HomeMy WebLinkAboutPLAN COMMISSION - 02/20/1985 - TRANSUNION PETITION FOR REZONING 85-7 Minutes
ELK GROVE VILLAGE PLAN COMMISSION
Date: Wednesday, February 20, 1985
Location: Trustees' Conference Room
Municipal Building
901 Wellington Avenue
The meeting was called to order by Acting Chairman Leah Cummins at 8:12
p.m.
Members Present: Members Absent:
Leah Cummins, Secretary John Glass
Orrin Stangeland George Mullen
Clark Fulton
Fred Geinosky
Dave Paliganoff
Staff Present:
Thomas Rettenbacher, Building Commissioner
Robin Weaver, Administrative Assistant
Clark Fulton summarized the February 9 Plan Commission's special meeting
at Just Pants.
Thirty-three local residents arrived to attend the public hearing.
Additional chairs were arranged in an attempt to accommodate them.
The public hearing began at 8:47 p.m.
Public Hearing: Docket 85-2 - Transunion Petition for Rezoning
The petitioners are the contract purchasers of the 22.7 acre
parcel at the northwest corner of Meacham and Biesterfield Roads.
They will develop the property and operate the proposed shopping
center, tentatively named, The Village Center. The attorney repre-
senting the petitioners, Chuck Byrum, introduced Cliff DeLorenzo, an
architect with Envirotecnics; Bob Cowhey, an engineer with Cowhey
Associates, Ltd. ; and Don O'Hara, a traffic engineer with Barton-
Aschman Associates.
Chuck Byrum described the surrounding uses as commercial and
residential. He then displayed a map of the 1973 Vale Tract which
indicated Centex's intent for the parcel to be zoned commercial. The
Vale Tract indicates 16.2 acres as B-3 and 18.7 acres as B-2. Also,
recent plats have shown the area as B-2 and B-3. Chuck Byrum stated
that the petitioners are prepared to develop two of three phases on
the property during this calendar year as described:
Phase 1: 10.97 acres of B-2 zoned property for a food
store of 63,000 square feet and retail stores
totaling 46,300 square feet.
Revised 3/6/85
• 0
Minutes
ELK GROVE VILLAGE PLAN COMMISSION
Date: Wednesday, February 20, 1985
Location: Trustees' Conference Room
Municipal Building
901 Wellington Avenue
The meeting was called to order by Acting Chairman Leah Cummins at 8:12
p.m.
Members Present: Members Absent:
Leah Cummins, Secretary John Glass
Orrin Stangeland George Mullen
Clark Fulton
Fred Geinosky
Dave Paliganoff
Staff Present:
Thomas Rettenbacher, Building Commissioner
Robin Weaver, Administrative Assistant
Clark Fulton summarized the February 9 Plan Commission's special meeting
at Just Pants.
Thirty-three local residents arrived to attend the public hearing.
Additional chairs were arranged in an attempt to accommodate them.
The public hearing began at 8:47 p.m.
Public Hearing: Docket 85-2 - Transunion Petition for Rezoning
The petitioners are the contract purchasers of the 22.7 acre
parcel at the northwest corner of Meacham and Biesterfield Roads.
They will develop the property and operate the proposed shopping
center, tentatively named, The Village Center. The attorney repre-
senting the petitioners, Chuck Byrum, introduced Cliff DeLorenzo, an
architect with Envirotechnics; Bob Cowhey, an engineer with Cowhey
Associates, Ltd. ; and Don O'Hara, a traffic engineer with Barton-
Aschman Associates.
Chuck Byrum described the surrounding uses as commercial and
residential. He then displayed a map of the 1973 Vale Tract which
indicated both Centex's and the Village's intent for the parcel to be
zoned commercial . The Vale Tract indicates 16.2 acres as B-3 and
18.7 acres as B-2. Also, recent plats have shown the area as B-2
and B-3. Chuck Byrum stated that the petitioners are prepared to
develop two of three phases on the property during this calendar
year as described:
Phase 1: 10.97 acres of B-2 zoned property for a food
store of 63,000 square feet and retail stores
totaling 46,300 square feet.
PC Minutes - 2 - February 20, 1985
Docket 85-2 (continued)
Phase 1A: 2.20 acres of B-3 zoned property for two (2)
kiosks of 4,200 square feet each.
Phase 2: 9.53 acres of B-2 zoned property for undetermined
use, to be developed in the future.
The attorney indicated that no variations were sought and that
the current land plan utilized parking stall sizes of 9' x 19' but that
space was sufficient to accommodate spaces of 10' x 20' if required by
the Village Board. The request of the petitioners is for plan approval
and rezoning of Phases 1 and 1A and rezoning of Phase Ii.
Cliff DeLorenzo reported that his market analysis projected the
site to be an excellent one for a neighborhood shopping center. He
indicated that 68,000 people live within a three mile radius of the
site. In order to buffer the residents from the shopping center, the
existing 50' wide, four to five foot berm would remain and that parking
would be away from the residences. The rear of the shopping center
will be constructed with face brick, all stores will be required to
enclose refuse within the stores (not in back) , and the food store
will be required to use a compactor to reduce the size of refuse and
possibility of litter. Cliff DeLorenzo indicated that the developers
would prefer a 24 hour emergency clinic or a banking facility in the
B-3 zoned portion. He noted that the interior traffic plan serves
to guide truck traffic along the side of the development rather than
through the parking area. The berm will be landscaped.
