HomeMy WebLinkAboutRESOLUTION - 56-20 - 7/7/2020 - Maintenance Bond for Technology ParkRESOLUTION NO.56-20 A RESOLUTION ACCEPTING A DEED OF CONVEYANCE / BILL OF SALE OF MAINTENANCE BOND NO. PB 01741900032, IN THE AMOUNT OF $262,012.70, EXPIRING JUNE 16, 2022, GUARANTEEING THE MAINTENANCE OF THE PUBLIC IMPROVEMENTS FOR THE ELK GROVE TECHNOLOGY PARK SUBDIVISION NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, State of Illinois as follows: Section 1: That the Mayor and Board of Trustees do hereby accept a Deed of Conveyance / Bill of Sale for public improvements as described in the Mass Grading and Infrastructure Improvement Plans for the Elk Grove Technology Park prepared by Spaceco, Inc. Section 2: That the Village of Elk Grove Village shall accept the original cash maintenance bond of $262,012.70, which guarantees the public improvements of watermain, storm sewer, sanitary sewer, and roadway pavement for a period of two (2) years or June 16, 2022. Section 3: That this Resolution shall be in full force and effect from and after its passage and approval according to law. VOTE: AYES: 5 NAYS: 0 ABSENT: 1 PASSED this 7" day of July 2020. APPROVED this 7ch day of July 2020. APPROVED: Mayor Craig B. Johnson Village of Elk Grove Village ATTEST: Loretta M. Murphy, Village Clerk 1. 2. 3. 4. a Lei 26 7 7 P80CEDURE FOR ACOEPTANCE/CONVEYANCE -V Developer submits one (1) set of blVeline record drawings (as-builts). - /t-fmatt-) INSf-AL:xr -t.. 'bb-*/ ro" (" S The Village uses the recorb drawings to prepare' a punch list. Punch list work is completed by developer/contractor. Following satisfactory completion of punch list work the developer must submit the following to the Village: A. One (1) set of mylar record drawings (as-builts). A ri 't 1 1 4 G 1( 0 —:u B. Two (2) sets of blueline rec6rd drawings (as-bui s). C. Completed Acceptanc Conveyyya�n.�c/e Documents%(_attached). D. Two-year alntenance uarantee* < Cyr � � S of all required items the Acceptance/Conveyance documents and he Upon receipt q , Maintenance Guarantee will be submitted to the Village Board for their review and consideration. - 14A 51.'l Upon approval by the Village Board, the original Letter of Credit can be released. 1>r �l. ► i s 'A,-. A !a T AXi, t i,` iJ "*The maintenance Guarantee can be a Bond, b��� • The amount shall be 10% of the cost of public improvements 6190 igkSgjaW• The guarantee shall be for a period of not less than two (2) years, but �+ r the months of May, June, July, August, September or October. j.r CERTIFICATE OF APPROVAL AND INITIAL ACCEPTANCE SUBDIVISION: te-X!. (Project Name/PFfise...... etc.) Request is hereby made by-h '�°`'S' `�` L�t to the Village of Elk Grove Village to approve the subdivision/project described above. The following information is submitted in support of this request: of Conveyanco/BIII of Sale - �� c�`f' "7 �+��'1ao41�• ( t*l' Hs -Built Engineering Drawings (3-print sets/1 mylar set) ( *Bill of Materials (material type, quantities and cost) _ ( Maintenance Guarantee (Bond, 1 -� OWNER(S)/DEVELOPER(S):1(� ADDRESS: + s���A .t-! 7 TELEPHONE: �-- I- '7 —6F)00 REFERENCE: *Plan No. Sheets �, Dated & specifications. P repa red by�Lc e«� on f <�ts� t Ems and approved by the Village of Elk Grove Village. s zo — 9 a • jf�/� ��sls < �7�+�: r ../� � .� LJ continued.... 