as described in Subsection 4.4 of this Agreement. The Village's total cost for the Project is estimated as One Million Six Hundred Fifty -Six Thousand Two Hundred Ninety -One Dollars ($1,656,291.00). 3.4 Cost Estimates. A Cost Breakdown for the Village's Share of the Project is incorporated and attached hereto as Exhibit A. The Cost Breakdown is only an estimate and does not limit the financial obligations of the Parties as described in 3.1 through 3.3 above. SECTION 4. COUNTY' S RESPONSIBILITIES 4.1 Design Engineering. The County shall design, prepare construction plans, specifications, estimates and contract documents for the Project, including the new EVPD systems. 4.1.1 The County shall incorporate the Village Work into the Project design plans and specifications using Village standards; and, said design plans shall be approved by both the Village and the County. The cost for said work shall be reimbursed to the County by the Village. Page 3 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34 l 17-01-RP Federal Project No. 6CYP(041) 4.1.2 The County shall utilize a full -depth Portland Cement Concrete pavement design provided by the Village for the segment of Estes Avenue to be reconstructed as part of the Project. 4.1.3 The County shall define land acquisition needs for temporary and permanent easements for the Project, including any displacements and/or relocations required for construction, and provide same to the Illinois Tollway for further processing. 4.1.4 The County shall be responsible for ensuring that all permits necessary for the Project are secured, including regulatory and railroad permits. 4.2 Construction. 4.2.1 The County shall advertise and receive bids, let, award, and cause the Project to be built in accordance with the approved Project construction plans, specifications and construction contract. 4.2.2 Subsequent to the award of the construction contract, and before any work is started on the Project, a pre -construction conference shall be held between the State, the Illinois Tollway, the County, the interested contractor(s), the UPRR, the Village of Elk Grove Village, the City of Chicago, the City of Des Plaines and the affected utility agencies, at a time and place as designated by the County's representative, for the purpose of coordinating the work to be performed by the several contingents, and at which time a schedule of operations will be adopted. 4.2.3 The County shall coordinate localized public notification of driveway and side street closures, and detour plans with residents, schools, businesses and emergency services. 4.3 County as Lead Agent; ppropriation of Funds. The County shall finance the design engineering, construction and construction engineering and act as Lead Agent for the Project as authorized by the State of Illinois. 4.4 Village Infrastructure. 4.4.1 Any and all Village infrastructure improvements on State routes are subject to approval by the State. 4.4.2 The County shall replace or relocate existing sidewalk which interferes with construction, at its sole expense. 4.4.3 The County shall remove and replace deteriorated sidewalk as part of the Project, at locations not impacted by construction and identified by the Village, and the cost of said sidewalk shall be shared as 50% Village and 50% County. Costs shall include sidewalk, subbase granular material, protective coat, detectable warnings and sidewalk removal. 4.4.4 The County shall install new bicycle and pedestrian facilities as part of the Project, including multi -use paths and new sidewalk along Elmhurst Road (south of Touhy Avenue) and along Touhy Avenue within the Village limits, and the cost of said facilities shall be shared as 50% Village and 50% County. The locations of said multi -use paths and sidewalk are delineated on the attached Exhibit B. Page 4 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) 4.4.5 The County shall submit a written request and obtain approval from the Village prior to making minor adjustments to existing Village utilities, including water main, sanitary sewers, structure adjustments and fire hydrants which interfere with construction, at its sole expense. 4.4.6 The County shall design and install new water main and/or replace existing water main at locations requested by the Village. The cost for design and construction of said water main shall be at the Village's sole expense. The locations of said water main are delineated on the attached Exhibit B. 4.4.7 The County shall install a landscaped median with seeding (approved by the State) along Touhy Avenue from Elmhurst Road to Old Higgins Road. A water service line shall be provided to the median for future irrigation by the Village, at the Village's expense. The County share of said costs shall not exceed the cost of installing an equivalent concrete median and the Village shall be responsible for any landscaped median costs in excess of said County share, greater than 5% margin of error. 