Bob Cowhey explained that all storm sewer, sanitary sewer and
water mains and plans will be in compliance with all Village codes and
ordinances and that the development will have no detrimental impact on
Village systems or the surrounding system. An economic impact report
was submitted and is attached to these minutes.
Don O'Hara testified that there would be no traffic circulation
problem to or from the site.
Dave Paliganoff queried what evidence indicated this would be the
highest and best use of the land. Cliff DeLorenzo responded that
there exists a shopping vacuum in this area and with Biesterfield
Road going through to Meacham Road, commercial use would be preferential
to residential; and given the existing berm and adjacent commercially
zoned corners, commercial would be natural for the location. "Upscale"
shops such as computer stores, candy stores, children's wear, etc. ,
will be sought as well as a food store, a drug store and a large
hardware store. The retail stores would be single story users. The
food store building height would be approximately 24'4" rather than the
usual 21'8" height. it could be three to five years before Phase II
would be developed, according to Cliff DeLorenzo.
The placement of the curb cut opposite Texas Street was discussed.
Orrin Stangeland inquired as to whether or not the petitioner
would be willing to exclude certain B-3 uses. Chuck Byrum responded
that limiting B-3 uses would not be consistent with surrounding zoning.
In response to another question by Orrin Stangeland, Chuck Byrum stated
that original purchasers of the residential properties to the north
and west of the site were shown as proposed commercial development
of the site on advertising, and also signed letters stating their
PC Minutes - 3 - February 20, 1985
Docket 85-2 (continued)
knowledge of the commercial zoning at closing on their own properties.
Orrin Stangeland asked about hours of operation and similar developments.
Cliff DeLorenzo stated that a 24 hour operation of the food store
would be very unlikely and that truck deliveries to suburban stores are
generally during daylight hours. A similar development is in Park
Forest.
Fred Geinosky asked about the size of the food store, competition
and truck traffic. Cliff DeLorenzo responded that this one would be
63,000 square feet, whereas the Butera on Nerge Road is 28,000 square
feet; competition would not be a problem, especially as Eagle will be
pulling out of the Chicago area market; and between 28 and 35 trucks
could be expected per week to supply the food store.
Clark Fulton asked what the distance from the building to the
residences would be and was informed that the distance would be at
least 150 feet.
Various local residents brought up concerns regarding noise,
truck traffic, lighting, the need for additional shopping and signage.
The petitioners responded that noise and truck traffic would be
primarily during daylight hours; lighting would be directed at the
shopping center rather than at surrounding properties and would meet
Village codes to insure safety; and they felt that shopping is needed
and will do well and accordingly are willing to put a lot of money
into this project.
Chuck Byrum noted that with a parcel this size, it was impossible
to have all retail clients signed up with engineering and site plans
perfected. This was why the request was for rezoning and partial
plan approval.
Leah Cummins requested that the topic be discussed at the next
Plan Commission meeting on March 6, 1985 at 8 p.m.
The public hearing was adjourned at 11:49 p.m.
Respectfully submitted,
Robin A. Weaver
Administrative Assistant
ms
c: Chairman & Members of Plan Commission, Village President, Board of
Trustees, Village Clerk, Village Manager, Assistant Village Manager,
Administrative Assistant, Building Commissioner, Village Engineer,
Director of Public Works, Fire Chief, Deputy Fire Chief, Village
Attorney, Park District, NWMC, Centex., C. Byrum.
,
ECONOMIC IMPACT STATEMENT
Phase 1 and lA Only (Total 13 . 17 Acres)
Village Center
Elk Grove Village, Illinois
Real Estate Taxes
Conservative estimates value Phase 1 and Phase 1A, when
developed , at $6,030 ,000 . Assessing the property at 40% of
value (per the Cook County Assessor) and applying the 1983
equalization factor of 1. 9122 , we get an unequalized valuation
of $2 ,412 ,000 and an equalized valuation of $4 , 612 ,226.
Applying the 1983 tax rates for the subject property, the
following annual tax revenues are projected for the following
bodies :
Agency Description 1983 Tax Rate Tax Revenue
County of Cook 0 .865 $39,895
Forest Preserve District
of Cook County 0. 116 5, 350
Suburban TB Sanitarium 0 . 012 553
Consolidated Elections 0. 042 1, 937
Township of Schaumburg 0 .061 2 , 813
Road & Bridge Schaumburg 0 . 029 1, 337
General Assistance
Schaumburg 0. 010 461
Metropolitan Sanitary
District of Greater
Chicago 0 . 715 32 ,974
Northwest Mosquito
Abatement District 0. 016 737
Palatine Township
High School 211 2 .356 108, 664
Community College District
512 0. 187 8, 624
Elk Grove Park District 0 .356 16, 419
Village of Elk Grove Village 0 . 719 33 , 161
School District CC 54 2 . 614 120 ,563
Sales Taxes
Annual sales taxes received by the Village for the business
operations on Phase 1 and Phase lA are projected as follows :
Phase 1 Food Store . $15, 000,000 x 1% = $150 , 000
Small Shops $46,300 SF @ $150/SF
$6 , 945, 000 x 1% 69 , 450
$219,450
Phase 2 ( if retail use)
Kiosk ;T'1 900, 000 x 1% $ 91000
Kiosk T2 900 ,000 x 1% 91000
$18, 000
-2-
s: �•