'st 1 1ti f 16 (4-1 Watermain and Appurtenances (,,O� Sanitary Sewer and Appurtenances ( ) 9hW-- ( y� Storm Sewer and Appurtenances ( ) —P940111!& &4" ( Roadway (Curb and Gutter) ( ) (, Roadway (Markings) ( ) CERTIFICATIONS: DESIGN ENGINEER'S CERTIFICATION To the best of my knowledge and belief, the construction of the above described improvement has been completed in accordance with the referenced approved plans and specifications. /?(J 7 0 Z-ys3t`� g (Date) (II. P.E. No.) DEVELOPER/OWNER CERT1EKATION FIELD INSPECTORS CERTIFICATION I hereby certify that I (we) have regularly inspected the above described improvements during the progress of construction and that to the best of my/our knowledge and belief the work has been com nformance with the approved plans and specifications. TrIAxrea T (Title u.�_ DEED OF CONVEYANCE%BILL OF SALE KNOW ALL MEN BY THESE PRESENTS, THAT LLc (the "Developer"), located at 1qsb' Sc... Gm- f$ a authorized to do business in the State of Illinois, for and in consideration of the sum of One Dollar ($1.00) and other good and valuable consideration in hand paid, the receipt and sufficiency of which are hereby acknowledged, does hereby Grant, Sell, Transfer over, Convey and Deliver unto the Village of Elk Grove Village (the "Village"), Cook and DuPage Counties, Illinois, a municipal corporation, to and for its�.e�t own use forever the following: '- 0- -tv � >Ikk- -rr +-lgaLs �►rr AAZi ini r UNDERGROUND IMPROVEMENTS Watermain and Appurtenances Sanitary Sewer and Appurtenances VxStorm Sewer and Appurtenances Roadways (Curb & Gutter/Pavemerr 8-' wR n— _&L. Traffic Control/Street Signs s Y��«S i�. �•�. (� ii-�1S ice. �'�tr=,s^�'t l�Ud.� 1 At- 'J-.� I a�_ 15t. located in the Project known as C�� lTfzA (the "Project") as described on the "as -built" engineering plans prepared by S located at _l �7s � ��' S c and dated f r f , which pl its with "Bill of Mat als" are incorporate r &f,- � '1'0 reference and made a part hereof, WHEREAS, the Developer does hereby warrant to the Village, it is the lawful owner of and has good and marketable title to the aforedescribed improvements; that the same are free from all encumbrances; that the Developer has the right to Sell the same; and that the Developer warrants and will defend and hold harmless the Village against the lawful claims and demands of all persons with respect to the title hereby conveyed; and that the execution of this Bill of Sale/Deed of Conveyance is an authorized Act of Said Corporation, Individual or Partnership. IN WITNESS WHEREOF, the DevqWer has caused this instrument to be signed and delivered this day of 0 s Io "RX0 �� 1 CORPORATE �� � 6/5/2020 , SEAL � N �� (NAME) (DATE) k Manager (TITLE) ATTEST: OTARY Official Seal D Fagg st r xr C ,c�-1 k fhfo Ios 12Z:� Public State of Illinois (NAM (DATE) DF ELGPER(S)iO'VVNEni VILLAGE INSPECTOR --1 - S- A� 7 „,n.. (DATE) 2-0 AT ASSISTANT VILLAGE ENGINEER: CERTIFICATION All work required for this development has been inspected and found to be completed in a satisfactory manner. All documentation for acceptance has been submitted and found to be acceptable. � *� 0 APPROVAL AND ACCEPTANCE OF GOVERNING AUTHORITY The VILLAGE OF ELK GROVE VILLAGE does hereby approve and accept for maintenance and operation the above described improvement. It is understood that the guarantee period of 24 months shall commence as of the