HomeMy WebLinkAboutRESOLUTION - 17-78 - 3/14/1978 - LETTER OF GUARANTEE/PUBLIC IMPROVEMENTSRESOLTUION No. 17-78 A RESOLUTION ACCEPTING A LETTER OF GUARANTEE IN THE AMOUNT OF $1,530,815.43 IN LIEU OF A PERFORMANCE BOND FROM ALLIANCE SAVINGS AND LOAN ASSOCIATION, GUARANTEEING THE CONSTRUCTION OF PUBLIC IMPROVEMENTS FOR PARKVIEW HEIGHTS SUBDIVISION LOCATED WEST OF ROHLWING ROAD AND SOUTH OF BIESTERFIELD ROAD NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Elk Grove Village, Counties, of Cook and Du Page, State of Illinois: Section 1. That the President and Board of Trustees do hereby authorize the acceptance of a Letter of Guarantee in the amount.of $1,530,815.43 in lieu of a Performance Bond, from Alliance Savings and Loan Association, guaranteeing the construction of public improvements as required in the Subdivision Control Ordinance at the Parkview Heights Subdivision, said improvements as shown on Exhibit "A" attached hereto and made a part hereof. Said property located on the West side of Rohlwing Road and South of Biesterfield Road in Elk Grove Village. Section 2. The Letter of Guarantee also guarantees that if the improvements are not completed by September 9, 1980, at the demand of the Village of Elk Grove Village said funds will be released for the purpose of completing the requirements as specified in Exhibit "A" attached hereto and made a part hereof as if fully set forth. Section 3. That this resolution shall be in full force and effect from and after its passage and approval according to law. PASSED this 14th day of March I, 1978. APPROVED this 14th day of March ATTEST: Village rk 1978. Ei4GINEER'S ESTIraTE OF COST PARKVIEW HEIGHTS SUBDIVISION ELK GROVE VILLAGE, ILLINOIS PROJECT NO. 6520-4 SANITARY SEWER 2-21-78 gx#ya„ A Item Quantity Unit Description Unit Price Total Cost 1. 9,750 L.F. 8" Truss Pipe $ 8.25 $80,437.50 2. 47 Ea. 48" Dia. Manhole 520.00 249440.00 3. 1,550 L.F. Sand Backfill 5.00 7,750.00 4. 4 Ea. Connection to existing manhole 200.00 800.00 5. 134 Ea. Short Service Complete 120.00 16,080.00 6. 126 Ea. Long Service Complete 450.00 56,700.00 TOTAL ESTIMdA PE OF COST FOR SANITARY SEWER $186,207.50 WA TEiv lA IN 1. 1,950 L.F. 12" D.I.W.i•,. (Incl. fittings) $ 15.50 $30,225.00 2. 11,500 L.F. 8" D.I.W.i•,.(Incl. fittings) 10.50 120,750.00 3. 100 L.F. 6" D.I.W.m.(Incl. fittings) 9.20 920.00 4. 38 Ea. Fire Hydrant w/auxiliary valve 700.00 26,600.00 5. 4 Ea. 12" Gate Valve 700.00 2,800.00 6. 10 Ea. 8" Gate Valve 325._00 3,250.00 Aa 7. 11 Ea. 8" Gate Valve & 48" Dia. Vault 825.00 9,075.00 8. 2 Ea. 12"x8" Pressure Connection, Incl. 60" Vault 1500.00 3,000.00 9. 1 Ea. 8"x8" Pressure Connection, Incl. 48" Vault 1200.00 11200.00 10. 2 Ea. Connection to existing 12" water main 500 -CO 1,000.00 11. 