Loading...
HomeMy WebLinkAboutRESOLUTION - 2-09 - 1/13/2009 - 2009 MFT STREET RESURFACING�ii1�OlS Department Streets for Maintenance of .,} Streets and-HighWays by Municipality Of. Transportation Under the Illinois Highway Code Resolution No. 2-09 BE IT RESOLVED, by the MAYOR AND BOARD OF TRUSTEES of the (Council or President and Board of Trustees) VILLAGE of ELK GROVE VILLAGE Illinois, that there is hereby (City, Town or Village). (Name) appropriated the sum of $1,469,415.00 of Motor. Fuel.Tax.funds for the purpose of maintaining streets and -highways under the applicable provisions of the Illinois Highway Code from January 1, 2009. (Date) Aci December 31, 2009 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the.approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing -expenditures from and balances remaining in the accounts) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at SCHAUMBURG Illinois. I; ANN.I. WALSH of ELK GROVE VILLAGE Clerk in and for the • VILLAGE (City, Town or Village) County of COOK-DUPAGE hereby certify the foregoing. to be a true, perfect and complete copy of a resolution adopted by the MAYOR AND BOARD OF TRUSTEES at a meeting on January 13, 2009. (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, 1 have hereunto set -my hand and seal this 15th day of Januaiy, 2009 (SEAL) Ann I. Walsh ELK GROVE VILLAGE _ Clerk (City, Town or Village) Approved Date Department of Transportation Printed 1/13/2009 BLR 14230 (Rev. 11/06) G O • • • • 1J D J J !� a) > Y C: j @U C co - 3 i_ T - 'E t_ N 06 (� C O Q o U w 0 O z tf. 1-0 Lf. L n LLLLLLLLLLLLLL r LLLLLLLLLLLLLLLLLL N .- V 00 v N LO N �-ly 00 0 N It d' N LOO (D V qt N (D to 2'�WafWLL� N M T M N CO O o r N _7 LL' O N LLLLWLLLLLLLLLLLLLLLLLLLLLLLLw N v- O 0 N V N M� (p' N r to M LLLLLLULL N .- N N� O �a_ffOfWOf�ffWWffLL N r M N r 0 0 _. N �- O (D 0 N .� (D M 0) LLLLLLLLLLwLL N 7— to r M N N .-- (D r r r-- N r-' N �- V 't N -- M M co (D N — r d' 07 N N — r m N .-- 00 co 00 m N .. (D M LOO N L LC r Lf) r to r r 1-- U) 6 tf) 0 O co tf) Ln r tf) to (D Ln to Lf) (n to LO r tf) N Lo to to to to Lf) r (`'Mc') Cl) Cl) N NNMNNNNNNco Lf) NNNNCl) tU U L C: OQ J tf r CDr(DO(Y) N r 00 co N N (3) 000 to O N O m to r r rOMrOtnrn� r M LO 00 N N 0 (f rN0000 to — CO 'IT N to V N (DN 0w r- -r r- r rOMLONC> N .- N N (D Un C O a X w I����00 J p Z Z W J W z J z J W Q ~~QOQ YF - OOQQQQooQ F- o ~ a 0.o000O00��-1F=zop C Q>_ 0F-�- W w (n Z O = Q (A(A 1 - }JZZ Qp � F- Q Q�� .H W W Z Ur Z� Ur ln-)LUQ(n w Z W w d0Qww aDamm=W 2='ZQ00I2 w(n=UnUn�WLL_uj_ WwwJ��QQUnW <Um p O J J W J 0 > Q J O O C QQOF-zF-ww�OZOw (n Z 0 0 Q 10 Q O� -W m zm U O J LL U. J��� Un UnUnZ~Z�wW (n 0 W W W O J O W W0 0 W(n>> WCE0 z-) -J�-Q (n 0 J0WQ10 0 Q�w0=(9waZ0 L Q--- (�(�� Q Q> ZZQJ Q Q= -- = Z Q W wZ�YO J Q J J— Q QU z 2_= 2 0 0 0 w J J 0> w J W LL J w w > Z Q))' ~U)QF-Ww cr U 001000 0000�0Unw O 00 > Un aQZzwozT_w �Z�QO�ww 00 �z00 Jw—w,�0 Q �— O�OCgC�--�3: zcnzYwF- F-0 02 z LL JF-'QJQF- 0 w Q W O >- J Y W W w Z (n 0 U w F- Q =Q0=ww_ U Z U Z a.. ~ -a Q 2(9d� Q- :Owwmmw—EU_0wzJ>maQQ' Q>> w O Q O J O W- Q--- w of Q� O, Q� a (� U A (A CV a n co cD r; N co 0 0 N N N Illinois Department of Transportation Municipal Estimate of Maintenance Costs Period from 01/01/2009 to 12/31/2009 Section Number Municipality 09 — 00000 —00 -GM Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation (No. — Description) Group (i.u.tu.ly) For GrouD I. II. Item or III (Material. Eouioment or Labor) Unit Operation Unit Quantity Price Cost Cost Bituminous Concrete 1 Hot -Mix Asohalt Ton 500 44.00 $22.000. Material Purchase Surface Course Contract Mix -"C" N-50 MFT -$92,400 1 Bituminous Material GAL 300 6.00 $1,800. Non -MFT -$15,000 Prime Coat SS -1 5 gallon pails 1 Hot Mix Asphalt Ton 2,200 38.00 $83,600. Binder Course IL -19.0• .N-50 I 1 1. 