date of Village Board acceptance. It is also understood that this approval and acceptance covers only the specific work indicated above and is subject to a final punch list being made concerning adjustment, alignment and necessary repairs of all structures, boxes, hydrants, etc. Acceptance of maintenance by the Village does not relieve the developer from the responsibility of keeping all dirt and debris due to construction operations out of both storm and sanitary sewer systems. Final acceptance of the subdivision or other general development is conditional upon completing all indicated items on the final punch list. It is the responsibility of the owner or developer to request the final punch list to be made. cz No refund of maintenance escrow monies will be made until all items in the final punch list have been corrected. VILLAGE OF ELK GROVE VILLAGE BY: (DATE) hub il INFRASTRUCTURE PUBLIC IMPROVEMENTS FOR THE BILL OF MATERIALS • OF THE ELK GROVE TECHNOLOGY PARK (LAND SURVEYQRS PROJECT: Mass Grading and Infrastructure Improvement Plans for The Elk Grove Technology Park LOCATION: ELK GROVE VILLAGE, ILLINOIS PROJECT NO.: 6953.04 CLIENT: GB ELK GROVE 1, LLC c/o Brennan Investment Group, LLC DATE PREPARED: 4/26/2018 LAST REVISED: 6/5/2020 PREPARED BY: WB CHECKED BY: BCR GROUP MANAGER: (HAND WRITTEN INITIALS) THE PRICES USED IN THIS LIST ARE BASED ON THE AVERAGE PRICES FROM CONTRACTOR'S BID PRICES REVIEWED WITHIN THE PAST YEAR BY SPACECO, INC. FOR SIMILAR PROJECTS AND/OR AVAILABLE MATERIAL & LABOR COST DATA. SOME UNIT PRICES HAVE BEEN ADJUSTED TO ALLOW FOR SPECIAL CONDITIONS. THESE UNIT PRICES DO NOT INCLUDE ENGINEERING FEES. CONSULTING ENGINEERS * SITE DEVELOPMENT ENGINEERS * LAND SURVEYORS 9575 WEST HIGGINS ROAD, SUITE 700, ROSEMONT, ILLINOIS 60018 847-696-4060 * FAX 847-696-4065 * 888-SPACECO (772-2326) S PAC EC O INC. FILE NAME:6953-04-EOPC-2020-0604 � InfrasVucture Public Improvements for the Bill of Materials of The Elk Grove Technology Park A. Watermain Improvements 1. Watermain, DI Class 52 wl Fittings 6" 75 L.F. $40.00 $3,000 2. Watermain, DI Class 52 wl Fittings 10" 115 L.F. $70.00 $8,050 3. Watermain, DI Class 52 wl Fittings 12" 1,280 L.F. $80.00 $102,400 4. Watermain, DI Class 52 wl Fittings 16" 2,000 L.F. $90.00 $180,000 5. Fire Hydrant wl Aux. Valve and Box 11 EA $5,000.00 $55,000 6. Water Main Connection, Shut Down 12" Valve in 60" Dia. Vault 1 EA $10,000.00 $10,000 7. Water Main Connection, Cut -In -Tee 16" Valve in 60" Dia. Vault 1 EA $16,000.00 $16,000 8. Valve 10" in 60" Dia. Vault 10 EA $4,DD0.00 $40,000 9. Valve 12" in 60" Dia. Vault 2 EA $5,000.00 $10,000 10. Valve 16" in 60" Dia. Vault 7 EA $6,000.00 $42,000 11. Watermain Trench Backfill 540 L.F. $18.00 $9,720 12. Auger 24" Steel Casing wl 16" Pipe 185 L.F. $500.00 $92,500 13. Anode Bags 1 L.S. $120,000.00 $120,000 A. Watermain Improvements Sub -Total= $688,670 B. Sanitary Sewer Improvements 1. Sanitary Sewer. PVC SDR 26 12", 10'-15' DEEP 1,840 L.F. $55.00 $101,200 2. Sanitary Sewer. PVC SDR 26 12", 15'-20'DEEP 521 L.F. $65.00 $33,865 3. Sanitary Manhole, 48" DIA 10'-15' DEEP 11 EA $3,200.00 $35,200 4. Sanitary Manhole, 48" DIA 15'-20' DEEP 3 EA $4,000.00 $12,000 5. Connect to Existing Stub 1 EA $5,000.00 $5,000 6. Plug and Stake Sanitary Service 3 EA $350.00 $1,050 7. Sanitary Trench Backfill 150 L.F. $45.00 $6,750 B. Sanitary