130 L.F. Auger & Push 90.00 11,700.00 12. 8,200 L.F. Sand Backfill 5.00 41,000.00 2-21-78 GINEER'S ESTIMATE OF COST -,on't) PROJECT NO. 6520-4 WATERNiAIN (con't) Item quantity Unit Description Unit Price Total Cost 13. 139 Ea. Short Services Complete $120.00 $16,680.00 14. 121 Ea. Long Services Complete 290.00 35,090.00 TOTAL ESTIMATE OF COST FOR WATERkAIN$303,290.00 STORM SEWER 1. 81150 L.F. 10" R.C.C.P.(Incl.fittings$ 7.00 $57,050.00 2. 800 L.F. 12" R.C.C.P, " " 8.00 6,400.00 3, 385 L.F. 15" R.C.C.P. w9.00 3,465.00 4. 1,000 L.F. 18" R.C.C.P. " 7 10.80 10,800.00 5. 1,100 L.F. 24" R.C.C.P. " " 17.00 18,700.00 6. 1,070 L.F. 27" H.C.C.P. " " 20.00 21,400.00 7. 500 L.F. 30" R.C.C.P. " " 21.00 10,500.00 8. 250 L.F. 48" R.C.C.P. " " 38.00 9,500.00 9. 900 L.F. 54" R.C.C.P. " " 43.00 38,700.00 10. 600 L.F. 6" C.M.P.(perforated) 5.75 3,450.00 11. 40 L.F. 8" C.M.P. 8.00 320.00 12. 200 L.F. 15" C.M.P. 10.60 2,120.00 13. 4 Ea. 15" C.M.P. End Section 70.00 280.00 14. 9 Ea. 60" Dia. Manhole 760.00 61840.00 15. 22 Ea. 48" Dia. kanhole 520.00 11,440.00 16. 37 Ea. 48" Dia. Inlet Manhole 520.00 19,240,00 17. 50 Ea. 24" Dia. Inlet 250.00 12,500.00 18. 1 Ea. Special Structure 'B' 1000,00 1,000.00 19. 1 Ea. Storm Outfall Structure 1000.00 1,000.00 Cpte. 20. 5,000 L.F. Sand Backfill 5.00 25,000.00 TOTAL ESTIMATE OF COST FOR STORM SEWER $259,705.00 GRAND TOTAL ESTIMATE OF COST FOR SANITARY, STORM & WATERkAIN $749,202.50 2-21-78 ENGINEER'S ESTIMATE OF COST PAflKVIEW HEIGHTS SUBDIVISION ELK GROVE VILLAGE, ILLINOIS PROJECT NO. 6520-4 PAVEMENT Item (�uantitY Unit Description Unit Price Total Cost 1. 7,400 S.Y. 1" Bit.Conc. Surface Course, 2" Bit.Conc. Binder Course, 8t" Pozzolanic Base Course $ 8.09 2. 31,200 S.Y. 1" Bit.Conc.Surface Course, 2" Bit.Conc. Binder Course, 6}" Pozzolanic Base Course 7.16 3. 750 S.Y. 2" Bit.Conc. Surface Course 2.26 4. 750 S.Y. 8" Bit.Aggregate Mixture Base Course 9.25 5. 24,200 L.F. Combination Concrete Curb & Gutter 4.70 6. 113,800 S.F. 5" P.C.C. Sidewalk 1.21 TOTAL ENGINEER'S ESTIMATE OF COST FOR PAVEMENT $ 59,866.00 223,392.00 1,695.00 6,937.50 113,740.00 137,698.00 $543,328.50 ENG INEE:i'S ES LIi�IATE OF COST PAicKVIEW HEIGHTS SUBDIVISION ELK GROVE VILLAGE, ILLINOIS PROJECT NO. 6520-4 EARTH EXCAVATION 2-21-78 Itei,; quantity Unit Description Unit Price Total Cost 1. 129,486 C.Y. Earth Moving Cut & Fill $ 1.10 $142,434.60 2. 1 Lump Sum Fine Grading for pavement 9200.00 9200.00 TOTAL ENGINEER'S ESTIMATF OF COST FOR EARTH EXCAVATION $151,634.60 i -,IS CELLANEOUS 1. 400 2. 29 Each frees $ 60.00 $ 24,000.00 Erich Street Lighting 1500.60 43,500.00 TOTAL ENGINEER'S ESTIriATE OF COST FOR b,ISCELLtiNEOUS $ 67,500.00 GRAND TOTAL ENGINEER'S ESTIviATE OF COST FOR PUBLIC L•PaOVEmE NTS $1,511,665.00