Loading...
HomeMy WebLinkAboutORDINANCE - 1054 - 4/13/1976 - STORM WATER DETENSION AMENDEDORDINANCE NO. 1054 AN ORDINANCE AMENDING CHAPTER 8, SUBDIVISIONS, SECTION 8.005 OF THE MUNICIPAL CODE OF THE VILLAGE OF ELK GROVE VILLAGE RELATING TO STO tK DRAINS AND ADDING THERETO STO&`1 WATER DETENTION NOW, THEREFORE, BE IT ORDAINED by the President and Board of Trustees of the Village of Elk Grove Village, Counties of Cook and DuPage, Illinois: Section 1: That Section 8.005 Required Improvements) of Chapter 8, Subdivisions, is hereby amended to read as follows: 8.005 Required Improvements) Storm Drains. An adequate system of storm water drainage designed for a one hundred year return frequency rain*shall be constructed and installed, consisting of pipes, tiles, manholes, inlets and other necessary facilities that will adequately drain the subdivision and protect roadway pavements and will prevent the accumulation of storm water at any place under normal conditions. Open ditches shall be prohibited in all residential areas. Backyard swales are permitted in residential areas subject to the following regulations: a) Maximum and minimum slopes and general design criteria of the Federal Housing Administration's "Minimum Property Requirements" will be acceptable except as herein modified. b) No continuous swale shall have a length exceeding six hundred feet. c) Minimum grade of the flowline shall be four -tenths percent. d) At no point in the swale shall the flowline be more than three feet below the finished grade of the top soil at the foundation of the house opposite the Swale. *(See attached charts for Rainfall Intensity and Time of Concentration Data) e) No change in alignment of a backyard swale shall exceed forty-five degrees. Open ditches are allowed for rear yard drainage in the industrial and commercial areas if they conform to the following regulations: 1) The bottom of the ditch shall be lined with a five (5) inch thick concrete invert minimum of 3'-0" wide. Two.Number 6 Reinforcing Rods are to be equally spaced for the entire length of the invert. 2) The grade of the invert shall be designed to provide a velocity of flow between ? and 5 feet per second. slope. 3) The sides of the ditch shall not exceed a 2 to 1 4) All side slopes shall be sodded from the invert to the top of the slope. 5) Any alignment change shall require concrete slope protection on the side slopes of the ditch. Storm Water Detention General: The following shall govern the design of any improvement with respect to the drainage and detention of storm water runoff. - 2 - 1) Streets, ckn, depths of lots, parks ni ner public grounds s..,ll he located and laid out in such a manner a4 to preserve and uttlize natural streams, chann as and detention basLus, lnc.luding wherever possible the larger streams and flood plains within parks or other public grounds. 2) Storm water from a ]On year return frequency storm must be stored and/or transporecd from any drveLopment in such a manner that no damage results from flooding. 3) A combination of storage and controlled release of storm water run- off is required for all nonresidential developments, regardless of size, and for residential developments exceeding 5 acres in are:. 4) The release rate of storm water from all developments requir- ing detention shall not exceed the storm water runoff rate from the arca in its natural undeveloped state. Because of the flat conditions of the land in this area, channel configurations cut by nature are generally unable to handle the runoff from high intensity rainfalls and results in flood plain storage or spreading of runoff over the land areas during the larger storm periods. In order not to increase the runoff from such areas after development, the release rate must be limited to the carrying capacity of these natural channels. A release rate of not greater than that calculated from a storm of three (3) year-requency with a runoff rate coefficient of 0.15 shall be used, unless the applicant can show by detailed calculations, which are acceptable to the Village Engineer, that the discharge rate of the natural outlet channel serving the area is greater. 5) Drainage systems shall have adequate capacity to bypass through the development the flow from all upstream areas for a storm of design frequency assuming that the land is in a fully developed state under present zoning or zoning proposed under a Comprehensive Plan. The bypass flow rate shall be computed utilizing a runoff coefficient of not less than 0.35. An allowance will be made for up- stream detention when such upstream detention and release rate has previously been approved by the Village Engineer and that evidence of its construction can be shown. 6) The live detention storage to be provided will be calculated on the basis of the 100 -year frequency rainfall as published by the U. S. Weather Bureau for this area. The detention volume required will be that necessary to handle the run- off of a 100 -year rainfall, for any and all durations, from the fully developed drainage area tributary to the reservoir, less that volume discharged during the same duration at the approved release rate. 7) Sharply meandering streams or channels may be partly straightened and minor changes made in other channels, subject to approval of the Village Engineer, provided (1) the floodway dimensions of the stream or channel are maintained, (2) the volume of flood- water storage outside the floodway is not reduced, and (3) the changes and channels comply with the provisions of Section A. 8) The smaller uppermost reaches of drainage channels and swal.es forming the natural drainage system near the watershed divide may be relocated or eliminated and incorporated into the planned system of storm sewers upon a showing that the system is adequate and can safely handle the flood crater runoff following the heavier rainstorms. 