Sewer Improvements Sub -Total= $195,065 C. Storm Sewer Improvements 1. Storm Sewer, RCP, CL IV, 12" DIA 525 L.F. $35.00 $18,375 2. Storm Sewer, RCP, CL IV, 15" DIA 249 L.F. $38.00 $9,462 3. Storm Sewer, RCP, CL IV, 18" DIA 345 L.F. $42.00 $14,490 4. Storm Sewer, RCP, CL IV, 24" DIA 387 L.F. $60.00 $23,220 5. Storm Sewer, RCP, CL IV, 36" DIA 382 L.F. $70.00 $26,740 6. Storm Sewer, RCP, CL IV, 48" DIA 560 L.F. $90.00 $50,400 7. Storm Sewer, RCP, CL IV, 60" DIA 619 L.F. $110.00 $68,090 S. Inlet, 24" DIA, Type -A 7 EA $1.000.00 $7,000 9. Catch Basin, 48" DIA, Type -A 11 EA $2,500.00 $27,500 10, Catch Basin, 60" DIA, Type -A 6 EA $3,000.00 $18,000 11. Manhole, 48" DIA, Type -A 3 EA $2,DD0.00 $6,D00 12. Manhole, 60" DIA, Type -A 2 EA $2,500.00 $5,000 13. Manhole, 72" DIA, Type -A 1 EA $4,000.00 $4,000 14. Manhole, 84" DIA, Type -A 1 EA $6,000.00 $6,000 15. Manhole, W' DIA, Type -A 6 EA $7,500.00 $45,000 16. Manhole, 108" DIA, Type -A 1 EA $9,500.00 $9,500 17. T Junction Box 3 EA $12,000.00 $36,000 18. Storm Trench Backfill 900 L.F. $17.00 $15,300 19. 12" Flared End Section, wl Grate incl. rip -rap 1 EA $1,800.00 $1,800 20. 60" Flared End Section, w/ Grate Ind. rip -rap 2 EA $7,000.00 $14,000 C. Storm Sewer Improvements Sub -Total= $405,877 D. Roadway Improvements Roadway 1. 9" Crushed Gravel, Crushed Stone, or Crushed Concrete 15,730 S.Y. $9.00 $141,570 2. 3" CA-6 Aggregate Capping Material 15,730 S.Y. $3.00 $47,190 3. 10" HMA Binder Course, IL 19, N70 15,730 S.Y. $38.50 $605,605 4. 2" HMA Surface Course Mix D, N70 15,730 S.Y. $11.00 $173,030 Other Roadway Improvements 9,990 L.F. $15.00 $149,850 5. Curb and Gutter, B6.12 1 L.S. $59,520.00 $59,520 6. Pavement Marking Allowance 15 EA $250.00 $3,750 7. Sign and Post D. Roadway Improvements Sub -Total= $1,180,515 E. Oakton Street Roadway Improvements 1. Oakton Street Roadway Improvements 1 L.S. $150,000.00 $150,000 E. Oakton Street Roadway Improvements Sub -Total= $150,000 TOTAL= $2,620,127 Page 2 of 3 SPAC E C O INC. FILE NAME:6953-04-EOPC-2020-0604 �Infrastructure Public Improvements for the Bill of Materials of The Elk Grove Technology Park NOTES: 1) This estimate is prepared based on "Mass Grading and Infrastructure Improvement Plans for The Elk Grove Technology Park" dated December 1, 2017; last revised April 11, 2019 2) This estimate is prepared as a guide only. SPACECO makes no warranty that actual costs will not vary from the amounts indicated, and assumes no liability 3) This estimate DOES NOT include: PERMIT FEES REVIEW FEES LANDSCAPING LIGHTING OUTSIDE OF RIGHT-OF-WAY DRY UTILITY CONSTRUCTION DRY UTILITY REMOVAURELOCATION HIGGINS ROAD ROADWAY IMPROVEMENTS RETAINING WALL NEAR WESTERN BERM DEMOLITION OF EXISTING COMMERCIAL BUILDINGS AND ASSOCIATED LOT IMPROVEMENTS DEMOLITION OF EXISTING HOMES AND ASSOCIATED LOTIMPROVEMENTS DEMOLITION OF EXISTING FARM BUILDINGS AND ASSOCIATED LOT IMPROVEMENTS EARTHWORK EROSION CONTROL IMPROVEMENTS PAVEMENT MARKING PROVIDED BY CONTRACTOR 4) This estimate DOES NOT include maintenance costs for: EROSION CONTROL CONSTRUCTION ROADS BUILDING PADS Page 3 of 3 PHILADELPHIA INSURANCE COMPANIES :1 \icmhcr of Ihc'1'nkio Al a inr t nvup FIRST TERM PREMIUM FULLY EARNED Bond Number: PB 01741900032 Premium (Two (2) Years): $1,572.00 MAINTENANCE BOND KNOW ALL MEN BY THESE PRESENTS: That GB Elk Grove 1. LLC xnd GB Elk Grove 2, LLC