4.4.8 The County shall install new LED street name signs at all signalized intersections which are being upgraded within the Village limits of the Project. Said intersections shall include Touhy Avenue/Higgins Road at Elmhurst Road, Elmhurst Road at Old Higgins Road/Estes Avenue, and Elmhurst Road at Greenleaf Avenue. The cost for said signs shall be at the Village's sole expense. 4.4.9 The County shall install new Emergency Vehicle Pre-Emption Device (EVPD) Systems at four (4) intersections within the Project limits that are served by the Elk Grove Fire Department, at the Village's sole expense, unless said equipment has been upgraded prior to construction. Said locations shall include Touhy Avenue/Higgins Road at Elmhurst Road, Touhy Avenue at Old Higgins Road, Elmhurst Road at Old Higgins Road/Estes Avenue and Elmhurst Road at Greenleaf Avenue. 4.4.10 The County shall design and construct a Portland Cement Concrete (PCC) retaining wall along the west side of Elmhurst Road between Greenleaf Avenue and Estes Avenue. The location of the wall is delineated on the attached Exhibit B. The wall will be designed per Village approval of size, location, railing, decorative form liner and other appurtenances. The cost of construction of the wall shall be at the sole expense of the County. 4.4.11 The County shall provide the Village fourteen (14) days' advance notice for access closures involving any residential driveways, side streets and business entrances. 4.4.12 The County shall allow the Village to observe all construction of Village infrastructure installed as part of the Project, address concerns expressed by the Village regarding said construction, and allow the Village to participate in the Final Inspection of said Village infrastructure. 4.5 Tree Replacement. Any tree plantings to be included as part of the Project shall be determined in accordance with the Illinois Tollway's EOWA tree replacement policy and coordinated with the Village. Any specific tree plantings or other new aesthetic improvements that may be requested by the Village will be subject to the EOWA accounting. Accordingly, all tree removals will be accounted for, but will not necessarily be replaced within the same Project limits from which they were removed. Page 5 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) The costs for any tree removal included as part of the Project shall be at the County's expense and the costs for tree replacement shall be apportioned between the County and the Illinois Tollway. 4.6 Street Lighting. The County shall install new decorative street lighting along Touhy Avenue from the west Project limit to a point approximately 600 feet east of Elmhurst Road where the State lighting begins; along Old Higgins Road from Elmhurst Road to Carmen Drive where the State lighting begins; and, along Elmhurst Road from Greenleaf Avenue to Landmeier Road as part of the Project. The cost of said lighting shall be at the Village's sole expense as described in Section 5.3.1 herein. The locations of said street lighting are delineated on the attached Exhibit B. 4.7 City of Des Plaines Emergency Water Connection. The County shall install a water service connection to the Elk Grove Village water main, east of Carmen Drive along Old Higgins Road, including vault, meter and valve. Said service will connect the Elk Grove water system to the City of Des Plaines water system along Old Higgins Road. The meter, valve and water line installed as part of this connection will be owned and maintained by the City of Des Plaines and used only as an emergency water supply by the City of Des Plaines in the event that their main water supply to City properties, west of I-490, is interrupted. Terms of water service use and costs to be defined under separate agreement between the Village and the City of Des Plaines. There shall be no Village cost associated with this work. 4.8 Notification of Final Inspection. The County shall provide the Village fourteen (14) days' advance notice of the Final Inspection of all work constructed as part of the Project ("Final Inspection"). SECTION 5. VILLAGE'S OBLIGATIONS 5.1 Time of the Essence. The obligations of the Village as set forth in this Section 5 shall be performed in a timely manner such that it will not result in a delay of the Project timetable as determined by the County. 