Loading...
HomeMy WebLinkAboutRESOLUTION - 15-10 - 3/9/2010 - IDOT / MOTOR FUEL TAX10tnois Department Resolution for Maintenance of Streets and Highways by Municipality of Transportation Under the Illinois Highway Code Resolution No. 15-10 BE IT RESOLVED, by the Mayor and Board. of Trustees of the (Council or President and Board of Trustees) Village of Elk Grove Village , Illinois, that there is hereby (City, Town or Village) (Name) appropriated the sum of $ 1, 074, 839.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from May 1. 2010 (Date) to December 31, 2010 (Date) BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department, a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Schaumburg , Illinois. I, Judith M. Keegan Clerk in and for the Village (City, Town or Village) of Elk Grove Village ,County of Cook and DuPage' hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Mayor and Board of Trustees at a meeting on March 9, 2010 (Council or President and Board of Trustees) Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 9th day of March, 2010 (SEAL) Judith M-. Keegan Approved Village Clerk (City, Town or Village) Date Department of Transportation Engineer Printed 2/26/2010 BLR 14230 (Rev. 11/06) C O O U C caC N (0 .r C T_(n 3 C7 C O L-. U O Z a OO to Z U U (j Q S N 7 v-ov_0v O t- O.qMOIT 06N(-(-Mc6N Ln Z U U (n Q S= N C 7 to O OOr- O Ln Z U U (n Q d 7 N O O in Z U U (n Q S N m 7 to O O to Z U U m Q 2 41 7 (n O U) O to Z U U U Q S N 7 'UD (n O �(D0000MMU)m- ��OU7(D�NN(n O to Z U U U Q S � 7 (n O O V) Z U U N Q S N 0= 7 -ov'O"D (n O O V) Z U U U Q S N m 7 (n O NLtd(Ni O W) Z U U U Q S N C 7 w O O Un Z U U U Q S N 7 (n O O v) Z U U m Q S N of 7 'OD (n O O in Z U U (n Q S G7 m 7 to O O LO Z U U m Q S N C 'C 7 -D to O O O Ln Z U U U Q S N C 't 7 t (D (D I- (D (D (D 00 oO 00 00 (- (- (I- N NN CII NNNNNNNNNNCM U L (AOO(n tn(!)tf)(!)OOOOOO U OM(D�O�M�M—.-l()O(D C r oo � OO M N 00 00 I� ti O 3 O M N —N �� N � J m Q Q Q Q Q Q Q Q Q Q Q Q Q Q 'RF- M Z=22222=2=Z2Z2 W O N -D O .L 'a Q)C 0) m 4) 3 N O p 3 p O m>` 3> F- m C c�0� >a� Q m a�iQ 0 a,Q' C_ O L O J Q O ar,U 'U 3 .0 U O .Q ,C CL L (n CO (0 i O C L 0 C 7 0 0 U '� C O O> O C Z C W W 2 Z J C W f0 m> > Z O J 0 (p J cu co 3 O Ccu m 0 m>> `.`��� C O p > > >m cu O �= 'a F- -0 m 000 c' O o W c c Ocu c0 (0 c c 0 (v J 4) C N 0 0 2 t L (0 0 0 C C C i C C J C O C O N U (n 3 ,C c C c Q) CD O c ca C Y (n O m 0 m s 0 of 3 I= 7 .� 0 m z L U z(n L U 'C m — m U n m � O Z LL O � 3 C N >_N �C�, 70 M C O > > N ` -� Co 7 O J M (U Of E N D Q O U c � a J C f�6 m C O O C O J m `� C p 'C cu N J j O m N C J J N 0 .� ` D O (n cn (O '.: M m` Q E O -o ,C If 'C C m M .N m L a) I IM 0U0m C N 7 C 0m} (0 o UJZmm O c0 L O N C 0) C W C O 0) O Of O Cl) O Q O U O LL 7 a co ao N N O (t Illinois Department of Transportation Municipal Estimate of Maintenance Costs Period from 05/01/2010 to 12/31/2010 Section Number Municipality 10 -00000 -00 -GM Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation (No. — Description) Group (i,u.ui.M For Group I II Item or III Material E ui Unit Quantity ment or Labor Unit Operation Price Cost Cost 2010 Hot -Mix Asphalt II -B Coarse Aggregate CA -6 Ton 617 $ 32.00 $19,744.00 Material Purchase Contract II -B Bituminous Materials Gallon 176 $ 9.00 $1,584.00 Prime Coat 100% MFT II -B Hot -Mix Asphalt Binder Ton 506 $ 50.00 $25,300.00 Course, IL -19.0 III -B Hot -Mix Asphalt Surface Ton 203 $ 58.00 $11,774.00 Course,Mix "C"01-9.5mm) Total Day Labor