1 1 1 1 Total Day Labor Costs Total Estimated Maintenance Operation Cost $107,400. Engineering Inspection Material Testing Total Estimated Engineering Cost Total Estimated Maintenance Cost $107,400. Submitted: Approved: Date Date By: Thomas J. Cech Director of Public.Works Municipal Official Tide Regional Engineer 'Submit Four (4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev. 2/23/06) Printed on 12/12/2008 11:27:19 AM Illinois. Department of Transportation Period from 1-1-09 to 12-31-09 Municipal Estimate of:. Maintenance Costs Section Number 09- 00000 - 01 - GM Municipality Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation (No. — Description) Group . (I.II,ui.N� For Grouo I. II. or III (Material. Eauioment or Labor) Unit Operation Item - Unit Quantity Price Cost Cost Hot -Mix Asphalt 111 - Hot -Mix Asohalt S.Y. 110.000 1.35 $148.500. Resurfacing Contract Surface Removal MFT. $914,665. 111 Hot -Mix Asphalt Full Width 11/2 6,000 64.00 $384,000. Surface Course 111 Hot -Mix Asphalt Surface S.Y. 5,500 1.35 $7,425. Total Day Labor Costs Total Estimated Maintenance Operation Cost $914,665. Preliminary Engineering Engineering Inspection Material Testing Total Estimated Engineering Cost Total Estimated Maintenance Cost $914,665. Submitted: Approved: Date Date By: Thomas J. Cech Director of Public Works Page 1 of 2 BLR 14231 (Rev. 2/23/06) Printed on 12/12/2008 11:25:22 AM I--viliUvgl r dltldl VVIUM 1 1141 1' MFT. $914,665. 111 Hot -Mix Asphalt Ton 6,000 64.00 $384,000. Surface Course Mix C, N-50 111 Hot -Mix Asphalt Ton 4,600 65.00 $299,000. - Surface Course Mix D, N-70 111 Leveling Binder Ton 500 50.00 $25,000. Machine Method N-50 Bituminous Material Gal 12,500 ..2.00 $25,000. 111 Prime Coat Aggregate Prime Coat Ton 100 1.00 $16-0- 1.11 Detector Loop, Type I Foot 930 .18.00 $16,740. 111 Thermoplastic Markings 4" Foot 6,400 1.00 $6,400. 111 Thermoplastic Markings 6" Foot 600 1.40 $840. 111 Thermoplastic Markin s 24" Foot 250 4.00 $1,000. 111 Thermo Letters/Symbols . S. J_ 150 4.40 1660. Total Day Labor Costs Total Estimated Maintenance Operation Cost $914,665. Preliminary Engineering Engineering Inspection Material Testing Total Estimated Engineering Cost Total Estimated Maintenance Cost $914,665. Submitted: Approved: Date Date By: Thomas J. Cech Director of Public Works Page 1 of 2 BLR 14231 (Rev. 2/23/06) Printed on 12/12/2008 11:25:22 AM vjIllinois Department of Transportation Municipal Estimate of Maintenance Costs Section Number 09– 00000 –02 -GM Period from 01/01/2009 to 12/31/2009 Municipality Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation (No. — Description) Gro For Group I. II. or III (Material. Eauioment or Labor) pt -,1 JV. Unit Item Unit Quantity Price Operation Cost Cost P.C.C. Concrete 111 P.C.C. Sidewalk 5 Inch S.F. 55.000 2.85 $156.750. Replacement Contract 111 P.C.C. Sidewalk 8 Inch S.F. 3,000 3.00 $9,000, mean ncn 111 444 P.C.C. Driveway 5 Inch ne-r- n_:......... S.Y. 20025.50 300 $5,100. IVI.1 1 y�v�,vvv ,INI V.1 IVV LI.JV pt -,1 JV. 111 Detectable Warnings 5 in. S.F. 500 10.00 $5,000. 111 Comb. Conc. C+G B-6.12 L.F. 4,500 10.00 $45,000. 111 Comb. Conc. C+G M-5.12 L.F. 7,000 9.75 $68,250. 111 Comb. Conc. C+G B-6.18 L.F. 300 12.00 $3,600. 111 Comb. Conc. C+G B-6.24. L.F. 200 14.00 $2,800. 111 Comb. Conc. C+G M-5.18' L.F. 2,500 12.00 $30,000. 111 Sidewalk Removal S.F. 58,000 1.25 $72,500. 111 Driveway Pavement Removal S.Y. 300 12.00 $3,600. 111 1 Comb. Curb & Gutter Removal L.F. 14,500 4.00 1 $58,000. Total Day Labor Costs Total Estimated Maintenance Operation Cost Preliminary Engineering Engineering Inspection Material Testing Total Estimated Engineering Cost Total Estimated Maintenance Cost Submitted: Approved: Date By. Thomas J—Cech Director of Public Works Municipal Official Title Submit Four (4).Copies to Regional Engineer BLR 14231.02.07. Date Regional Engineer $462,350. $462,350.