9) Sturm sc%:cr outfalls shall he so designed, by reason of eleva- tion of the invert, pumping, or othcrwJse., that when the re- ceiving stream is In full [.loud the :;form se\r(er will continnc to drain. the arra it is drs:t.;;uoc{ to serve at a uniform rate. - 3 - 10) Cross :,e ns and grades of streets des as channels shall be deulgncn to temporarily store and convey the overflow from storm sewers and over -the -curb runoff and be provided with adequate outlets for safe disposal of such overflow. The street cross-section shall provide a lot grade for the finished floor of each adjoining building at' lutist 2-Pe(,t higher than the crown of the pavement, and the minimum sill elevation of openings in the outer walls of such buildings shill be at least 2.5 feet above the crown elevation. 11) The crown of street pavements hereafter built adjoining or near stream, floodwater runoff channels or detention basins shall be not lower than the established high-water elevation plus 2 -feet, in the case of major streets, and plus 1 -Foot, in the case of other streets. 12) Waterway openings of bridges and culverts hereafter built over streams or floodwater runoff channels shall be designed with a waterway opening large enough to handle the flow from a 100 -year frequency storm. 13) Construction, filling, or other similar physical occupation of the flood plain as defined by the Department of the Interior United States Geological Survey, which is otherwise prohibited by this ordinance, may be permitted if adequate compensatory storage volume is provided. This shall be accomplished by developing in the existing flood plain excavated spice below the high- water elevation in an amount equal to the flood storage capacity preempted by tte proposea construction. in the case of streams and channels, such excavation shall be made opposite or immediately upstream from the area to be filled. It shall be the duty of the property owner to conduct such excavation in a manner consistent with the other provisions of this ordinance and may be done only after the approval by the Village Engineer has been granted. Approval of the Village Engineer will be contingent upon the property owner's ability to demonstrate that the compensatory storage will be adequate and satisfactory for its intended purpose. B. DRAINAGE PLAN: A comprehensive drainage plan must be submitted to the Village Engineer vhich incorporates the forementioned rules and shall provide or be accompanied by maps or other descriptive material showing the following: 1) The extent and area of each watershed tributary to the drainage channels in the subdivision. 2) The street storm sewers and other storm drains to be built, the basis of their design, the outfall and outlet locations and elevations, receiving stream or channel and its high-water elevation, and the functioning of the drains during high-water conditions. 3) The parts of the proposed street system where pavements are planned to be depressed sufficiently to convey or temporarily store overflow from strom sewers and over -the -curb runoff resulting from the heavier rainstorms and the outlets for such overflow. k) Existing streams and floodwater runoff channels to be main- tained, enlarged, altered otherwise, and eliminated; and new channels to be constructed, their locations, cross sections and profiles. 5) Existing culverts and bridges, drainage areas, elevation, and adequacy of waterway openings; and new culverts and . bridges to be built, their materials, elevations, waterway openings and basis of design. G) Existing detention ponds and basins to he maintained, enlarged, altered otherwir:c and net! ponds or hneinti to he built- with duns, and their dexiP,n. - 4 - C. CONSTMICTION REQUIREMENTS FOR DETENTION PONDS: 1) Detention Ponds Containing Permanent Water a - Detention reservoirs containing permanont lakes nust have a water area of at least one-half acre and a minimum depth of approximately 10 feat over at least 25 percent of the total area. The remaining lake area must have an avera,;t depth of at least 5 feet and should havo no extensive shallow areas. b - In excavated lakes the underwater side slopes in the lakes must be stable. In the case of valley storage, natural slopes may be considered to be stable. c - A safety ledge four to six feet in width is required and must be installed in all lakes approximately 30" to 36" below the permanent water level. In addition a ledge 12" to 18" above the permanent water line must be provided. The slope between the two ledges must be stable and of a material which will prevent erosion due to wave action such as stone or rip -rap. d - A safety ramp exit from the lake is required in all cases and should have a minimum width of 20' and exit slope of 6 horizontal to 1 vertical. The ramp must be of a material that will prevent its deterioration due to vehicle use and/or wave action. e - Periodic maintenance is required in lakes to control week and larval growth. The reservoir must also be designed to provide for the easy removal of sediment c:hich will accumulate in the lake during periods of reservoir opera- tion. A means of maintaining the designed water level of the lake during prolonged periods of dry weather is also required. One suggested method is to have a water hydrant near the pond site. 2) Detention Ponds Containing Permanent Water and Dry Detention Ponds: a - All excavated spoils must be spread so as