5.2 Village Plans and Specifications. 5.2.1 The Village shall supply standard details and specifications for the Village Work (water main, water meter vault, retaining wall and median landscaping details) to be included in the Project design plans. The County, with the Village's assistance, shall be responsible for securing any regulatory permits needed for the water main work, street lighting, LED street name signs, etc. including IDOT, IEPA, MWRD, etc. 5.2.2 The Village shall provide GIS infrastructure plans and sanitary lift station plans to the County for coordination with the improvements along Elmhurst Road. 5.3 Village Cost Responsibility 5.3.1 The Village shall be solely responsible for the cost of the new decorative street lighting requested by the Village and installed within the Village limits of the Project along Touhy Avenue, Elmhurst Road and Old Higgins Road. Page 6 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34 l 17-0 l -RP Federal Project No. 6CYP(041) 5.3.2 The Village shall be solely responsible for the cost of the new EVPD Systems at four (4) intersections within the Project limits identified in Section 4.4.9 and LED street name signs installed within the Village limits as part of the Project. 5.3.3 The Village shall be responsible for fifty (50%) percent of the costs for new multi -use path and new sidewalk installed within the Village limits as part of the Project, and deteriorated sidewalk removal and replacement for locations not impacted by construction. 5.3.4 The Village shall be solely responsible for the cost of the water service line, service boxes and connections associated with the landscaped median installed as part of the Project. 5.3.5 The Village shall be responsible for any costs for the landscaped medians in excess of the County share for said costs, greater than 5% margin of error. The County share shall not exceed the cost of a similar concrete median (estimated $152,595) in lieu of topsoil/seeding excluding the costs described in Subsection 5.3.4. 5.3.6 The Village shall be solely responsible for the cost of the new water main installation and/or replacement within the Village limits included as part of the Project. 5.3.7 The Village shall be responsible for design and construction engineering costs associated with the work described in this Section 5.3. It is mutually agreed by the Parties hereto that design engineering costs shall be computed as five (5%) percent of the actual construction costs and that construction engineering shall be computed as ten (10%) percent of the actual construction costs for the Village share of said work. 5.4 Public Notification of Project. The Village will post County notifications of the Project scope, timing and duration through its municipal newsletter, website, etc. 5.5 Village Owned Right -of -Way. The Village shall allow the County reasonable access to the Village owned right-of-way or utility easements for the purposes of constructing the Project, including the use of Village streets for possible detour routing of Estes Avenue traffic during construction of the Project. 5.6 Coordination with the County. 5.6.1 The Village shall have the opportunity to review and approve contractor submittals prior to installation of Village Work items. The Village shall have the opportunity to be involved in construction of the Project, shall assign a representative to coordinate and monitor the Village Work under construction, and bring to the attention of the County's Resident Engineer any matters of concern with respect to same. 5.6.2 Following an inspection of the completed landscaped median by the Village and the County, and acceptance of the median by the Village, the Village shall assume mowing operations for the landscaped median during the interim period between physical construction of the median and Final Acceptance of the Project. 