Costs 1 �I Total Estimated Maintenance Operation Cost $ 58,402.00 Preliminary Engineering $ 0.00 Engineering Inspection $ 0.00 Material Testing $ 0.00 Total Estimated Engineering Cost N/A Total Estimated Maintenance Cost $ 58,402.00 Submitted: Approved: Date Date By: Vito P. Sammarco, P.E. Director of Public Works Municipal Official Title Regional Engineer Submit Four (4) Copies to Regional Engineer Page 1 of 1 ' BLR 14231 (Rev. 2/23/06) Printed on 3/5/2010 12:24:04 PM (t Illinois Department of Transportation Municipal Estimate of Maintenance Costs Period from 05/01/2010 to 12/31/2010 Section Number Municipality 10 - 00000 - 01 - GM Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation Group (No. — Description) (I.II.ui.M For Group I II Item or III Material Equip Unit I Quantity ment or Labor Unit Operation Price Cost Cost 2010 Hot -Mix Asphalt III Removal and Disposal of Cu Yd 81 $49.00 $3,969.00 Resurfacing Contract Unsuitable Material 100% MFT III Sub -Base Granular Sq Yd 466 $ 9.00 $ 4,194.00 Material, Type B 6" III Bituminous Materials Gallon 8,398 $ 1.00 $ 8,398.00 Prime Coat 111 Hot -Mix Asphalt Surface Ton 8,383 $ 67.00 $ 561,661.00 Course, Mix "C", N50 III Hot -Mix Asphalt SurfaceS Yd 83,980 $ 1.55 $ 130,169.00 Removal, 1-1/2" III Class D Patches. 6" So Yd 928 $ 49.00 1 $45.472.00 Total Day Labor Costs Total Estimated Maintenance Operation Cost $ 753,863.00 Preliminary Engineering $ 0.00 Engineering Inspection $ 0.00 Material Testing $ 0.00 Total Estimated Engineering Cost N/A Total Estimated Maintenance Cost $ 753,863.00 Submitted: Approved: Date Date By: Vito P. Sammarco, P.E. Director of Public Works Municipal Official Title Regional Engineer Submit Four (4) Copies to Regional Engineer Page 1 of 1 BLR 14231 (Rev. 2/23/06) Printed on 3/5/2010 12:24:21 PM Illinois Department of Transportation Municipal Estimate of Maintenance Costs Period from 05/01/2010 to 12/31/2010 Section Number Municipality 10 - 00000 - 02 - GM Village of Elk Grove Village Estimated Cost of Maintenance Operations Maintenance Operation Group (No. — Description) (I,n,III,M For Group I II Item or III Material Equi Unit QuantityPrice ment or Labor Unit Operation Cost Cost 2010 Portland Cement III DrivewayPavement Rem S Yd 300 10.00 3,000.00 Concrete Replacement Contract III Comb Curb Gutter Rem Foot 6,810 $ 4.00 $ 27,240.00 100% MFT III Sidewalk Removal S Ft 26,500 $ 1.25 $ 33,125.00 III Protective Coat S Yd 4,920 $ 1.50 $ 7,380.00 III PCC DrivewayPavt 5" S Yd 200 $ 28.00 $ 5,600.00 III PCC DrivewayPavt 8" S Yd 100 $ 38.00 $ 3,800.00 III PCC Sidewalk 5" Sq Ft 25,000 $ 3.40 $ 85,000.00 III PCC Sidewalk 8° Sq Ft 1,000 $ 4.50 $ 4,500.00 III Detectable Warnings Sq Ft 500 $ 12.00 $ 6,000.00 III Comb CC&G Ty 8-6.12 Foot 1,980 $ 12.50 $ 24,750.00 III Comb CC&G Ty 8-6.18 Foot 300 $ 14.00 $ 4,200.00 III Comb CC&G Ty 8-6.24 Foot 200 $ 17.00 $ 3,400.00 III Comb CC&G Ty M-5.12 Foot 3,230 $ 12.30 $ 39,729.00 III Comb CC&G Ty M-5.18 Foot 1,100 $ 13.50 $ 14,850.00 Total Day Labor Costs Total Estimated Maintenance Operation Cost $ 262,574.00 Preliminary Engineering $ 0.00 Engineering Inspection $ 0.00 Material Testing $ 0.00 Total Estimated Engineering Cost N/A Total Estimated Maintenance Cost $ 262,574.00 Submitted: Approved: Date By: Vito P. Sammarco, P.E. Director of Public Works Municipal Official Title Submit Four (4) Copies to Regional Engineer Date Regional Engineer Page 1 of 1 BLR 14231 (Rev. 2/23/06) Printed on 3/5/2010 12:24:36 PM