to provide for aesthetic and recreational features such as sledding hills, sport fields etc. Slopes of 6 horizontal ,to 1 vertical are required except where recreation uses call for steeper slopes. Even these features must have a slope no greater than 3 horizontal to 1 vertical for safety, minimal erosion, stability, and ease of maintenance. b - Safety screens must be provided for any pipe or opening to prevent children or large animals from crawling into the structures. A maximum opening of 6 -inches is required. c - Danger signs must be mounted at appropriate locations to warn of deep water, possible flood conditions during storm periods and other dangers that exist. Life preservers must also be placed at appropriate locations. Fencing must be provided if deemed necessary by the Village Engineer. d - In valley storage reservoirs, an emergency spillway or other provision must be provided to allow for by-passing - 5 - I flood flows during periods when the design capacity of the reservoir and outlet has been exceeded. This spillway must be of such a design that its operation is automatic and does not require manual attention. e - Sod or other suitable vegetative cover as approved by the Village Engineer must be provided throughout the entire reservoir area. f - Debris and trash removal and other necessary maintenance must be performed after each storm to assure continued operation in conformance to the design. 3) Dry Detention Ponds: a - Dry detention ponds must have an underdrain system to minimize the wetness of the bottom so that water does not remain stand- ing in the bottom thereby harboring insects and limiting the potential use of the reservoir. The underdrain system could empty by gravity into the wet well of a pump station or to the receiving stream directly. b - The dry detention pond must be designed to serve multi-purpose functions. Recreational facilities, aesthetic qualities, etc. as well as flood water storage must be considered in planning the reservoir. D. RESPONSIBILITY FOR MAINTENANCE OF DETENTION PONDS: 1. The responsibility for maintenance during construction, and there- after, shall be the responsibility of the land developer/owner. 2. Storm water detention and retention basins may be donated to the Village or other unit of government designated by the Village, for ownership and permanent maintenance, providing: a - The facility has been designed and constructed according to Village requirements enumerated above; b - All improvements have been constructed, approved and accepted by the Village for the land area served by the drainage basin; c - Detention ponds containing permanent water are located within a tract of land consisting of fifteen (15) acres or more, of which 30% of the area is above the high water line; and in- cludes a body of water of ten (10) surface acres or more, of which 50 percent is to have a minimum depth of ten (10) feet: 4 inch size rip rap to be provided 3 feet below and 3 feet above normal water line; all slopes between the rip rap and high water line are to be sodded and the remaining land area is to be hydroseeded; are equipped with electrically driven aeration devices to maintain proper aerobic conditions to sustain acquatic life; have a four (4) foot wide crushed limestone walkway at the high water line entirely around the body of water; are situated to permit public access 200 feet wide and not less than 200 feet to the high water line, and providing further that the high water line is not closer than thirty-five (35) feet to any property line. d - Dry detention ponds are located on a tract of land consisting of two (2) acres or more of land, including a minimum bottom area 275x275 feet or 200x375 feet; maximum side slopes of 5:1; all slopes are to be sodded to the high water line; the bottom of the basin and areas above the high water line are to be hydroseeded; and providing further that the high water line is not closer than thirty-five (35) feet to any property line. Section 2: The Village Clerk is hereby authorized to publish this ordinance in pamphlet form. Section 3: This ordinance shall be in full force and effect from and after its passage, approval and publication according to law. PASSED this 13th day of April APPROVED this 13th day of April , VOTE: AYES: 6 NAY: 0 ABSENT: 0 ATTEST: Village Cle 1976. 1976. Published in pamplet form this 21st day of April, 1976, in the Elk Grove Herald. - 7 - L 13.711.. wa SOURCE: t jTMENT OF THE ARMY. TECHNICAL MANU, '5-820-1. 700 500 x Z 400 w Q 300 v a 200 100 0 100 200 300 400 500 600. LENGTH STANDARDIZED TO S=1.0% 1 a� 60 O � %/O�\OO FF \ NIP 9pp 400 ' 6.8001 a —tet 1200 —EXAMPLE 0 100 200 300 400 500 600. LENGTH STANDARDIZED TO S=1.0% 0 10 20 30 40 50 MINUTES TIME OF CONCENTRATION EASED ON S=1.0% LENGTH OF OVERLAND FLOW (FEET) STANDARDIZED TO S=1.0% 0 H 1 a� 60 O � %/O�\OO \ NIP 9pp 400 ' 6.8001 a —tet 1200 —EXAMPLE 0 10 20 30 40 50 MINUTES RAINFALL INTENSITY DATA DATA SOURCE: U.S. WEATHER BUREAU TECHNICAL PAPER \'O. 40 Storm Duration minutes or hours) Rainfall Intensity (inches per hour) 3 -Year 100 -Year Storm Duration (minutes or hours) Rainfall Intensity (inches per hour) 3 -Year 100 -Year 0. 17 hrs. 10 min. 4.3 7.6 10 hrs. 0.27 0.49 0.33 " 20 " 3.0 5.5 11 it 0.25 0.46 0.50 " 30 " •2.45 4.40 12 " 0.23 0.43 0.67 " 40 " 2.15 3.70 13 " 0.22 0.40 0.83 " 50 " 1.85 3.20 14 " 0.20 0.38 1 hr. 1.67 2.80 15 0.19 0. 36 1.5 " 1.27 2.10 16 " 0.18 0.34 2 " 1.00 1.70 17 " 0.17 0.33 3 " 0.73 1.20 18 " 0.16 0.31 4 " 0.58 1.00 19 " 0.16 0.30 5 " 0.48 0.84 20 " 0.15 0.29 6 " 0.42 0.73 21 " 0.15 0.28 7 " 0.37 0.65 22 " 0.14 0.27 8 " 0.33 0.58 23 " 0.14 0.26 9 " 0.30 0.53 24" 0.13 0.25