5.7 Additional Work. In the event that the Village requests additional work or changes in the Project scope (excluding changes resulting from unforeseen circumstances or field changes for which the County shall be notified), a written request shall be submitted to the County prior to fifty (50%) percent of the original contract dollars having been expended and providing that said additional work would Page 7 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34 l 17-01-RP Federal Project No. 6CYP(041) not delay implementation of the Project. Any such request shall be subject to County review and approval prior to incorporation into the Project. Further, the Village shall be responsible for one hundred (100%) percent of the additional costs for design engineering, construction and construction engineering associated with said additional work. 5.8 Final Inspection. The Parties shall be present and participate in the Final Inspection, and the scheduling of such Final Inspection shall be solely at the discretion of the County (subject to the provisions of notice as required by Section 4.7 of this Agreement). The Village shall not cause a condition that would unreasonably delay the Final Inspection. The Village shall submit final punch list items within seven (7) days prior to the Final Inspection date as determined by the County. 5.9 Maintenance Agreement. The State shall continue to own, operate and maintain Touhy Avenue (IL 72) from Elmhurst Road to Mount Prospect Road; Elmhurst Road (IL 83) from Greenleaf Avenue to Landmeier Road; and, Old Higgins Road from Elmhurst Road to Touhy Avenue upon completion of the Project. The Village may enter into a separate agreement with the State to establish ownership and maintenance responsibilities for the multi -use paths, sidewalk, EVPD Systems, traffic signals, LED street name signs, street lighting, landscaped median, retaining wall and water main installed or improved along the respective roadways within the Village limits as part of the Project. 5.10 City of Des Plaines Agreement. The Village may enter into a separate agreement with the City of Des Plaines to establish service costs, liability and maintenance responsibilities for the water main connection installed near Old Higgins Road between the City system and the Village system as part of the Project. 5.11 Post-Proiect Maintenance. Following acceptance of the Project after a Final Inspection conducted jointly with the Village and the County, the Village shall: 5.11.1 Continue to own, operate and maintain Estes Avenue, west of Elmhurst Road, as a municipal street upon completion of the Project. 5.11.2 Continue to own, operate and maintain Carmen Drive, south of Old Higgins Road, as a municipal street upon completion of the Project. 5.11.3 Own, operate and maintain the multi -use paths, sidewalk (including detectable warnings), EVPD Systems at four (4) intersections within the Project limits identified in Section 4.4.9, LED street name signs, street lighting and water main installed or improved within the Village limits, as part of the Project. Further, the Village shall be responsible for one hundred (100%) percent of the energy costs for said street lighting. 5.11.4 Maintain the landscaped median and associated water service line installed along Touhy Avenue, from Elmhurst Road to Old Higgins Road, as part of the Project (including the section of landscaped median extending beyond the municipal limits). 5.11.5 Own and maintain the PCC retaining wall constructed along the west side of Elmhurst Road between Greenleaf Avenue and Estes Avenue. 5.1 1.5 Share the Maintenance and Electrical Energy costs with the State for the traffic signals which were improved as part of the Project along Elmhurst Road at Greenleaf Avenue and Elmhurst Road at Estes Avenue as follows: Page 8 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) Elmhurst Road at Greenleaf Avenue — Village Share 50% Maintenance & 100% Energy Elmhurst Road at Estes Avenue — Village Share 25% Maintenance & 25% Energy 5.12 Indemnification. By execution of this Agreement, the Village agrees to defend, indemnify and hold harmless the County and its commissioners, officials, employees, agents and representatives, and their respective heirs, successors and assigns, from and against any and all costs, expenses, attorney's fees, losses, damages and liabilities incurred or suffered directly or indirectly from or attributable to claims arising out of or incident to the construction, use, repair and or maintenance of the sidewalk and multi -use path installed or improved under this Agreement and/or the acts, errors or omissions of the officers, agents, employees, contractors, subcontractors, licensees or invitees of the Parties, excluding any loss or damage caused by any negligence on the part of the County relating to said improvements or existing sidewalk. 5.13 Payment to the County. The costs that the Village is obligated to pay as described in Section 3. Project Funds, shall be paid in four (4) installments as follows: 5.13.1 The first installment (approximately 50% of the Village's total estimated financial obligations for the Project) in the amount of Eight Hundred Twenty -Eight Thousand Dollars ($828,000.00) shall be invoiced by the County within ninety (90) days following the contract award, and the Village shall pay the County within sixty (60) days after receipt of the invoice from the County. 5.13.2 The second installment (approximately 20% of the Village's total estimated financial obligations for the Project) in the amount of Three Hundred Thirty -One Thousand Dollars ($331,000.00) shall be invoiced by the County one (1) year following the contract award, and the Village shall pay the County within sixty (60) days after receipt of the invoice from the County. 5.13.3 The third installment (approximately 20% of the Village's total estimated financial obligations for the Project) in the amount of Three Hundred Thirty -One Thousand Dollars ($331,000.00) shall be invoiced by the County two (2) years following the contract award, and the Village shall pay the County within sixty (60) days after receipt of the invoice from the County. 5.13.4 The fourth installment for the remaining balance of the Village's total financial obligations for the Project, based upon the actual quantities used and the contract unit prices as awarded, shall be invoiced by the County subsequent to completion of the Project, and the Village shall pay the County within sixty (60) days after receipt of the invoice from the County. 5.13.5 Payments to the County shall be by check payable to the Treasurer of Cook County, for deposit into the County's Motor Fuel Tax Fund (600-585 Account) and identified as Section: 15-34117-01-RP. The check shall be delivered to the Superintendent, Cook County Department of Transportation and Highways. SECTION 6. GENERAL PROVISIONS 6.1 Governing Law and Venue. This Agreement shall be interpreted under, and governed by, the laws of the State of Illinois, without regard to conflicts of laws principles. Any claim, suit, action, or proceeding brought in connection with this Agreement shall be in the Circuit Court of Cook County and each Party hereby irrevocably consents to the personal and subject matter jurisdiction of such court and waives any claim that such court does not constitute a convenient and appropriate venue for such claims, suits, actions, or proceedings. Page 9 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) 6.2 Default. The Village shall be in default hereunder in the event of a material breach by the Village of any term or condition of this Agreement including, but not limited to, a representation or warranty, where the Village has failed to cure such breach within thirty (30) days after written notice of breach is given to Village by the County, setting forth the nature of such breach. Failure of County to give written notice of breach to the Village shall not be deemed to be a waiver of the County's right to assert such breach at a later time. Upon default by the Village, the County shall be entitled to exercise all available remedies at law and in equity, including but not limited to termination of this Agreement upon thirty (30) days' notice to the Village. The County shall be in default hereunder in the event of a material breach by the County of any term or condition of this Agreement including, but not limited to, a representation or warranty, where the County has failed to cure such breach within thirty (30) days after written notice of breach is given to the County by the Village, setting forth the nature of such breach. Failure of Village to give written notice of breach to the County shall not be deemed to be a waiver of the Village's right to assert such breach at a later time. Upon default by the County, the Village shall be entitled to exercise all available remedies at law and in equity, including but not limited to termination of this Agreement upon thirty (30) days' notice to the County. 6.3 Modification. This Agreement may not be altered, modified or amended except by a written instrument signed by both Parties. Provided, however, the Parties agree that provisions required to be inserted in this Agreement by laws, ordinances, rules, regulations or executive orders are deemed inserted whether or not they appear in this Agreement and that in no event will the failure to insert such provisions prevent the enforcement of this Agreement. 6.4 Binding Successors. The County and the Village agree that their respective successors and assigns shall be bound by the terms of this Agreement. 6.5 Force Maieure. Neither the County nor the Village shall be liable for failing to fulfill any obligation under this Agreement to the extent any such failure is caused by any event beyond such Party's control and which event is not caused by such Party's fault or negligence. Such events shall include but not be limited to acts of God, acts of war, fires, lightning, floods, epidemics or riots. 