as Principal, and PHILDELPHIA INDEMNITY INSURANCE COMPANY, a corporation organized and existing under the laws of the State of Pennsylvania and duly authorized to transact a general surety business in the state of Illinois, hereinafter called the Surety, are held and firmly bound unto Elk Grove Villase. IL, hereinafter called Obligee, in the full and just sum of Two Hundred Sixty Two Thousand Twelve and 70/100 DOLLARS ($262,012.70 lawful money of the United States of America, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, on the 14th day of November 2017, the above named Principal entered into an agreement with the Obligee for: Mass Grading and Infrastructure Improvement Plans for The Elk Grove Technology Park - Prolect No. 6953,04, Elk Grove VWage, Illinois WHEREAS, under the terms of said agreement, Principal is required to guarantee replacement and repair of improvements as described therein for a period of Two (2) year(s) from and after the date of completion and acceptance of said improvements; NOW, THEREFORE, If the above Principal for a period of Two (2) year(s) from and after the date of completion and acceptance of same by said Obligee, replace any and all defects in said work resulting from defective materials or defective workmanship, then the above obligation to be void; otherwise to remain in full force and effect. Any claims upon this bond must be made prior to the expiration of thtwo e f� eyear maintenance period. IN WITNESS WHERE OF, the seal and signature of said Principal is affixed hereto and the corporate seal and the name of said Surety is hereto affixed and attested by its duly authorized Attorney -in -Fact this 16`h day of June, 2020. GB Elk Grove 1. LLC and GB Elk Grove 2, LLC (Principal) PHILDELPHIA INDEMNITY INSURANCE COMPANY q ( (Surcty) By: Rachel Richardson Attorney In Pact 136 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint James W. Banahunim Fnok Scardino and Rachel Richardson of ILacMan Coa nic& 4LC, its true and lawful Attorney -in -fact with full authority to execute on its behalf bonds, undertakings, recognizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its business and to bind the Company thereby, in an amount not to exceed S25.000.000. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 14' of November, 2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company: (1) Appoint Attorney(s) in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile, and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 14T" DAY OF NOVEMBER, 2016. 1 ,l (Seal) Robert D. O'Leary Jr., President & CEO Philadelphia Indemnity Insurance Company On this 14'h day of November, 2016, before me came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is the Corporate seal of said Company; that the said Corporate Seal and his signature were duly affixed. nv (Notary Seal) Notary Public: residing at: My commission expires: 1, Edward Sayago, Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto on this 14"' day of November, 2016 are true and correct and are still in full force and effect. I do further certify that Robert D. O'Leary Jr., who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have suhscribed my name and affixed the facsimile seal of each Company this day of J -) L - , 20AQ Edward Sayago, Corporate Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY