Loading...
HomeMy WebLinkAboutICRC - 11/06/1997 - INDUSTRIAL/COMMERCIAL REVITALIZATION COMMISSION MEETING November 6, 1997 5:30 p.m. Chernick Conference Room Commissioners Present: Jim Petri, Co-Chairman Sam Lissner, Co-Chairman Tom Farrell John Gullo Jeff Snyder Jack Connelly Tom Porte Scott Golbeck Bob Kleckauskas Ron Behm George Johnson Commissioners absent: Frank Ciangi Staff present: Nancy Carlson Alan Boffice Tom Cech Fred Engelbrecht Dion Zinnel Chairman Petri reported that he had met with Department Heads to help clarify their roles at Revitalization Commission Meetings. He stressed the importance of staff addressing issues brought up at these meetings. Tom Farrell reported that he and several other bankers from Elk Grove had met with Don Eslick to discuss ways that the banks can be involved in the Revitalization program. A second meeting is scheduled for November 10. It was the consensus on the Commission to hold the January 8 regular meeting of the Commission without the consultant for the purpose of reviewing the draft plan . Planning Resources' agenda for January will be moved to February. Commercial/Industrial Revit Comm. Mtg Minutes 11-6-97 page 2 The Commission adjourned to Rooms ABC to continue the meeting with the consultant. Consultants present: Pete Pointner, Planning Resources Amy Skarr, Planning Resources Keven Graham, Planning Resources Larry Lund, Real Estate Planning Group Don Eslick, Public Finance Assoc. Karl Heitman, Heitman Architects Kathleen Meyerkord, Civiltech Engineering Bob Andres, Civiltech Engineering Guests present: Paul Petzold See attached minutes prepared by Pete Pointner. Meeting was adjourned at 8:50 p.m. cc: Commercial/Industrial Revitalization Commission President and Board of Trustees Village Clerk Village Manager Director, Engineering & Community Development Finance Director Director, Public Works Police Chief Economic Development Officer NOV 25 '97 12:56PM PLANNING RESOURCES P.2/2 NPP/l`Ii�R lannin}gQ@ esourCeS PLANNERS • ECCLOGISTS • LANDSCAPE ARCMITECTS Memorandum P9728-00 To: Industrial/Commercial Revitalization Commission Members From: N.J. "Pete" Pointner II,AIA, AICP Planning Resources Inc. Date: November 25, 1997 Subject: Minutes of November 6, 1997 Meeting Present: See attached attendance roster. Purpose of the Meeting: See attached agenda. Items Distributed; 1. Transportation Elements;prepared by Civiltech Engineering, Inc. 2. Existing Conditions/Transporration Elements;prepared by Civiltech Engineering, Inc. 3. Intersection Improvement Concepts/Transportation Elements;prepared by Civiltech Engineering, Inc. 4. Evaluation and Recommendations for Unincorporated Parcels Contiguous to the Elk Grove Industrial Park; prepared by Planning Resources Inc. 5. Streetscape design concepts;prepared by Planning Resources Inc. Items Discussed: 1. The street signs were discussed. One of the Commissioners asked what the benefit of coloring all of the street signs different colors would be? He expressed concern regarding replacing the signs and having to make sure the signs are replaced correctly in terms of size and color. Pete Pointner stated that the team had given more thought to the design of the street signs as can be seen on the exhibits prepared by Planning Resources. The signs are proposed to be the same color. However, arterial roadways, such as Busse Road, warrant larger size signs for safety purposes and to meet state and federal guidelines. Planning Resources VM. • 615 West Front Street • WheaTon. Illinois 60187 • Ph:630.668.3788 • Faa:630.668.4125 NOV 25 '97 12:56PM PLANNING RESOURCES P.3i6 Page 2 November 6, 1997, Meeting Minutes, continued November 25, 1997 2. The team will be meeting with the Elk Public Works Department to discuss: a. Maintenance implications; and b. Funding for the maintenance. 3. Kathy Meyerkord, Civiltech Engineering, Inc., gave an update of the various transportation studies being conducted by the Illinois Department of Transportation (IDOT)which will have great impact on Elk Grove Village and the study area. She stressed the importance of the Village maintaining contact with'DOT in the future regarding the status of these studies to promote recommendations which will be incorporated into the Master Plan. 4. Presentation and Discussion of Transportation Elements and Intersection Improvement Concepts—Kathy Meyerkord explained the Intersection Level of Service (LOS) determination used to assess intersections. Concepts for improvements were presented for intersections which currently operate at LOS D,E or F. Examples of improvements include: road widening; mad straightening; improved turning radii; and addition and elimination of cross-overs on Tonne Road. By adopting improvement concepts and presenting them to IDOT for funding assistance, the Village helps to ensure the likelihood that IDOT will implements these plans in the future and assist in funding. 5. Several intersections were discussed and concepts for improvements were presented and explained. Discussion ensued regarding the difficulty of westbound traffic on Landmeier Road successfully getting through the traffic signal at Tonne when turning south onto Tonne Road. Kathy Meyerkord will discuss the possibility of improving the timing at this intersection with Cook County. 6. Pete Pointner, Planning Resources Inc., asked the Commissioners to think about what they would like to see displayed on the monument entry signs: "Elk Grove Village", or "Elk Grove Village Industrial Park". The limits of the industrial park have expanded beyond.the original Centex development. Therefore, the title could be changed or added to (ie. "Elk Grove Technology Center"). The water tower,which will be painted next spring, could display the same title as the monument entry signs,in addition to a profile of the"elk". 7. Pete Poinmer presented slides showing a design concept alternative for a parkway treatment opposite loading docks. This treatment would address the problem of narrow streets and shallow loading bays by carving out an area within the parkway across the street, opposite the loading dock, and installing reinforced precast pavers for a carriage walk the length of the maneuvering bay. The advantage of this concept is that it can be applied at specific locations where warranted by a combination of traffic and cramped loading bay access. It was pointed out that there are some blocks where loading bays are continuous and may be NOV 25 '97 12:5GPM PLANNING RESOURCES P.4/8 Page 3 November 6, 1997,Meeting Minutes, continued November 25, 1997 better addressed by street widening or reconfiguration of loading bays. This will provide for truck turning movements in areas where there is existing difficulty. -8. Presentation and Discussion of Landscape and Streetscape Design Alternatives for IL Route 83,Tonne Road and Key Intersections—Pete Poinmer and Keven Graham, Planning Resources Inc. presented slides and exhibits displaying design alternatives. The alternatives address the following areas: a. Street signs; b. Entry signs; c. Concrete medians; d. Pedestrian movement; C. Bus shelters; f. Mail drop-offs; g. Landscape treatments between road and edge of right-of-way; h. Boulevard along Tonne Road and Commonwealth Edison towers; i. Employee common an.-as (pocket parks); and j. Busse Road concepts i.'or various cross sections. 9. Pete Pointner explained the steps of t1;ie improvement plan: a. Identify alternatives to be implemented; b. Develop unit cost and total cost of improvement to implement in all applicable locations; C, Assign priorities; d. Develop time frame; and e. Balance funding with implementation plan. Improvements to Busse Road/U_Route 83 should be integrated with the IDOT SRA (Strategic Regional Arterial) study. When IDOT is ready to improve Busse Road/rL Route 83, the Village will be prepared with adopted improvement plans. 10. Pete briefly described the handout regarding the unincorporated parcels contiguous to the industrial park. Any comments or questions can be addressed at the next meeting. Follow-up The next Commission meeting with the consultant team will be held Thursday, December 4, 1997 at 6!15 p.m. The focus of the meeting will be on the full draft plan document and locations for design prototypes. C:AksfiIes0kgrove\MINUTES111-06.97.wpd