6.6 Notices. Unless otherwise specified, any notice, demand or request required under this Agreement must be given in writing at the addresses set forth below by any of the following means: personal service, overnight courier or first class mail. TO THE COUNTY: Mr. John Yonan, P.E. Superintendent Cook County Department of Transportation and Highways 69 West Washington, 241h Floor Chicago, IL 60602 312-603-1600 TO ELK GROVE VILLAGE: Page 10 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(04I ) Mr. Raymond R. Rummel Village Manager Village of Elk Grove Village 901 Wellington Avenue Elk Grove Village, IL 60007 847-439-3900 6.7 Insurance. The County shall require that the Village, their agents, officers and employees be included as additional insured parties in the General Liability Insurance that the County requires of its contractor(s) and that the Village will be added as an additional protected Party on all performance bonds required of the contractor(s). These requirements shall be included in the Special Provisions of the construction contract(s). 6.8 Section Headings. The descriptive headings of various sections of this Agreement are for convenience only and shall not control or affect the meaning or construction of any of the provisions hereof. 6.9 Entire Agreement. This Agreement constitutes the entire agreement between the County and the Village, merges all discussion between them and supersedes and replaces any and every other prior or contemporaneous agreement, negotiation, understanding, commitments and writing with respect to such subject matter hereof. This Agreement may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which shall be deemed one and the same instrument. THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK Page 11 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(04I ) IN WITNESS WHEREOF, the County and the Village have caused this Agreement to be executed by their respective officials on the dates as shown. EXECUTED BY COUNTY: Toni Preckwinkle President Cook County Board of Commissioners This _ day of A.D. 2019 ATTEST: County Clerk (SEAL) RECOMMENDED BY: John Yonan, P.E. Superintendent County of Cook Department of Transportation and Highways EXECUTED BY VILLAGE OF ELK GROVE VILLAGE: Craig B. Johnson Mayor This day of A.D. 2019. ATTEST: Village Clerk (SEAL) APPROVED AS TO FORM: Kimberly M. Foxx, State's Attorney Assistant State's Attorney Page 12 of 13 INTERGOVERNMENTAL AGREEMENT Touhy Avenue — Elmhurst Road to Mount Prospect Road Section: 15-34117-01-RP Federal Project No. 6CYP(041) EXHIBIT A: SUMMARY TABLE TOUHY AVENUE - ELK GROVE VILLAGE COST BREAKDOWN ITEM SUBTOTAL ELK GROVE VILLAGE COOK COUNTY TOTAL TOTAL Sidewalk $ 117,338 $ 312,163 Multi -Use Path $ 65,017 $ 65,017 Street Lighting $ 691,017 $ - EVPD System $ 33,007 $ LED Street Name Signs $ 18,000 $ - Landscaped Median $ 17,500 $ 92,320 Water Main $ 498,374 $ - Retaining Wall $ $ 194,838 $1,440,253 $ 664,338 DESIGN ENGINEERING (5% of total construction cost of listed items) $ 72,013 $ - CONSTRUCTION ENGINEERING (10% of total construction cost of listed items) $ 144,025 $ - MOO,$1,656,291 9011 e��.+n c`R t' $ 664,338 PROJECT COSTS THAT DO NOT AFFECT VILLAGE $ 46,901,5111 $ 47,565,849 FEDERAL CMAQ FUNDING FOR PROJECT $ 34,739,000 VILLAGE COST SHARE MOVED OVER $ 1,656,291 ,. 1W $ 83,961,140 1. The County share of the Project is partially subject to reimbursement from other partner agencies through separate agreements for the Project. 2. The County share of the Landscaped Median shall not exceed the cost of a similar concrete median (estimated $152,595). The Village shall be responsible for any costs exceeding the County share, greater than a 5% margin of error, excluding the water service installation costs. Page 13 of 13 i ■ i i i �•• ` • ■ � ■ 7OUHygVE ' �••r 00 • ( / ." ESTES AVE • n ® [[t 44 [ C_5 PLADY3, a Co1MrY wWun — ,. E<x arovl vauaT. a aucu'g00u 4[w uacrca a Inca vn �[y[ CI[I [Tl-[i00 M.UE TOMf4P FLA qP/E TO�IQUP YFLTIM r � s� ■ • x Y "l Y� luj, Ow r ELK GROVE VILLAGE 717 COUNTY OF COOK DEPAR"IM1IEN"1 OF I R ANSPOR'I A IION AND HH:H WAV S , UATE� LIA! O a CDP - CITY OF DES PLAINES EGV - ELK GROVE VILLAGE LEGEND •••••••• CDP WATER MAIN NNHHH� CHICAGO MULTI -USE PATH nuuuuunEEEEI CHICAGO SIDEWALK IDOT LIGHTING ►•►•►••► EGV WATER MAIN --------= EGV MULTI -USE PATH n EGV SIDEWALK ..tnmusu, EGV LIGHTING EGV RETAINING WALL �k EGV EMERGENCY PREEMPTION TOUHY AVENUE - EUMURST ROAD TO MOUNT PROSPECT ROAD EXHIBIT 8 ELK GROVE VILLAGE