Loading...
HomeMy WebLinkAboutRESOLUTION - 80-86 - 9/23/1986 - AGRMT/IL DEPT OF TRANSPORTATION RESOLUTION NO. 80-86 WHEREAS, the Village of Elk Grove Village has entered into an agreement with the State of Illinois for the improvement of Arlington Heights Road known as State Section 77WRS-86, Village Section 80-00030- 00-WR; and WHEREAS, in compliance with the aforementioned agreement, it is necessary for the Village to appropriate funds to pay its share of the cost of said improvement. NOW, THEREFORE, BE IT RESOLVED that there is hereby appropriated the sum of One Hundred Eighty Seven Thousand and Five Hundred ($187,500.00) or so much thereof as may be necessary, from any money now or hereafter available to the Village, to pay its share of the cost of this improvement as provided in the agreement. STATE OF ILLINOIS ) VILLAGE OF Elk Grove Village ) SS COUNTY OF Cook and DuPage ) I, Patricia S. Smith, Village Clerk in and for the Village of Elk Grove Village do hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Village President and Board of Trustees at a meeting on the 23rd day of September A.D. 1986. APPROVED September 23 , 1986. IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 26th DEPARTMENT OF TRANSPORTATION day of September A.D. 1986. Division of Highways Patricia S. Smith District Engineer Village Clerk Exhibit A -4- 0030r# AGREEMENT THIS AGREEMENT entered into this Z3ILA day of SrmpTe-w%aBR. A.D. 1986 by and between the STATE OF ILLINOIS, acting by and through its DEPARTMENT OF TRANSPORTATION, hereinafter called the STATE, and the VILLAGE OF ELK GROVE VILLAGE, County of Cook, of the State of Illinois, hereinafter called the VILLAGE. WITNESSETH: WHEREAS, the STATE, in order to facilitate the free flow of traffic and ensure safety to the motoring public, is desirous of initiating Phase I Engineering for improving approximately lineal feet of Arlington Heights Road (F.A.U. Route 2626, STATE Section 77WRS-86 VILLAGE Section 86-00030-00-WR) from Illinois Route 72 (Higgins Road) north to Central Road in the Villages of Elk Grove Village and Arlington Heights, to provide six (6) lanes (with appropriate median) from Illinois Route 72 to Illinois Route 629 four (4) or six (6) lanes (with appropriate median) from Illinois Route 62 to Central Road, full interchanoe at Northwest Tollway, auxiliary lanes on Tollway and an enclosed drainage system, and by performing all other work necessary to complete the improvement in accordance with the approved plans and specifications; and WHEREAS, the VILLAGE OF ELK GROVE VILLAGE is desirous of said improvement in that same will be of immediate benefit to the VILLAGE residents and permanent in nature; NOW, THEREFORE, in consideration of the mutual covenants contained herein, the parties hereto agree as follows: 1. The STATE agrees to preform or cause to be preformed all activities including such items as aerial mapping, survey capacity analyses, development of geometrics, roadway design, drainage concept plan, right-of-way requirements and analysis of environmental impacts and mitigation thereof, to complete Phase I. 2. It is mutually agreed by and between the parties hereto that the estimated cost for Phase I Engineering is $750,000.00 PHASE I PARTICIPATION Village Share 25% ($ 187,500.00) Village of Arlington Heights 25% STATE Share 50% 3. The VILLAGE agrees to reimburse the STATE for 25% of the actual Phase I Engineering Costs. The total cost to the VILLAGE is estimated to be $187,500.00 4. The VILLAGE has passed a resolution appropriating sufficient funds to pay its share of the cost of this improvement, a copy of which is attached hereto as Exhibit A and made a part hereof. Prior to the STATE beginning this work and receipt of a STATE invoice, the VILLAGE will pay to the Department of Transportation of the State of Illinois in a lump sum, from any funds allotted to the VILLAGE an amount equal to 95% ($178,125) of its obligation incurred under this agreement and will pay to said Department the remainder ($9, 375 Est.) of its obligation in a lump sum upon completion of the Phase I Engineering based upon final costs. Should the VILLAGE share, based on final costs be less than the amount previously paid, the STATE agrees to reimburse the VILLAGE for said difference. The VILLAGE aorees to pass a supplemental resolution to provide necessary funds for its share of the cost of this improvement if the amount appropriated herein proves to be insufficient to cover said cost. 5. The VILLAGE will have the right to review the Phase I Report. The STATE shall keep the VILLAGE informed of progress and problems as they occur, but not less than monthly. Participation and other responsibilities in other phase of the work such as Phase II (preparation of final contract plans and estimates) , land acquisition activities, construction, etc. will be determined at a later date. -2- THIS AGREEMENT and the covenants contained herein shall become null and void in the event Phase I Engineering has not commenced by July 1, 1989. THIS AGREEMENT shall be binding upon and inure to the benefit of the parties hereto, their successors and assians. By Charles J. Zettek resident Date: September 23, 1986 ATTEST: Patricia S. Smith (SEAL) Village Clerk STATE OF ILLINOIS DEPARTMENT OF TRANSPORTATION By Director of Highways Date: September 23 ,19 86 _3-